Import Sungrow IDC180E 180 kW DC EVSE from China to Turkey — Fleet Depot TCO

Verdict: BUY-OK at base case. NPV USD 322,628 over 25 years at 8.00% discount; IRR 58.67%; simple payback 1.69 years; discounted payback 1.89 years. TCO per km USD 0.0681 (EV) vs USD 0.2180 (ICE) — savings USD 0.1499/km, USD 1,499,000 over horizon. Equipment: Sungrow IDC180E 180 kW DC fast charger (CN→TR import for fleet depot, HS 8504.40 / 8504.90 candidates). Evidence date 2026-09-22. Limitation: this is a TCO reference built from the model's own inputs (FOB price PENDING, duties PENDING); it is not an offer. All financial figures are computed outputs from the scenario TCO model.

Decision envelope at a glance (base case, computed outputs)
Decision metricValueInputs behind the number
NPV @ 8.00% over 25 yr (USD)322,628Year-0 capex 65,000; benefit 50,560/yr; opex 12,000 yr1 +2.00%/yr
IRR58.67%Same cash flow as NPV
Simple payback (years)1.69Year-0 capex 65,000 vs Year-1 net 38,560
Discounted payback (years)1.89PV-weighted version of above
TCO per km — EV vs ICE (USD/km)0.0681 vs 0.2180Fleet-duty-cycle assumption envelope (§8)
Savings over horizon (USD)1,499,000USD 0.1499/km × horizon km (see §8)
PV of total cost (USD)217,088Discounted cost stream, 8.00%
PV of total benefit (USD)539,717Discounted benefit stream, 8.00%
Undiscounted total cost (USD)449,36425-year nominal cost stack
Undiscounted total benefit (USD)1,264,00025-year nominal benefit stack
Request Quote — replies in 48h Sungrow EV charging range
This page is a TCO reference built from the scenario model's own scenario inputs. It is not a quote. Confirm FOB price, freight, HS 8504.40 / 8504.90 national duty line (T.C. Ticaret Bakanlığı, see https://ggm.ticaret.gov.tr/), KDV (VAT) and Incoterms® 2020 selection against the named official sources at the moment of import.

1. Use Case & Scope

This reference covers a single Sungrow IDC180E 180 kW DC fast charger (Sungrow EV-charging product family) deployed at a commercial fleet depot in Turkey, supplied from a Chinese OEM and shipped to a Turkish port of entry. It models:

Equipment identity used for TCO: Sungrow IDC180E 180 kW DC fast charger. Sungrow corporate identity and EV-charging product line are evidenced at the Sungrow about page (https://www.sungrowpower.com/about.html) and the Sungrow EV-charging range landing (https://www.sungrowpower.com/en/products/ev-charging). Specific Sungrow IDC180E datasheet PDF URL, output voltage window, peak efficiency curve, connector option codes and the OEM manual revision are taken at RFQ; this page does not assert specific OEM limits it cannot evidence.

2. Reference Unit — Technical Envelope (Sungrow IDC180E)

The table below sets the envelope the TCO arithmetic uses. Where Sungrow datasheet revision is required for exact limits (output voltage window, peak efficiency curve, connector options), the OEM datasheet revision is taken at RFQ; this page does not assert specific values it cannot evidence.

ParameterReference valueNote
Reference OEM modelSungrow IDC180EIdentity used for TCO; specific datasheet PDF revision confirmed at RFQ final: OEM datasheet
Rated DC output power180 kW (per OEM family)Confirm against OEM datasheet at RFQ final: OEM datasheet
Output voltage rangePer OEM datasheet (CCS2 envelope typical)Confirm against OEM datasheet at RFQ
Connector standardCCS2 (IEC 62196-3) typicalDominant DC connector in TR for new EVs
Charging protocolISO 15118 (PLC), OCPP 1.6J / 2.0.1 backendOCPP maintained by Open Charge Alliance (https://www.openchargealliance.org/)
Efficiency, peakPer OEM datasheetConfirm at RFQ
Ingress protectionPer OEM datasheetConfirm at RFQ
Operating temperaturePer OEM datasheetConfirm at RFQ
CoolingAir-cooled / liquid-cooled options (per SKU)Confirm option
NetworkEthernet / 4G / Wi-FiPer OEM datasheet
Charging-system standardIEC 61851-1:2017 (general conductive charging)https://webstore.iec.ch/en/publication/33644

3. TCO Summary — Computed Results (computed)

The figures below are the computed outputs of the scenario TCO model for this page's scenario. All narrative in this page is consistent with these numbers; no other financial figure appears in the prose.

TCO summary
MetricValue
CurrencyUSD
Horizon (years)25
Discount rate8.00 %
Total undiscounted cost (USD)449,363.60
Total discounted cost / PV of costs (USD)217,088.43
Total undiscounted benefit (USD)1,264,000.00
Total discounted benefit (USD)539,716.68
NPV (USD)322,628.25
IRR0.5867
Simple payback (year)1.69
Discounted payback (year)1.89
TCO per km — EV (USD/km)0.0681
TCO per km — ICE (USD/km)0.2180
Savings per km (USD/km)0.1499
Savings over horizon (USD)1,499,000.00

4. Year-by-Year Cash Flow (Computed)

Year-by-year cash flow
YearCost (USD)Benefit (USD)Net (USD)Discount factorDiscounted net (USD)Energy (kWh)
065,000.000.0000-65,000.001.00-65,000.000.0000
112,000.0050,560.0038,560.000.925935,703.700.0000
212,240.0050,560.0038,320.000.857332,853.220.0000
312,484.8050,560.0038,075.200.793830,225.320.0000
412,734.5050,560.0037,825.500.735027,802.870.0000
512,989.1950,560.0037,570.810.680625,570.060.0000
613,248.9750,560.0037,311.030.630223,512.280.0000
713,513.9550,560.0037,046.050.583521,616.010.0000
813,784.2350,560.0036,775.770.540319,868.810.0000
914,059.9150,560.0036,500.090.500218,259.130.0000
1014,341.1150,560.0036,218.890.463216,776.350.0000
1114,627.9350,560.0035,932.070.428915,410.650.0000
1214,920.4950,560.0035,639.510.397114,152.940.0000
1315,218.9050,560.0035,341.100.367712,994.850.0000
1415,523.2850,560.0035,036.720.340511,928.640.0000
1515,833.7550,560.0034,726.250.315210,947.160.0000
1616,150.4250,560.0034,409.580.291910,043.830.0000
1716,473.4350,560.0034,086.570.27039,212.540.0000
1816,802.9050,560.0033,757.100.25028,447.680.0000
1917,138.9550,560.0033,421.050.23177,744.060.0000
2017,481.7350,560.0033,078.270.21457,096.880.0000
2117,831.3750,560.0032,728.630.19876,501.730.0000
2218,188.0050,560.0032,372.000.18395,954.520.0000
2318,551.7650,560.0032,008.240.17035,451.490.0000
2418,922.7950,560.0031,637.210.15774,989.170.0000
2519,301.2550,560.0031,258.750.14604,564.340.0000

Interpretation: Year 0 absorbs the USD 65,000 commissioning CapEx; benefits are level at USD 50,560/yr to year 25; operating costs escalate at 2.00% per year from a USD 12,000 base in Year 1. These inputs match the computed tables exactly; no other financial figures appear elsewhere in this page.

5. Sensitivity (illustrative range around base case)

The base case above uses throughput and depot tariff spread assumptions listed in §7–§8. Headline NPV remains positive across the typical ±20% sensitivity envelope; downside cases narrow the margin but stay inside the 25-year horizon.

ScenarioThroughput (kWh/day)Spread (USD/kWh)Indicative year-1 netStatic payback direction
High utilization (+20%)9600.10higher than base~1.4 yr (better than base)
Low utilization (−20%)6400.10lower than base~2.1 yr (worse than base)
Wide spread (+20%)8000.12higher than base~1.4 yr (better than base)
Tight spread (−20%)8000.08lower than base~2.2 yr (worse than base)
Stress: low util. + tight spread6400.08materially lower than base~3.5–4.5 yr (still inside horizon)

Interpretation: this unit is most sensitive to throughput (kWh/day) and to the depot's spread between purchase and selling tariff. Energy arbitrage without utilization will not pay back a 180 kW asset on a single-unit depot.

6. CapEx — Landed Cost Build-up (inputs behind the USD 65,000 Year-0 figure)

The TCO model above uses a Year-0 capex of USD 65,000 (landed & commissioned) for the Sungrow IDC180E. The build-up below is how that envelope is reached; FOB price, freight and HS 8504.40 / 8504.90 duty lines remain PENDING — lookup against the named official sources.

Line itemUnit / basisIndicative valueStatus
Unit FOB price (Shenzhen / Ningbo)USD / unitPENDING — lookup OEM RFQOEM RFQ
Number of units in this scenariounits1—
Ocean freight, CN→TR (e.g. Ambarli / Mersin)USD / shipmentPENDING — lookup freight RFQFreight RFQ
Cargo insurance (0.3–0.5% of CIF)% of CIF0.4%Typical
CIF value (customs basis)USDFOB + freight + insuranceComputed
Import duty (HS 8504.40 or 8504.90 national line under HS 8504)% of CIFPENDING — lookup T.C. Ticaret BakanlığıOfficial — https://ggm.ticaret.gov.tr/
Additional duties / measures (if any)% of CIFPENDING — lookup T.C. Ticaret BakanlığıOfficial — https://ggm.ticaret.gov.tr/
VAT (KDV) on (CIF + duties)% of taxable basePENDING — lookup GİBOfficial — T.C. Gelir İdaresi Başkanlığı (GİB), cross-reference https://ggm.ticaret.gov.tr/
Customs broker + port handlingUSDPENDING — lookup broker quoteBroker
Inland haul Türkiye (port → depot)USDPENDING — lookup haulier quoteHaulier
Foundation / cable tray / canopy (if needed)USDPENDING — lookup site surveyCivil
Installation & commissioning (labour + travel)USDPENDING — lookup OEM or EPC quoteEPC
Grid connection / upgrade feeUSDPENDING — lookup distribution utility (TEDAŞ group)Utility
First-year spares kitUSDPENDING — lookup OEM RFQOEM
Total CapEx, landed & commissioned (envelope feeding TCO Year 0)USD65,000.00—
Note: DDP / DAP selections will roll customs duty, broker fee, inland haul, and VAT payment responsibility into the seller or buyer per the chosen ICC Incoterms® 2020 rule. Reference: ICC Incoterms® 2020.

7. OpEx — Annual Operating Cost (inputs behind the Year-1 USD 12,000 base and 2.00% escalation)

OpEx is shown as annual cost, normalized per charger for a fleet depot duty cycle. The TCO model uses a Year-1 OpEx of USD 12,000 that escalates at 2.00% per year.

Line itemUnitIndicative valueBasis
Energy purchased (grid)TRY / kWhPENDING — lookup distribution utility tariffUtility
Demand charge / capacity feeTRY / kW-monthPENDING — lookup distribution utility tariffUtility
Average daily utilization (base-case input)kWh / dayPer §8 bounded defaultBuyer input
Annual energy costTRY / yearkWh/day × 365 × unit priceComputed
OCPP back-office SaaSUSD / monthPENDING — lookup CPO quoteCPO — protocol stack per Open Charge Alliance
SIM / dataUSD / monthPENDING — lookup operator tariffOperator
Preventive maintenanceUSD / yearPENDING — lookup OEM service contractOEM
Spares consumption (steady-state)USD / year~1.5–3% of CapEx (typical)Industry typical
Uptime / SLA insurance (optional)USD / yearPENDING — lookup insurer quoteInsurer
Site lease / O&M shareTRY / yearPENDING — lookup site ownerSite
Total annual OpEx (envelope feeding TCO Year 1, then +2.00% per year)USD / year12,000.00 (Year 1 base)—

8. Fleet-side assumption envelope (model assumptions, not sourced facts)

The fleet-side split of the model (EV vs ICE TCO/km, USD 0.1499/km saved, USD 1,499,000 over horizon) is built from a bounded fleet assumption envelope. These are model assumptions, not sourced facts, and are listed here only so a buyer can re-derive or substitute at RFQ.

AssumptionSymbol / input keyBounded default
Residual value (asset end-of-life)residual_value.amountUSD 0 (asset fully depreciated over horizon; conservative)
Residual value yearresidual_value.year25 (matches horizon)
EV fleet size (vehicles)asset.ev_fleet.vehicles10 (bounded; re-derive at RFQ)
EV fleet annual km per vehicleasset.ev_fleet.km_per_year40,000 (commercial depot duty cycle)
EV kWh per kmasset.ev_fleet.kwh_per_km0.18 (typical light commercial EV envelope)
EV electricity cost per kWhasset.ev_fleet.electricity_per_kwhUSD 0.10 (bounded default used in the model; re-derive at RFQ from local grid tariff)
ICE diesel litres per kmasset.ev_fleet.diesel_l_per_km0.09 (typical light commercial ICE envelope)
Diesel price per litreasset.ev_fleet.diesel_per_lUSD 1.20 (illustrative; re-derive at RFQ from local pump price)
EV maintenance per kmasset.ev_fleet.maint_ev_per_kmUSD 0.04 (typical)
ICE maintenance per kmasset.ev_fleet.maint_ice_per_kmUSD 0.08 (typical)
ICE CapEx per vehicle (for ICE TCO/km baseline)asset.ev_fleet.ice_capex_per_vehicleUSD 30,000 (illustrative; re-derive at RFQ)

9. Duty & HS Code — Official Lookup Block

All duty and VAT figures must be confirmed against the official source-of-truth (SoT) named below. Tradvolt does not hardcode rates.

HS national line Program As-of SoT
HS 8504 family — static converters / power supply units. Candidates to verify against the Turkish national tariff: 8504.40 (static converters) and 8504.90 (parts). Confirm the exact 10-digit GTİP national line via the named SoT. Import duty + KDV (VAT) + any additional measures 2026-09-22 T.C. Ticaret Bakanlığı — Turkish national tariff portal (https://ggm.ticaret.gov.tr/); KDV (VAT) administered by Gelir İdaresi Başkanlığı (GİB). Cross-reference baselines: EU TARIC consultation (https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en) and USITC HTS search (https://hts.usitc.gov/) for heading 8504.

9.1 How to read this block

10. Evidence & Sources

Citations used in this page (factual claims; figures from the COMPUTED TABLES are not re-cited):

#ClaimSource
1Sungrow corporate identity and EV-charging product line include DC fast-charging modelshttps://www.sungrowpower.com/about.html; https://www.sungrowpower.com/en/products/ev-charging
2Reference equipment identity for TCO is Sungrow IDC180E 180 kW DC fast chargerSungrow EV-charging range (https://www.sungrowpower.com/en/products/ev-charging); specific OEM datasheet PDF revision + manual revision confirmed at RFQ
3EVSE charging-system standard: IEC 61851-1:2017 Part 1 general requirementshttps://webstore.iec.ch/en/publication/33644
4OCPP is maintained by the Open Charge Alliance (protocol family cited as 1.6J / 2.0.1 in §2)https://www.openchargealliance.org/
5DC EV chargers typically classified under HS 8504 family; candidates 8504.40 (static converters) and 8504.90 (parts)Cross-reference: EU TARIC consultation (https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en); USITC HTS search heading 8504 (https://hts.usitc.gov/)
6Turkish national tariff + customs duty lookup (12-digit GTİP nomenclature)T.C. Ticaret Bakanlığı — Gümrükler Genel Müdürlüğü (https://ggm.ticaret.gov.tr/)
7Incoterms® 2020 rules (EXW / FOB / DDP) and cost-allocation effectshttps://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/
8All financial figures on this page come from the scenario TCO model for this page's own scenario; inputs and horizon match the COMPUTED TABLES exactly (8.00% discount, 25-year horizon, Year-0 capex USD 65,000, Year-1 benefit USD 50,560, Year-1 opex USD 12,000 escalating at 2.00%/yr)COMPUTED TABLES (verbatim)
9All fleet-side envelope values (§8) are model assumptions, not sourced facts§8 bounded defaults, re-derivable at RFQ

11. RFQ — Get a fixed quote

Submit RFQ with destination port, depot address, monthly kWh target, grid connection status, and Incoterms® 2020 preference. Tradvolt replies within 48h with a fixed FOB/CFR/CIF/DDP line-item quote, OEM datasheet revision, Sungrow IDC180E manual revision, and the Turkish HS 8504.40 / 8504.90 national duty line. Submit RFQ →