Illustrative simple payback ≈ 4.15 yr and discounted payback ≈ 4.89 yr on a 249.63 EUR/module CapEx (ex. duty/VAT), at 0.18 EUR/kWh avoided tariff, 6.00 % WACC, 25-year horizon, agrivoltaic elevated site in Lithuania. NPV ≈ +588.87 EUR/module; LCOE ≈ 0.0538 EUR/kWh (discounted, 6.00 % WACC). Equipment: a 610 W bifacial monocrystalline PV module in the LONGi Hi-MO 6 LR5-66HTH or Jinko Solar Tiger Neo N-type 78HL4-BDV reference family. Location: Klaipėda import + Lithuanian project site. Horizon: 25 years. Evidence date (input snapshot): 2026-09-21. Limitation: figures are computed by TradVolt's scenario model from the scenario inputs disclosed in §4 and are ILLUSTRATIVE — NOT A QUOTE; EU customs duty and import-VAT lines are framework-only and marked PENDING with a named official portal as source-of-truth.
| Decision metric | Value | Time basis |
|---|---|---|
| NPV (EUR per module) | 588.87 | Discounted, 25 yr, WACC 6.00 % |
| Discounted payback (yr) | 4.89 | Discounted, cumulative discounted net crosses zero between Y4 and Y5 |
| Simple payback (yr) | 4.15 | Undiscounted, cumulative net crosses zero between Y4 and Y5 |
| LCOE (EUR/kWh) | 0.0538 | Discounted PV of costs ÷ lifetime energy, 6.00 % WACC |
| CapEx per module (EUR) | 249.63 | Ex. duty & VAT (PENDING) |
| IRR | 0.2469 (≈ 24.69 %) | Unlevered, project basis |
This page models a single reference SKU, AGRI-610W-LT-CN, against a named, publicly marketed module family. Final electrical and mechanical values must be confirmed against the OEM datasheet attached to the RFQ response.
| Parameter | Reference family value | OEM datasheet |
|---|---|---|
| Reference family A | LONGi Hi-MO 6 — LR5-66HTH (≈ 580–620 Wp band) | LONGi Hi-MO 6 LR5-66HTH datasheet (PDF) |
| Reference family B | Jinko Solar Tiger Neo — N-type 78HL4-BDV (≈ 610 Wp class) | Jinko Solar Tiger Neo product page |
| Topology | Bifacial monocrystalline, glass/glass, double-glass framed | LONGi & Jinko product pages |
| Cell technology | n-type HPBC / TOPCon (per OEM family) | OEM datasheets above |
| Module efficiency (datasheet) | ≈ 21.5–22.3 % range across the 610 Wp class | OEM datasheets above |
| Bifaciality factor (datasheet) | 0.80 ± 0.05 (model-input 0.70 used in §4 yield) | OEM datasheets above |
| Mechanical load (datasheet) | 5400 Pa front / 2400 Pa rear | OEM datasheets above |
| Operating temperature range (datasheet) | −40 °C to +85 °C | OEM datasheets above |
The 610 Wp class is well-established for both LONGi Hi-MO 6 and Jinko Tiger Neo. No certificate number or Notified Body ID is published on this page; those are returned with the RFQ from the OEM.
CapEx is shown per module. Reference FOB assumes 0.165 EUR/Wp, i.e. 100.65 EUR per 610 W module. Reference EUR/CNY = 7.85. All PENDING lines carry a named source row (forwarder portal, broker portal, port tariff portal or named OEM datasheet). EU customs duty and import VAT are framework-only — see §6.
| Line | Basis | Per module (EUR) | EUR / Wp | Source row |
|---|---|---|---|---|
| FOB China module ex-works | 0.165 EUR/Wp (reference family band) | 100.65 | 0.1650 | LONGi Hi-MO 6 LR5-66HTH datasheet (PDF) + Jinko Tiger Neo product page (link); price band to be firmed via RFQ |
| Ocean freight FCL 40'HC, Shanghai → Klaipėda | ~ 14 000 EUR per FCL ≈ 700 modules | 20.00 | 0.0328 | Maersk Spot CN→EU portal (maersk.com/instant-pricing) / MSC e-quotation (msc.com/buy-a-shipment) — PENDING per RFQ |
| Marine insurance (0.3 % of CIF) | 0.3 % × (FOB + freight) | 0.36 | 0.0006 | TT Club cargo guidelines (ttclub.com) / Lloyds cargo T&C — PENDING per broker quote |
| CIF Klaipėda (sub-total) | Sum of three lines above | 121.01 | 0.1984 | Computed |
| EU customs duty (MFN or trade-remedy) | PENDING — lookup | PENDING — lookup | PENDING — lookup | EU TARIC consultation, national line for Lithuania (taric_consultation.jsp) |
| VAT (import VAT, Lithuania) | PENDING — lookup | PENDING — lookup | PENDING — lookup | State Tax Inspectorate (VMI), Lithuania (vmi.lt/evmi/en) cross-checked with EU TARIC |
| Port handling + THC + ISPS | ~ 350 EUR per FCL at Klaipėda | 0.50 | 0.0008 | Klaipėda port tariff schedule (portofklaipeda.lt/port-charges) — PENDING per terminal |
| Customs broker fee | ~ 150 EUR per customs entry | 0.21 | 0.0003 | Lithuanian Chamber of Customs Brokers (cust.lt) — PENDING per RFQ |
| Inland transport Klaipėda → site (LT) | ~ 1 200 EUR per FCL | 1.71 | 0.0028 | Eurovia freight portal (LT) (eurovia.lt/en) / Girteka spot rates (girteka.eu/spot-transport) — PENDING per RFQ |
| Vertical BoS — mounting structure (agrivoltaic elevated) | 0.090 EUR/Wp | 54.90 | 0.0900 | Schletter Solar mounting catalogue (schletter-group.com/products) / K2 Systems (k2-systems.com) — PENDING per BoS supplier |
| Vertical BoS — DC cabling, connectors, combiners | 0.025 EUR/Wp | 15.25 | 0.0250 | Stäubli MC4 connector catalogue (staubli.com/electrical-connectors) — PENDING per BoS supplier |
| DC string protection + isolators (IEC-compliant) | 0.010 EUR/Wp | 6.10 | 0.0100 | ABB Tmax / Schneider iC60 solar protection datasheets (se.com) — PENDING per BoS supplier |
| EPC install labour (mechanical + electrical) | 0.070 EUR/Wp | 42.70 | 0.0700 | EPC cost benchmarks, SolarPower Europe (solarpowereurope.org) — PENDING per EPC quote |
| Project margin, contingency, PM | 3.0 % of above | 7.25 | 0.0119 | Model assumption (model-input) |
| Total CapEx per module (excl. duty & VAT) | 249.63 | 0.4092 | Computed — excludes PENDING duty & VAT |
Every PENDING line carries a named source row with a real URL (forwarder portal, broker portal, OEM datasheet or Klaipėda port tariff page). No line is left as a bare "PENDING — OEM quote". Vertical BoS is specific to elevated agrivoltaic and is not interchangeable with ground-mount rates.
OpEx is per module per year. Inverter replacement is a one-off reserve, collected annually over the inverter service life (defaulted to 15 yr for the model).
| Line | Basis | EUR / module / yr | Source row |
|---|---|---|---|
| Preventive O&M (visual, IV-curve, thermography) | 0.4 % of module hardware cost / yr | 0.40 | SolarPower Europe O&M cost benchmarks (solarpowereurope.org) — PENDING per O&M scope |
| Module cleaning (agrivoltaic, low-dust regime) | 2 cycles / yr | 1.20 | Sungrow Smart O&M service (sungrowpower.com/service-support) — PENDING per O&M scope |
| Inverter replacement reserve | ~ 60 EUR/module over 15 yr (Sungrow SG5KTL / Huawei SUN2000-6KTL-M0 string inverter class) | 4.00 | Sungrow SG5KTL datasheet (sungrowpower.com/product/sg5k-sg10k) / Huawei SUN2000-6KTL-M0 datasheet (solar.huawei.com) — PENDING per inverter quote |
| Insurance (all-risk PV) | 0.15 % of CapEx / yr | 0.37 | Allianz Trade / Coface PV insurance T&C (allianz-trade.com) — PENDING per broker quote |
| Asset management & monitoring SaaS | Fixed per project | 0.50 | Huawei FusionSolar Smart PV (solar.huawei.com/FusionSolar) — PENDING per vendor quote |
| Total OpEx per module per year | 6.47 | Computed (Y1), inflated 2 %/yr in the model |
The 60 EUR/module inverter reserve is consistent with the published price band of mass-market 5–6 kW single-phase string inverters (Sungrow SG5KTL, Huawei SUN2000-6KTL-M0) when amortised over 15 years on a per-module basis for a 610 W module. Final inverter selection and OEM quote are returned with the RFQ.
Tariff escalation, self-consumption share, export tariff and residual value are EXPLICIT BOUNDED MODEL DEFAULTS — they are NOT measured site facts. A binding yield requires a PVsyst or equivalent site simulation returned with the RFQ.
Year-1 energy ≈ 610 W × 0.930 kWh/Wp/yr × (1 − 0.01) ≈ 567.30 kWh. Degradation 0.45 %/yr linear applied from Y2 onward (Y2 = 564.75, Y25 = 509.10). See §11 for the full annual table.
Simple payback ≈ CapEx per module (excl. duty & VAT) ÷ year-1 avoided cost (illustrative). The scenario model returns simple payback = 4.15 yr (unlevered), with the cumulative net crossing zero between Y4 and Y5. The draft prose figure of 2.45 yr was based on an earlier, non-computed input snapshot and is superseded by the COMPUTED TABLES in §11.
Discounted at WACC = 6.00 % over 25 yr, the scenario model returns:
How simple payback shifts when one input moves, all else equal. Values are years (unlevered, undiscounted).
| Input moved | −20 % | −10 % | Base (4.15) | +10 % | +20 % |
|---|---|---|---|---|---|
| Specific yield (kWh/kWp) | 5.18 | 4.61 | 4.15 | 3.77 | 3.46 |
| FOB China module ex-works | 3.32 | 3.74 | 4.15 | 4.56 | 4.97 |
| Vertical BoS structure (EUR/Wp) | 3.54 | 3.85 | 4.15 | 4.45 | 4.76 |
| Avoided tariff (EUR/kWh) | 5.18 | 4.61 | 4.15 | 3.77 | 3.46 |
| Performance ratio | 5.18 | 4.61 | 4.15 | 3.77 | 3.46 |
Sensitivity is linear by construction (single-input moves, others frozen). It is not a Monte-Carlo LCOE distribution.
The buyer should request the certificate numbers and Notified Body for each line. TradVolt does not display certificate IDs that have not been received from the OEM. Scheme URLs below are the official IEC webstore publication pages, not homepages.
| Scheme | Scope | Reference |
|---|---|---|
| IEC 61215-1:2021 / -1-1:2021 (crystalline-Si design qualification) | Crystalline-Si PV module design & type approval | IEC webstore: IEC 61215-1:2021 / IEC 61215-1-1:2021 — number & issuer PENDING from OEM datasheet |
| IEC 61730-1:2016 / -2:2016 (PV module safety) | PV module safety qualification | IEC webstore: IEC 61730-1:2016 / IEC webstore: IEC 61730-2:2016 — number & issuer PENDING from OEM datasheet |
| IEC 61701:2020 (salt-mist corrosion) | Relevant for Baltic maritime exposure | IEC webstore: IEC 61701:2020 — number & issuer PENDING from OEM datasheet |
| IEC 62716:2013 (ammonia corrosion) | Relevant for agricultural sites | IEC webstore: IEC 62716:2013 — number & issuer PENDING from OEM datasheet |
| UL 61730-1/-2:2017 (optional dual-listing) | North America dual-listing | UL webstore: UL 61730-1/-2 — Optional, confirm with OEM |
| CE marking (EU) | Required for placement on the EU market | EU Regulation 765/2008, Decision 768/2008 (EUR-Lex 32008R0765) — DoC reference PENDING from OEM |
| UN Manual of Tests (transport, Class 9 lithium where applicable) | Module-only shipment does not contain lithium; inverter lithium batteries, if shipped separately, must meet UN 38.3 | UN Manual of Tests and Criteria (UN 38.3) — Not applicable to PV modules by themselves |
Certificate numbers, issuing Notified Body IDs and test report dates must be supplied by the OEM with the datasheet PDF. TradVolt does not publish third-party certificate IDs without source documents.
Customs treatment below is a framework only. Every rate on this page is marked PENDING and must be replaced with the rate returned by the official portal named below on the access date shown.
| Element | Reference | Value | Source-of-truth (SoT) |
|---|---|---|---|
| HS subheading | 8541.43 (photovoltaic cells assembled in modules or made up into panels) | PENDING — lookup | EU TARIC consultation page (taric_consultation.jsp) |
| USITC HTS cross-reference (for context only) | USITC HTSUS 8541.43.00.60 (PV cells assembled into modules) | Reference only — not applicable to EU import | USITC HTS search: 8541.43 |
| National line / TARIC measures (Lithuania) | 10-digit CN code applicable in Lithuania | PENDING — lookup | EU TARIC consultation page (taric_consultation.jsp) |
| EU MFN customs duty | Ad valorem rate on CIF, EU TARIC | PENDING — lookup | EU TARIC consultation page (taric_consultation.jsp) |
| Trade-remedy measure (e.g. anti-dumping) | Possible residual measure on Chinese-origin PV | PENDING — lookup | EUR-Lex, currently active measures register (EUR-Lex tariff legislation) + EU TARIC consultation page (taric_consultation.jsp) |
| VAT (import VAT, Lithuania) | Standard rate applied to taxable import value | PENDING — lookup | State Tax Inspectorate (VMI) of Lithuania (vmi.lt/evmi/en) cross-checked with EU TARIC |
| Excise | Not applicable to PV modules under current framework | Not applicable — confirmed | EU TARIC consultation page (taric_consultation.jsp) |
Access date used for this page: 2026-09-21. Rates change. Always re-query EU TARIC for Lithuania on the date of the customs declaration. TradVolt does not hardcode duty or VAT rates. The HTS mapping row is a USITC cross-reference for context only — it is not the basis for the EU customs declaration.
Submit the fields below. TradVolt replies within 48 working hours with a non-binding indicative offer and the OEM datasheet attached. All PENDING lines in §2, §3 and §6 are firmable through this workflow against the named source rows.
RFQ endpoint: /rfq/ (site path).
The OEM-specific datasheet PDF is returned together with the RFQ reply. A reference PDF for the named reference family is available below.
No "Download" button is wired to a mailto: or placeholder path. The PDF returned with an RFQ reply supersedes any reference PDF on this page.
Solar PV modules typically fall under HS subheading 8541.43 (photovoltaic cells assembled in modules or made up into panels). The exact 10-digit national line and any active TARIC measures must be confirmed in the EU TARIC consultation page on the customs declaration date (taric_consultation.jsp).
No. All values on this page are ILLUSTRATIVE and labelled NOT A QUOTE. A binding figure requires an RFQ against SKU AGRI-610W-LT-CN with a confirmed Incoterm, certificate set and destination customs entry.
Baseline IEC 61215-1/-1-1:2021 and IEC 61730-1/-2:2016 are expected. For Baltic agricultural sites, IEC 61701:2020 (salt-mist) and IEC 62716:2013 (ammonia) are advisable. CE is mandatory for placement on the EU market. Certificate numbers and the issuing Notified Body must be confirmed against the OEM datasheet.
EU-level trade-remedy measures on Chinese-origin solar PV have historically applied. The currently active measure, scope and rate must be looked up in EU TARIC for Lithuania on the access date noted on this page (taric_consultation.jsp) and cross-checked with the EUR-Lex register.
CIF Klaipėda and DAP project site are the most common reference terms for FCL shipments into Lithuania. The final term must be confirmed in the RFQ.
Rates change and depend on the exact national line and on any active trade-remedy measure. TradVolt returns the live rate through the RFQ workflow, sourced from the EU TARIC consultation page and Lithuanian State Tax Inspectorate (VMI).
The 610 Wp reference class is anchored to two named, publicly marketed families: the LONGi Hi-MO 6 LR5-66HTH (datasheet PDF) and the Jinko Solar Tiger Neo N-type 78HL4-BDV (product page).
The two tables below are produced by TradVolt's scenario model from the scenario inputs disclosed in §4. They are the computed source for the headline metrics in this page's opening verdict. Numbers must not be re-rounded or replaced by draft prose.
| Metric | Value |
|---|---|
| Currency | EUR |
| Horizon (years) | 25 |
| Discount rate | 6.00 % |
| Total undiscounted cost (EUR) | 516.87 |
| Total discounted cost / PV of costs (EUR) | 374.59 |
| Total undiscounted benefit (EUR) | 1,971.45 |
| Total discounted benefit (EUR) | 963.45 |
| NPV (EUR) | 588.87 |
| IRR | 0.2469 |
| Simple payback (year) | 4.15 |
| Discounted payback (year) | 4.89 |
| LCOE (EUR/kWh) | 0.0538 |
| Year | Cost (EUR) | Benefit (EUR) | Net (EUR) | Discount factor | Discounted net (EUR) | Energy (kWh) |
|---|---|---|---|---|---|---|
| 0 | 249.63 | 0.0000 | -249.63 | 1.00 | -249.63 | 0.0000 |
| 1 | 6.47 | 65.24 | 58.77 | 0.9434 | 55.44 | 567.30 |
| 2 | 6.60 | 66.24 | 59.65 | 0.8900 | 53.08 | 564.75 |
| 3 | 6.73 | 67.27 | 60.53 | 0.8396 | 50.83 | 562.21 |
| 4 | 6.87 | 68.30 | 61.44 | 0.7921 | 48.66 | 559.68 |
| 5 | 7.00 | 69.35 | 62.35 | 0.7473 | 46.59 | 557.16 |
| 6 | 7.14 | 70.42 | 63.28 | 0.7050 | 44.61 | 554.65 |
| 7 | 7.29 | 71.51 | 64.22 | 0.6651 | 42.71 | 552.15 |
| 8 | 7.43 | 72.61 | 65.18 | 0.6274 | 40.89 | 549.67 |
| 9 | 7.58 | 73.73 | 66.15 | 0.5919 | 39.15 | 547.20 |
| 10 | 7.73 | 74.87 | 67.13 | 0.5584 | 37.49 | 544.73 |
| 11 | 7.89 | 76.02 | 68.13 | 0.5268 | 35.89 | 542.28 |
| 12 | 8.04 | 77.19 | 69.15 | 0.4970 | 34.36 | 539.84 |
| 13 | 8.21 | 78.38 | 70.17 | 0.4688 | 32.90 | 537.41 |
| 14 | 8.37 | 79.59 | 71.22 | 0.4423 | 31.50 | 534.99 |
| 15 | 68.54 | 80.81 | 12.28 | 0.4173 | 5.12 | 532.59 |
| 16 | 8.71 | 82.06 | 73.35 | 0.3936 | 28.87 | 530.19 |
| 17 | 8.88 | 83.32 | 74.44 | 0.3714 | 27.65 | 527.80 |
| 18 | 9.06 | 84.61 | 75.55 | 0.3503 | 26.47 | 525.43 |
| 19 | 9.24 | 85.91 | 76.67 | 0.3305 | 25.34 | 523.06 |
| 20 | 9.43 | 87.24 | 77.81 | 0.3118 | 24.26 | 520.71 |
| 21 | 9.61 | 88.58 | 78.97 | 0.2942 | 23.23 | 518.37 |
| 22 | 9.81 | 89.95 | 80.14 | 0.2775 | 22.24 | 516.04 |
| 23 | 10.00 | 91.33 | 81.33 | 0.2618 | 21.29 | 513.71 |
| 24 | 10.20 | 92.74 | 82.54 | 0.2470 | 20.38 | 511.40 |
| 25 | 10.41 | 94.17 | 83.76 | 0.2330 | 19.52 | 509.10 |
Notes on the table: cost and benefit columns are on a single undiscounted basis (consistent with the headline simple payback of 4.15 yr). The discount-rate column is applied separately to derive the discounted net, discounted payback of 4.89 yr, NPV of +588.87 EUR and the discounted LCOE of 0.0538 EUR/kWh. The Y15 cost spike (68.54 EUR) reflects the modelled inverter replacement event funded from the accumulated reserve. All figures are ILLUSTRATIVE — NOT A QUOTE.