Answer / verdict (first 100 words). For the workshop base scenario in this page — a Sunsynk SYNK-12K-SG04LP3 three-phase hybrid inverter (12 kW) paired with an LFP rack, exported CN → MZ, 25-year horizon, 8.00% discount rate — the scenario TCO model returns NPV = −10,557.74 USD (total undiscounted cost USD 23,210.60; PV of costs USD 16,435.91; total undiscounted benefit USD 12,780.71; PV of benefits USD 5,878.17), LCOS = 0.7112 USD/kWh, and neither simple nor discounted payback is reached within 25 years. Verdict: at the model-default inputs the system does not pay back within horizon. Equipment pricing PENDING pending OEM datasheet; Mozambique AT duty/VAT PENDING pending AT tariff lookup. Decision is illustrative, not a quote.

TCO summary
MetricValue
CurrencyUSD
Horizon (years)25
Discount rate8.00 %
Total undiscounted cost (USD)23,210.60
Total discounted cost / PV of costs (USD)16,435.91
Total undiscounted benefit (USD)12,780.71
Total discounted benefit (USD)5,878.17
NPV (USD)-10,557.74
IRRn/a
Simple payback (year)—
Discounted payback (year)—
LCOS (USD/kWh)0.7112

Request Quote — replies in 48h

Request Quote — replies in 48h   Send spec / datasheet request

Submitting this form is a request only and does not constitute a sales contract. Prices are not displayed — see TCO tables for illustrative inputs.

1. Use case definition

The workshop use case pairs a Sunsynk SYNK-12K-SG04LP3 three-phase hybrid inverter (12 kW LV hybrid, IP65, parallel up to 16 units per maker page) with an LFP battery rack and a PV balance-of-system to displace diesel generator runtime for small commercial workshops in Mozambique. Daytime PV generation supplemented by grid where present or a diesel genset as fallback; overnight the LFP rack feeds a mixed load of power tools, lighting and ventilation. Inverter-side safety is governed by IEC 62109-1:2010 and IEC 62109-2:2011 (TC 82 — Safety of power converters for use in PV power systems) and the battery cells/modules by IEC 62619:2022 ed2 (TC 21/SC 21A — Secondary lithium cells and batteries for use in industrial applications, incl. stationary/ESS); cell-level transport is governed by the UN Recommendations on the Transport of Dangerous Goods, Manual of Tests and Criteria, UN 38.3 (ST/SG/AC.10/11/Rev.7). [Claim | Src: Sunsynk SYNK-12K-SG04LP3 product page | URL: https://www.sunsynk.org/product/hybrid-inverter-12kw-3p | accessed 2026-09-21] [Claim | Src: IEC 62109-1:2010 (TC 82) | URL: https://webstore.iec.ch/en/publication/6470 | accessed 2026-09-21] [Claim | Src: IEC 62109-2:2011 (TC 82) | URL: https://webstore.iec.ch/en/publication/6471 | accessed 2026-09-21] [Claim | Src: IEC 62619:2022 ed2 (TC 21/SC 21A) | URL: https://webstore.iec.ch/en/publication/64073 | accessed 2026-09-21]

2. Equipment & procedure limits (from OEM manuals)

3. CapEx table & Equipment Scope (ILLUSTRATIVE — NOT A QUOTE)

Equipment scope (in price vs. excluded): The 12,000.00 USD Year-0 CapEx in the cash-flow model is a bundled scenario assumption covering 1 × Sunsynk SYNK-12K-SG04LP3 (12 kW three-phase LV hybrid inverter), 1 × 9.6 kWh nominal LFP battery rack (providing 7.68 kWh usable capacity at 80% DoD, derived from the Year-1 discharge of 2,534.40 kWh ÷ 330 cycles/yr), rooftop PV modules with DC/AC protection switchgear, LCL sea freight to Maputo or Beira, marine cargo insurance, and local workshop installation/commissioning. Excluded from the 12,000.00 USD price: Mozambique Autoridade Tributária (AT) import duties and 16%/17% IVA (which remain PENDING tariff lookup), port storage/demurrage at Maputo/Beira, backup diesel generator purchase or overhaul, three-phase workshop machine-tool rewiring, structural roof reinforcement, and mid-life LFP cell augmentation or inverter replacement.

LineItemScope & Traceability ClassificationUnit basis
1Hybrid inverter — Sunsynk SYNK-12K-SG04LP3Public-source hardware specs (12 kW 3P LV, IP65, 38.5 kg net, up to 16 units parallel per sunsynk.org; safety standards IEC 62109-1:2010 / IEC 62109-2:2011); unit price supplier-quoted at RFQ (rolled into 12,000 USD Year-0 CapEx assumption)per set
2LFP rack (9.6 kWh nominal / 7.68 kWh usable at 80% DoD)Stated scenario assumption for 9.6 kWh nominal pack size (implied by 2,534.40 kWh Year-1 throughput ÷ 330 cycles ÷ 0.80 DoD); cell safety standard public-source IEC 62619:2022 ed2; unit price supplier-quoted at RFQper set
3PV modules & mounting BoSStated scenario assumption (rooftop racking, DC cabling, combiner included in 12,000 USD aggregate; itemized cost supplier-quoted at RFQ)per system
4Protection, switchgear, AC distributionStated scenario assumption (breakers, SPDs, earthing included in 12,000 USD aggregate; itemized cost supplier-quoted at RFQ)per system
5Freight (CN→MZ, sea)Stated scenario assumption (LCL sea freight FOB Ningbo/Shanghai → Maputo or Beira included in 12,000 USD aggregate; firm rate supplier-quoted at RFQ)per shipment
6Marine insuranceStated scenario assumption (~0.3–0.5% of cargo value allowance included in 12,000 USD aggregate)per shipment
7Installation & commissioningStated scenario assumption (local EPC electrical installation included in 12,000 USD aggregate; excluded: civil works & genset integration)per site

Individual BOM sub-lines (1–7) are unbundled in the public model (marked DROPPED-ITEM in §5) and rolled into the 12,000.00 USD Year-0 CapEx scenario assumption. Submit the RFQ form for supplier-quoted unit prices and confirmed Mozambique AT customs duties.

4. OpEx table (annual, ILLUSTRATIVE)

LineDriverMechanismUnit basis
O1Diesel displacementkWh shifted from genset to PV/LFP; value per kWh discharged model defaultUSD/yr
O2Maintenance reserveInverter service, fan/inverter replacement reserve (annual escalator in cost table)USD/yr
O3Battery augmentationAugment beyond warranty term if throughput warrantsUSD/yr
O4Insurance / compliance renewalsAnnual policy, site inspectionUSD/yr
O5Remote monitoringData SIM / cloud platform feeUSD/yr
O6Charge cost (grid top-up / genset top-up)asset.ess.charge_cost_per_kwh model default for in-window top-up kWhUSD/yr

5. Computed TCO — Input Traceability & Arbitrage Mechanics

Every parameter driving the Section 6 cash-flow table is classified below as public-source, supplier-quoted (none until RFQ), or a stated scenario assumption. Note the underlying energy-arbitrage arithmetic: in Year 1, the 9.6 kWh nominal LFP rack delivers 9.6 kWh × 80% DoD × 330 cycles = 2,534.40 kWh of discharged energy, earning a net spread of 0.4500 − (0.1800 ÷ 0.92 round-trip efficiency) = 0.254348 USD/kWh, or 644.62 USD in Year-1 gross benefit.

ParameterValueTraceability / Source Classification
Inverter rating & weight12 kW 3P / IP65 / 38.5 kgPublic-source (Sunsynk SYNK-12K-SG04LP3 product specification, sunsynk.org)
Nominal LFP battery capacity9.60 kWh (7.68 kWh usable)Stated scenario assumption (derived from Year-1 discharge 2,534.40 kWh ÷ 330 cycles/yr = 7.68 kWh/cycle at 80% DoD)
Year-0 CapEx total (USD)12,000.00Stated scenario assumption (bundled equipment + sea freight + local install allowance; excludes Mozambique AT duty/IVA)
Year-1 OpEx (USD) & escalator350.00 (+2.00%/yr)Stated scenario assumption (fixed annual maintenance & monitoring reserve escalating 2.00%/yr; rises to 562.95 USD by Year 25)
Discount rate & horizon8.00% real / 25 yearsStated scenario assumption (Mozambique SME hard-currency hurdle rate and evaluation horizon)
residual_value.amount (USD)0.00 at Year 25Stated scenario assumption (zero terminal salvage value)
asset.ess.usable_pct (%)80.00Stated scenario assumption (depth-of-discharge window; operating safety governed by public-source IEC 62619:2022 ed2)
asset.ess.round_trip_eff (%)92.00Stated scenario assumption (AC-to-battery-to-AC round-trip efficiency; requires 1.087 kWh charge per 1.000 kWh discharged)
asset.ess.cycles_per_year330.00Stated scenario assumption (one full cycle per working day, excluding Sundays/holidays)
asset.ess.degradation_pct_per_year (%)2.00Stated scenario assumption (compound annual usable-capacity decay; reduces annual discharge from 2,534.40 kWh in Year 1 to 1,560.63 kWh in Year 25)
asset.ess.charge_cost_per_kwh (USD/kWh)0.1800Stated scenario assumption (blended grid/PV charging cost; equals 0.19565 USD per kWh discharged at 92% RTE)
asset.ess.value_per_kwh_discharged (USD/kWh)0.4500Stated scenario assumption (avoided small-genset diesel cost per kWh delivered to workshop loads)
CapEx sub-lines (items 1–7)DROPPED-ITEMSupplier-quoted at RFQ (unbundled unit prices omitted from base run to prevent drift from the 12,000.00 USD aggregate assumption)

What Would Change This Answer

Under the base scenario assumptions, this system is uneconomic (NPV = −10,557.74 USD, LCOS = 0.7112 USD/kWh, no payback) because a 7.68 kWh usable battery cycling once daily generates only 644.62 USD/yr in Year-1 arbitrage savings—barely clearing the 350.00 USD/yr OpEx and turning cash-flow negative from Year 17 onward as capacity degrades by 2%/yr while OpEx inflates by 2%/yr. Three changes would flip this result:

  1. Direct daytime PV self-consumption & higher battery throughput (kWh/yr): The base model credits only battery-cycled energy (2,534.40 kWh in Year 1) and ignores direct daytime PV-to-load kWh passed through the 12 kW Sunsynk inverter. If a 12 kWp workshop rooftop array supplies ~15,000 kWh/yr directly to daytime three-phase machinery (welding, compressors, saws) at an avoided tariff/diesel value of 0.25–0.45 USD/kWh, or if the LFP rack is scaled to 25–30 kWh usable capacity, annual gross benefit rises from ~645 USD/yr to 3,500–5,000+ USD/yr, achieving simple payback in 3.0 to 4.5 years.
  2. Charging source cost (0.18 USD/kWh grid top-up vs. 0.00 USD/kWh surplus rooftop PV): Charging from the grid at 0.18 USD/kWh (0.1957 USD/kWh discharged after 92% RTE losses) consumes 43.5% of the 0.45 USD/kWh diesel displacement value. Charging exclusively from otherwise-curtailed rooftop solar (0.00 USD/kWh marginal charge cost) widens the net benefit per kWh discharged by +77% (from 0.2543 USD/kWh to 0.4500 USD/kWh), raising Year-1 gross benefit to 1,140.48 USD/yr; combined with a higher diesel genset offset (0.60–0.75 USD/kWh for small workshop gensets running at partial load), battery-only payback drops into a 9–12 year window.
  3. Workshop O&M structure and Mozambique AT import duty/IVA exemptions: A fixed 350 USD/yr OpEx escalating at 2%/yr consumes 11,210.60 USD undiscounted over 25 years (nearly matching the 12,000 USD Year-0 CapEx). Eliminating paid remote-monitoring subscriptions and handling routine inspection in-house cuts lifetime OpEx by >70%, while securing renewable-energy import duty relief under the Mozambique AT tariff schedule prevents a 20–25% landed-CapEx surcharge at Maputo or Beira.

6. Year-by-year cash flow (COMPUTED, computed)

Year-by-year cash flow
YearCost (USD)Benefit (USD)Net (USD)Discount factorDiscounted net (USD)Energy (kWh)
012,000.000.0000-12,000.001.00-12,000.000.0000
1350.00644.62294.620.9259272.802,534.40
2357.00631.73274.730.8573235.532,483.71
3364.14619.09254.950.7938202.392,434.04
4371.42606.71235.290.7350172.942,385.36
5378.85594.58215.720.6806146.822,337.65
6386.43582.68196.260.6302123.672,290.90
7394.16571.03176.870.5835103.202,245.08
8402.04559.61157.570.540385.132,200.18
9410.08548.42138.340.500269.202,156.17
10418.28537.45119.170.463255.202,113.05
11426.65526.70100.050.428942.912,070.79
12435.18516.1780.990.397132.162,029.37
13443.88505.8461.960.367722.781,988.79
14452.76495.7342.960.340514.631,949.01
15461.82485.8123.990.31527.561,910.03
16471.05476.105.040.29191.471,871.83
17480.47466.57-13.900.2703-3.761,834.39
18490.08457.24-32.840.2502-8.221,797.71
19499.89448.10-51.790.2317-12.001,761.75
20509.88439.14-70.750.2145-15.181,726.52
21520.08430.35-89.730.1987-17.831,691.99
22530.48421.75-108.740.1839-20.001,658.15
23541.09413.31-127.780.1703-21.761,624.98
24551.91405.04-146.870.1577-23.161,592.48
25562.95396.94-166.010.1460-24.241,560.63

7. Compliance & certifications

Certificate numbers and issuing bodies must be requested from the OEM and verified directly with the issuing body before shipment; this page does not display certificate numbers, logos or claims of ranking.

8. Duty & HS block

HS national lineProgramAs-ofSoT
PENDING — lookup (Mozambique AT national line for 8504.xx, static converters / inverters subheading; confirm exact 8–10 digit code on the AT portal)Mozambique customs duty + VAT (IVA)2026-09-21PENDING
PENDING — lookup (LFP cells/modules under 8507.60 lithium-ion or 8504.40 static converters as applicable per AT national line)Mozambique customs duty + VAT (IVA)2026-09-21PENDING

All duty and VAT rates are PENDING — lookup on the official Mozambique Autoridade Tributária (AT) customs/tariff pages and the WCO HS Nomenclature 2022 edition before any quotation: AT pauta tarifária · WCO HS 2022. This page intentionally does not hardcode a rate; Mozambique AT is the single source of truth.

9. RFQ

Request Quote — replies in 48h

Request Quote — replies in 48h   Send spec / datasheet request

No prices are returned via this page; an indicative offer follows the RFQ within 48 hours.

10. FAQ

What is the assumed HS code for a 12 kW hybrid inverter imported into Mozambique?
The HS national line is PENDING — lookup on the Mozambique Autoridade Tributária (AT) customs/tariff pages and the WCO HS 2022 edition (heading 8504 static converters / inverters) before quoting; the exact 8–10 digit national line must be confirmed with AT.
Are the prices, duties and payback figures on this page a quote?
No. All CapEx, OpEx, duty and TCO figures are ILLUSTRATIVE and NOT A QUOTE. Equipment pricing PENDING pending OEM datasheet; duty/VAT PENDING pending AT lookup. Submit the RFQ form for an indicative offer.
Which compliance marks should I request before shipment?
Request CE marking and IEC 62109-1:2010 + IEC 62109-2:2011 (TC 82) on the inverter, and IEC 62619:2022 ed2 (TC 21/SC 21A) on the LFP battery from the OEM. Confirm certificate numbers and issuer directly with the manufacturer.
Can Tradvolt ship DDP Beira or Maputo?
Yes — list the preferred Incoterm (e.g., FOB, CIF, DAP, DDP) and destination city in the RFQ; an indicative quotation is returned within 48 hours.
What warranty documentation should accompany a hybrid inverter and LFP rack?
OEM warranty card listing inverter model + serial range + term; LFP battery warranty card; plus a Certificate of Origin from China.
What does the computed 25-year TCO show for the base scenario?
NPV = −10,557.74 USD at 8.00% discount, LCOS = 0.7112 USD/kWh, and neither simple nor discounted payback is reached within 25 years at the bounded defaults. Pricing PENDING pending OEM datasheet; duty/VAT PENDING pending AT lookup.

  1. [Claim | Src: Sunsynk SYNK-12K-SG04LP3 product page (12 kW three-phase LV hybrid, IP65, parallel up to 16 units) | URL: https://www.sunsynk.org/product/hybrid-inverter-12kw-3p | accessed 2026-09-21]
  2. [Claim | Src: IEC 62109-1:2010 (TC 82) — Safety of power converters for use in PV power systems, Part 1: General requirements | URL: https://webstore.iec.ch/en/publication/6470 | accessed 2026-09-21]
  3. [Claim | Src: IEC 62109-2:2011 (TC 82) — Safety of power converters for use in PV power systems, Part 2: Particular requirements for inverters | URL: https://webstore.iec.ch/en/publication/6471 | accessed 2026-09-21]
  4. [Claim | Src: IEC 62619:2022 ed2 (TC 21/SC 21A) — Secondary cells and batteries containing alkaline or other non-acid electrolytes — Safety requirements for secondary lithium cells and batteries for use in industrial applications incl. stationary/ESS | URL: https://webstore.iec.ch/en/publication/64073 | accessed 2026-09-21]
  5. [Claim | Src: UN Recommendations on the Transport of Dangerous Goods, Manual of Tests and Criteria, 7th revised edition (UN 38.3 lithium battery provisions; ST/SG/AC.10/11/Rev.7) | URL: https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria | accessed 2026-09-21]
  6. [Claim | Src: Mozambique Autoridade Tributária (AT) — pauta tarifária (national customs/tariff publication) | URL: https://www.at.gov.mz/legislacao/aduanas/pautas-tarifarias/ | accessed 2026-09-21]
  7. [Claim | Src: WCO Harmonized Commodity Description and Coding System, 2022 edition — heading 8504 (electrical static converters / inverters) | URL: https://www.wcoomd.org/en/topics/nomenclature/instrument-and-tools/hs-nomenclature-2022-edition | accessed 2026-09-21]
  8. [Claim | Src: South African Revenue Service — customs and excise tariff (regional mirror for HS reference) | URL: https://www.sars.gov.za/ | accessed 2026-09-21]
  9. [Claim | Src: ICC Incoterms® 2020 (official rules) | URL: https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/ | accessed 2026-09-21]
  10. [Bounded model assumption | Year-0 CapEx = 12,000.00 USD; Year-1 OpEx = 350.00 USD (escalates 2%/yr in cost column); residual_value.amount = 0.00 USD at residual_value.year = 25; asset.ess.usable_pct = 80 %; asset.ess.round_trip_eff = 92 %; asset.ess.cycles_per_year = 330; asset.ess.degradation_pct_per_year = 2 %; asset.ess.charge_cost_per_kwh = 0.1800 USD/kWh; asset.ess.value_per_kwh_discharged = 0.4500 USD/kWh. CapEx sub-line amounts for freight, marine insurance, PV/modules/mounting BoS, protection/switchgear, installation & commissioning, LFP rack line item and inverter line item are DROPPED-ITEM and recovered inside the scenario model. These are bounded model defaults, not sourced facts.]

© Tradvolt. This page is an export-channel information sheet, not an offer to sell. Prices, duties and specifications are illustrative pending OEM datasheet, AT lookup and an executed RFQ.