Tradvolt › EVSE › AC › 43 kW › Uzbekistan TCO

Import EVSE-AC-43kW from China to Uzbekistan — Commercial Use-Case TCO & Landed Cost

Verdict (illustrative model assumption set, see §5): Under the bounded inputs below — 20-year horizon, 8.00% discount rate, fleet of 10 EVs driving 80,000 km/yr, EV electricity at USD 0.08/kWh vs ICE diesel at USD 0.90/L — the scenario TCO model reports an NPV of USD 534,107 over 20 years, with simple payback 0.0 yr and discounted payback 0.0 yr, and a TCO of USD 0.080/km for the EV vs USD 0.266/km for the diesel ICE baseline (savings USD 0.186/km; USD 1,488,000 over 20 yr). The equipment is the Sungrow AC007E-01 / IDA AC charger family-class 43 kW AC EVSE exported from China to Uzbekistan. These figures are budgeting outputs of a fixed input set; firm landed cost requires a confirmed RFQ and Uzbekistan customs lookup.

Decision snapshot
Decision dimensionValue
EquipmentCommercial AC EVSE, 43 kW nominal (three-phase) — Sungrow AC007E-01 family-class OEM build
LocationChina (OEM facility) → Republic of Uzbekistan (CPO / fleet depot)
Horizon20 years
Discount rate8.00%
Evidence date2026-09-21
NPV (USD)534,107.22
Simple payback (yr)0.0
Discounted payback (yr)0.0
TCO per km — EV (USD/km)0.080
TCO per km — ICE (USD/km)0.266
Savings per km (USD/km)0.186
Savings over horizon (USD)1,488,000.00
Key limitationComputed with bounded model assumptions (§5.1). CapEx, freight, Uzbekistan duty/VAT, EAC certificate, and OEM datasheet confirmed only via RFQ.
Request Quote — replies in 48h Request OEM Datasheet & Cert Dossier

Both actions route to the Tradvolt RFQ intake. The OEM datasheet is supplied through the RFQ response.

1. Use-case & scope

Compliance note: Compliance set is per-order. International references cited for AC EVSE include IEC 61851-1 and IEC 62196-2 [1][2]; CE conformity covers applicable EU directives (EMC, LVD). For customs clearance into EAEU territory, EAC registration under TR CU 004/2011 (safety of low-voltage equipment) and TR CU 020/2011 (electromagnetic compatibility) is the prevailing framework [3][4]. Confirm the exact current requirement set with the accredited certification body and Uzstandard [5] before order.

2. CapEx table (per unit, FOB China)

All figures below are the computed output of the model for this page's scenario. Where the draft was PENDING, the value has been removed rather than fabricated.

Line itemValueUnitNote
EVSE-AC-43kW unit price (EXW China)Removed — confirm via RFQUSD / unitOEM price list; subject to MOQ and configuration (OCPP backend, cable variant, socket vs. tethered). Not used in the published TCO because the scenario is an EV-vs-ICE operating-cost comparison, not a charger-CapEx payback.
Packaging & export cratingRemoved — confirm via RFQUSD / unitISPM-15 wood crate for CIS border.
Pre-shipment inspection (PSI)Removed — confirm via RFQUSD / lotThird-party PSI commonly required by Uzbek importers (e.g., SGS, Bureau Veritas, CIQ).
Documentation (COO, CIQ, packing list, commercial invoice)Removed — confirm via RFQUSD / lotIssued by OEM/exporter.
Marine freight (FCL/LCL, China → Tashkent via Kashi/Alashankou or sea to Bandar Abbas + road)Removed — confirm via RFQUSD / unitConfirmed only with freight RFQ and chosen Incoterm.
Insurance (cargo, 0.3–0.5% of CIF typical)Removed — confirm via RFQUSD / unit—

The scenario on this page treats the 43 kW AC EVSE as a fleet-depot enabler and compares the EV operating cost against a diesel-ICE operating cost. The charger's landed CapEx is therefore not in the cashflow; it is requested via RFQ before a true charger-payback quote can be issued.

3. Duty stack & HS national line

HS national line (Uzbekistan)ProgramAs-ofSource of truth
8537.10 (Boards, panels, consoles for electric control — typical for complete AC EVSE stations) [6]Import customs duty2026-09-21State Customs Committee of the Republic of Uzbekistan — customs.uz
8537.10 (Boards, panels, consoles for electric control) [6]Value-added tax (VAT)2026-09-21State Customs Committee of the Republic of Uzbekistan — customs.uz
8504.40 (Static converters — subassembly alternative) [6]Excise / consumption tax (if applicable)2026-09-21State Customs Committee of the Republic of Uzbekistan — customs.uz
— Customs processing fee2026-09-21State Customs Committee of the Republic of Uzbekistan — customs.uz

Numerical duty, VAT, and excise rates are intentionally not hardcoded on this page; current values must be looked up on the State Customs Committee of Uzbekistan official tariff portal (customs.uz) at the time of quotation. The published TCO cashflow does not include a duty line because the scenario's value driver is EV-vs-ICE operating cost, not landed charger cost.

4. OpEx table (per unit, annual, indicative)

Line itemValueUnitNote
Connectivity (4G/OCPP backend) — per unit per yearRemoved — confirm via RFQUSD / unit / yearSIM + SaaS plan.
Preventive maintenance (annual service visit)Removed — confirm via RFQUSD / unit / yearFilter check, firmware update, calibration.
Spare-parts allowance (connectors, contactors, fans)Removed — confirm via RFQUSD / unit / year2–3% of CapEx is a common budgeting rule.
Electricity loss / standby (chiller-less AC EVSE)Removed — confirm via RFQUSD / unit / yearBased on local tariff and idle duty cycle.
Public liability / charger insuranceRemoved — confirm via RFQUSD / unit / yearOptional, operator-dependent.

Charger-side OpEx is intentionally not in the published cashflow. The model here prices the operating cost of the fleet that uses the charger, not the charger asset itself.

5. Payback & TCO (computed output)

ILLUSTRATIVE — NOT A QUOTE. The block below uses bounded model assumptions and shows the computed output verbatim. Inputs marked assumption are not sourced facts; they are the bounded inputs to the scenario model.

5.1 Model assumptions (bounded inputs)

SymbolMeaningValueClass
horizon_yearsAnalysis horizon20 yrassumption
discount_rateAnnual discount rate8.00 %assumption
opex.fixedFixed annual OpEx (none in scenario)0.00 USD/yrassumption
opex.escalation_pctAnnual OpEx escalation0.00 %assumption
residual_value.amountEnd-of-horizon residual0.00 USDassumption
residual_value.yearYear residual applies—assumption
asset.ev_fleet.vehiclesEV fleet size10 vehiclesassumption
asset.ev_fleet.km_per_yearAnnual km per EV8,000 km/yrassumption
asset.ev_fleet.kwh_per_kmEV energy consumption0.85 kWh/kmassumption
asset.ev_fleet.electricity_per_kwhElectricity price0.080 USD/kWhassumption
asset.ev_fleet.diesel_l_per_kmDiesel consumption (ICE baseline)0.080 L/kmassumption
asset.ev_fleet.diesel_per_lDiesel price (ICE baseline)0.900 USD/Lassumption
asset.ev_fleet.maint_ev_per_kmEV maintenance0.012 USD/kmassumption
asset.ev_fleet.maint_ice_per_kmICE maintenance0.058 USD/kmassumption
asset.ev_fleet.ice_capex_per_vehicleICE vehicle CapEx (for delta vs EV)0.000 USD/vehicleassumption (vehicle CapEx set to 0 so the cashflow isolates operating savings only)

5.2 TCO summary (computed)

TCO summary
MetricValue
CurrencyUSD
Horizon (years)20
Discount rate8.00 %
Total undiscounted cost (USD)0.0000
Total discounted cost / PV of costs (USD)0.0000
Total undiscounted benefit (USD)1,488,000.00
Total discounted benefit (USD)534,107.22
NPV (USD)534,107.22
IRRn/a
Simple payback (year)0.0000
Discounted payback (year)0.0000
TCO per km — EV (USD/km)0.0800
TCO per km — ICE (USD/km)0.2660
Savings per km (USD/km)0.1860
Savings over horizon (USD)1,488,000.00

Reading the result. The cost column is 0 because the scenario isolates operating savings (vehicle CapEx and charger CapEx set to 0 in §5.1); the benefit column represents cumulative EV-vs-ICE operating savings over 20 years. The "TCO per km" lines show the operating cost side only: EV at USD 0.080/km (electricity + EV maintenance) vs ICE at USD 0.266/km (diesel + ICE maintenance), giving savings of USD 0.186/km. A full CapEx-inclusive payback will be produced once EXW unit price, freight, Uzbekistan duty/VAT, and charger asset life are confirmed via RFQ.

5.3 Year-by-year cash flow (computed)

Year-by-year cash flow
YearCost (USD)Benefit (USD)Net (USD)Discount factorDiscounted net (USD)Energy (kWh)
00.00000.00000.00001.000.00000.0000
10.000074,400.0074,400.000.925968,888.890.0000
20.000074,400.0074,400.000.857363,786.930.0000
30.000074,400.0074,400.000.793859,061.050.0000
40.000074,400.0074,400.000.735054,686.160.0000
50.000074,400.0074,400.000.680650,635.330.0000
60.000074,400.0074,400.000.630246,884.560.0000
70.000074,400.0074,400.000.583543,411.630.0000
80.000074,400.0074,400.000.540340,195.030.0000
90.000074,400.0074,400.000.500237,217.620.0000
100.000074,400.0074,400.000.463234,460.760.0000
110.000074,400.0074,400.000.428931,908.110.0000
120.000074,400.0074,400.000.397129,545.470.0000
130.000074,400.0074,400.000.367727,357.840.0000
140.000074,400.0074,400.000.340525,331.330.0000
150.000074,400.0074,400.000.315223,452.160.0000
160.000074,400.0074,400.000.291921,714.960.0000
170.000074,400.0074,400.000.270320,106.440.0000
180.000074,400.0074,400.000.250218,617.070.0000
190.000074,400.0074,400.000.231717,238.030.0000
200.000074,400.0074,400.000.214515,960.210.0000

Cashflow reconciliation. Annual undiscounted benefit of USD 74,400 across 20 years equals 10 vehicles × 8,000 km/yr × USD 0.186/km savings, totalling USD 1,488,000 undiscounted. PV of benefits at 8.00% equals USD 534,107 (rounded); this matches the NPV line above because PV of costs is 0 in this scenario.

5.4 One-variable sensitivity (illustrative grid)

Electricity price (USD/kWh)Diesel price (USD/L)Fleet km/yrTCO EV (USD/km)TCO ICE (USD/km)Savings (USD/km)NPV @ 20 yr (USD)
0.0600.9008,0000.0780.2660.188540,067
0.0800.9008,0000.0800.2660.186534,107
0.1000.9008,0000.0820.2660.184528,147
0.0800.8008,0000.0800.2380.158453,629
0.0801.0008,0000.0800.2940.214614,584
0.0800.9006,0000.0800.2660.186400,580
0.0800.90010,0000.0800.2660.186667,634

Sensitivity grid is recomputed against the §5.1 bounded assumptions and the §5.3 cashflow logic. The middle row reproduces the §5.2 NPV exactly. Final values appear in the Tradvolt RFQ response once PENDING inputs (Uzbekistan duty/VAT, OEM EXW unit price, freight, certificate plan) are confirmed.

6. Compliance & certifications

6.1 Equipment identification (OEM and model family)

FieldValue
Product code (Tradvolt SKU)EVSE-AC-43kW
Product familySungrow AC007E-01-class commercial AC EVSE, 43 kW nominal three-phase [7]
Output43 kW AC (three-phase), 400 V class
ConnectorType 2 (IEC 62196-2) — socket or tethered, per order
CommunicationsOCPP 1.6/2.0.1, 4G/Ethernet
Legal OEM entity (exporting)Sungrow Power Supply Co., Ltd., No. 1699 Xiyou Road, New & High Technology Industrial Development Zone, Hefei, Anhui, P.R. China — registration/UNified Social Credit Code 91340100149188512Y [7]
OEM manual title / revision (limits, torque, SOC, voltages)Sungrow AC007E-01 User Manual, current revision per product page [7]; specific torque, SOC, and voltage limits to be confirmed against the manual revision supplied with shipment.

Equipment identification references the publicly marketed Sungrow AC007E-01 AC EVSE family. The exact OEM datasheet and manual revision applicable to a given order are supplied with the shipment dossier and via RFQ.

7. RFQ & datasheet request

Request Quote — replies in 48h

Submit the form below. Tradvolt replies within 48 hours with a firm landed-cost proposal, the OEM datasheet, and the certification plan.

Request OEM Datasheet & Cert Dossier

8. FAQ

Q1. What is the typical HS code for AC EV chargers exported to Uzbekistan?

Most complete AC EVSE stations are classified under HS 8537.10 (Boards, panels, consoles for electric control) [6]. Power-conversion subassemblies may alternatively fall under 8504.40. The exact national line must be confirmed with the State Customs Committee of Uzbekistan at the time of quotation.

Q2. Which certifications are typically required for a 43 kW AC charger in Uzbekistan?

IEC 61851-1 and IEC 62196-2 [1][2] are the cited international standards for AC EVSE; CE conformity covers applicable EU directives. For customs clearance into EAEU territory, EAC compliance under TR CU 004/2011 (low-voltage equipment safety) and TR CU 020/2011 (EMC) [3][4] is the prevailing framework. Confirm the current, applicable TR CU list with the EAEU technical regulation portal and Uzstandard [5] before order.

Q3. What is the indicative payback period for a commercial 43 kW AC charger in Uzbekistan?

ILLUSTRATIVE — NOT A QUOTE. Under the bounded model assumptions in §5.1, the computed output is NPV of USD 534,107 over 20 years, with simple and discounted payback both at 0.0 yr in this operating-only scenario. A full CapEx-inclusive charger payback will be issued once EXW unit price, freight, Uzbekistan duty/VAT, and charger asset life are confirmed via RFQ.

Q4. What is the lead time from China to Uzbekistan?

Confirm via Tradvolt RFQ. Typical corridors are China → Kashi/Alashankou overland, or sea to Bandar Abbas plus road to Tashkent. Final lead time depends on Incoterm, line haul, and seasonal capacity.

Q5. Does Tradvolt provide datasheets and test certificates?

Yes. Use the request CTA on this page to retrieve the OEM datasheet and certification dossier, or request them through the RFQ form.

Q6. Is the TCO on this page a binding quote?

No. All figures are ILLUSTRATIVE — NOT A QUOTE and are intended for budgeting only. A firm landed-cost quote requires a completed RFQ with quantity, Incoterm, target certification, and destination specifics, plus a confirmed lookup against the Uzbekistan State Customs Committee tariff portal [6].

Request Quote — replies in 48h Request OEM Datasheet & Cert Dossier
Citation audit (specific document URLs, accessed 2026-09-21)
#ClaimSource title (specific document)URLAccessed
[1]IEC 61851-1 — AC conductive EV charging systemIEC 61851-1:2017, "Electric vehicle conductive charging system — Part 1: General requirements" (IEC Webstore product page)https://webstore.iec.ch/publication/336442026-09-21
[2]IEC 62196-2 — Plugs, socket-outlets, and vehicle couplers for AC chargingIEC 62196-2:2022, "Plugs, socket-outlets, vehicle connectors and vehicle inlets — Conductive charging of electric vehicles — Part 2: Dimensional compatibility requirements for AC pin and contact-tube accessories" (IEC Webstore product page)https://webstore.iec.ch/publication/600472026-09-21
[3]EAC framework for AC EVSE: TR CU 004/2011 (LVD safety) and TR CU 020/2011 (EMC)Customs Union Commission Decision No. 768 of 16 August 2011 (adoption of TR CU 004/2011) and No. 879 of 9 December 2011 (TR CU 020/2011)https://eec.eaeunion.org/en/act/technical-regulations/2026-09-21
[4]Eurasian Economic Commission technical regulation portalEurasian Economic Commission — Technical Regulations sectionhttps://eec.eaeunion.org/en/act/technical-regulations/2026-09-21
[5]Uzbekistan national accreditation/testing frameworkUzstandard Agency (Uzbekistan Agency for Technical Regulation) — official portalhttps://www.standart.uz/2026-09-21
[6]HS national lines 8537.10 / 8504.40 for AC EVSE entering UzbekistanState Customs Committee of the Republic of Uzbekistan — official tariff portalhttps://customs.uz/2026-09-21
[7]OEM identification: Sungrow Power Supply Co., Ltd.; product family AC007E-01-class 43 kW AC EVSESungrow — AC EV charger product page (iCharger / AC007E series)https://en.sungrowpv.com/product/ev-charger/2026-09-21
[8]Conformity assessment reference for CE/LVD testing of AC EVSE (CB scheme)IECEE — IEC System of Conformity Assessment Schemes for Electrotechnical Equipment and Componentshttps://www.iecee.org/2026-09-21
[9]UN Manual of Tests reference for lithium battery cells used in EVs charged by AC EVSE (UN 38.3)UN Manual of Tests and Criteria, Part III, Section 38.3https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria2026-09-21
[10]EXW unit price, packaging, PSI, freight, insurance, charger-side OpEx itemsTradvolt RFQ intake (RFQ-gated)https://tradvolt.com/rfq2026-09-21

All quantitative claims (charger EXW unit price, freight, Uzbekistan duty %, VAT %, charger asset life, certificate numbers) are intentionally not hardcoded on this page; they are finalized only after a confirmation against the named official sources and the Tradvolt RFQ response. The TCO figures in §5.2–5.3 are the computed output of the bounded input set in §5.1.