Use case · Workshop · Hybrid 12 kW · CN → Mozambique
Tradvolt export channel · Vertical: LFP battery & solar BoS · Audience: Mozambique B2B buyers (workshops, SMEs, EPCs) · Equipment: Sunsynk SYNK-12K-SG04LP3 three-phase hybrid inverter (12 kW) with LFP battery rack · Horizon 25 yr · Evidence date 2026-09-21
Answer / verdict (first 100 words). For the workshop base scenario in this page — a Sunsynk SYNK-12K-SG04LP3 three-phase hybrid inverter (12 kW) paired with an LFP rack, exported CN → MZ, 25-year horizon, 8.00% discount rate — the scenario TCO model returns NPV = −10,557.74 USD (total undiscounted cost USD 23,210.60; PV of costs USD 16,435.91; total undiscounted benefit USD 12,780.71; PV of benefits USD 5,878.17), LCOS = 0.7112 USD/kWh, and neither simple nor discounted payback is reached within 25 years. Verdict: at the model-default inputs the system does not pay back within horizon. Equipment pricing PENDING pending OEM datasheet; Mozambique AT duty/VAT PENDING pending AT tariff lookup. Decision is illustrative, not a quote.
| Metric | Value |
|---|---|
| Currency | USD |
| Horizon (years) | 25 |
| Discount rate | 8.00 % |
| Total undiscounted cost (USD) | 23,210.60 |
| Total discounted cost / PV of costs (USD) | 16,435.91 |
| Total undiscounted benefit (USD) | 12,780.71 |
| Total discounted benefit (USD) | 5,878.17 |
| NPV (USD) | -10,557.74 |
| IRR | n/a |
| Simple payback (year) | — |
| Discounted payback (year) | — |
| LCOS (USD/kWh) | 0.7112 |
The workshop use case pairs a Sunsynk SYNK-12K-SG04LP3 three-phase hybrid inverter (12 kW LV hybrid, IP65, parallel up to 16 units per maker page) with an LFP battery rack and a PV balance-of-system to displace diesel generator runtime for small commercial workshops in Mozambique. Daytime PV generation supplemented by grid where present or a diesel genset as fallback; overnight the LFP rack feeds a mixed load of power tools, lighting and ventilation. Inverter-side safety is governed by IEC 62109-1:2010 and IEC 62109-2:2011 (TC 82 — Safety of power converters for use in PV power systems) and the battery cells/modules by IEC 62619:2022 ed2 (TC 21/SC 21A — Secondary lithium cells and batteries for use in industrial applications, incl. stationary/ESS); cell-level transport is governed by the UN Recommendations on the Transport of Dangerous Goods, Manual of Tests and Criteria, UN 38.3 (ST/SG/AC.10/11/Rev.7). [Claim | Src: Sunsynk SYNK-12K-SG04LP3 product page | URL: https://www.sunsynk.org/product/hybrid-inverter-12kw-3p | accessed 2026-09-21] [Claim | Src: IEC 62109-1:2010 (TC 82) | URL: https://webstore.iec.ch/en/publication/6470 | accessed 2026-09-21] [Claim | Src: IEC 62109-2:2011 (TC 82) | URL: https://webstore.iec.ch/en/publication/6471 | accessed 2026-09-21] [Claim | Src: IEC 62619:2022 ed2 (TC 21/SC 21A) | URL: https://webstore.iec.ch/en/publication/64073 | accessed 2026-09-21]
Equipment scope (in price vs. excluded): The 12,000.00 USD Year-0 CapEx in the cash-flow model is a bundled scenario assumption covering 1 × Sunsynk SYNK-12K-SG04LP3 (12 kW three-phase LV hybrid inverter), 1 × 9.6 kWh nominal LFP battery rack (providing 7.68 kWh usable capacity at 80% DoD, derived from the Year-1 discharge of 2,534.40 kWh ÷ 330 cycles/yr), rooftop PV modules with DC/AC protection switchgear, LCL sea freight to Maputo or Beira, marine cargo insurance, and local workshop installation/commissioning. Excluded from the 12,000.00 USD price: Mozambique Autoridade Tributária (AT) import duties and 16%/17% IVA (which remain PENDING tariff lookup), port storage/demurrage at Maputo/Beira, backup diesel generator purchase or overhaul, three-phase workshop machine-tool rewiring, structural roof reinforcement, and mid-life LFP cell augmentation or inverter replacement.
| Line | Item | Scope & Traceability Classification | Unit basis |
|---|---|---|---|
| 1 | Hybrid inverter — Sunsynk SYNK-12K-SG04LP3 | Public-source hardware specs (12 kW 3P LV, IP65, 38.5 kg net, up to 16 units parallel per sunsynk.org; safety standards IEC 62109-1:2010 / IEC 62109-2:2011); unit price supplier-quoted at RFQ (rolled into 12,000 USD Year-0 CapEx assumption) | per set |
| 2 | LFP rack (9.6 kWh nominal / 7.68 kWh usable at 80% DoD) | Stated scenario assumption for 9.6 kWh nominal pack size (implied by 2,534.40 kWh Year-1 throughput ÷ 330 cycles ÷ 0.80 DoD); cell safety standard public-source IEC 62619:2022 ed2; unit price supplier-quoted at RFQ | per set |
| 3 | PV modules & mounting BoS | Stated scenario assumption (rooftop racking, DC cabling, combiner included in 12,000 USD aggregate; itemized cost supplier-quoted at RFQ) | per system |
| 4 | Protection, switchgear, AC distribution | Stated scenario assumption (breakers, SPDs, earthing included in 12,000 USD aggregate; itemized cost supplier-quoted at RFQ) | per system |
| 5 | Freight (CN→MZ, sea) | Stated scenario assumption (LCL sea freight FOB Ningbo/Shanghai → Maputo or Beira included in 12,000 USD aggregate; firm rate supplier-quoted at RFQ) | per shipment |
| 6 | Marine insurance | Stated scenario assumption (~0.3–0.5% of cargo value allowance included in 12,000 USD aggregate) | per shipment |
| 7 | Installation & commissioning | Stated scenario assumption (local EPC electrical installation included in 12,000 USD aggregate; excluded: civil works & genset integration) | per site |
Individual BOM sub-lines (1–7) are unbundled in the public model (marked DROPPED-ITEM in §5) and rolled into the 12,000.00 USD Year-0 CapEx scenario assumption. Submit the RFQ form for supplier-quoted unit prices and confirmed Mozambique AT customs duties.
| Line | Driver | Mechanism | Unit basis |
|---|---|---|---|
| O1 | Diesel displacement | kWh shifted from genset to PV/LFP; value per kWh discharged model default | USD/yr |
| O2 | Maintenance reserve | Inverter service, fan/inverter replacement reserve (annual escalator in cost table) | USD/yr |
| O3 | Battery augmentation | Augment beyond warranty term if throughput warrants | USD/yr |
| O4 | Insurance / compliance renewals | Annual policy, site inspection | USD/yr |
| O5 | Remote monitoring | Data SIM / cloud platform fee | USD/yr |
| O6 | Charge cost (grid top-up / genset top-up) | asset.ess.charge_cost_per_kwh model default for in-window top-up kWh | USD/yr |
Every parameter driving the Section 6 cash-flow table is classified below as public-source, supplier-quoted (none until RFQ), or a stated scenario assumption. Note the underlying energy-arbitrage arithmetic: in Year 1, the 9.6 kWh nominal LFP rack delivers 9.6 kWh × 80% DoD × 330 cycles = 2,534.40 kWh of discharged energy, earning a net spread of 0.4500 − (0.1800 ÷ 0.92 round-trip efficiency) = 0.254348 USD/kWh, or 644.62 USD in Year-1 gross benefit.
| Parameter | Value | Traceability / Source Classification |
|---|---|---|
| Inverter rating & weight | 12 kW 3P / IP65 / 38.5 kg | Public-source (Sunsynk SYNK-12K-SG04LP3 product specification, sunsynk.org) |
| Nominal LFP battery capacity | 9.60 kWh (7.68 kWh usable) | Stated scenario assumption (derived from Year-1 discharge 2,534.40 kWh ÷ 330 cycles/yr = 7.68 kWh/cycle at 80% DoD) |
| Year-0 CapEx total (USD) | 12,000.00 | Stated scenario assumption (bundled equipment + sea freight + local install allowance; excludes Mozambique AT duty/IVA) |
| Year-1 OpEx (USD) & escalator | 350.00 (+2.00%/yr) | Stated scenario assumption (fixed annual maintenance & monitoring reserve escalating 2.00%/yr; rises to 562.95 USD by Year 25) |
| Discount rate & horizon | 8.00% real / 25 years | Stated scenario assumption (Mozambique SME hard-currency hurdle rate and evaluation horizon) |
| residual_value.amount (USD) | 0.00 at Year 25 | Stated scenario assumption (zero terminal salvage value) |
| asset.ess.usable_pct (%) | 80.00 | Stated scenario assumption (depth-of-discharge window; operating safety governed by public-source IEC 62619:2022 ed2) |
| asset.ess.round_trip_eff (%) | 92.00 | Stated scenario assumption (AC-to-battery-to-AC round-trip efficiency; requires 1.087 kWh charge per 1.000 kWh discharged) |
| asset.ess.cycles_per_year | 330.00 | Stated scenario assumption (one full cycle per working day, excluding Sundays/holidays) |
| asset.ess.degradation_pct_per_year (%) | 2.00 | Stated scenario assumption (compound annual usable-capacity decay; reduces annual discharge from 2,534.40 kWh in Year 1 to 1,560.63 kWh in Year 25) |
| asset.ess.charge_cost_per_kwh (USD/kWh) | 0.1800 | Stated scenario assumption (blended grid/PV charging cost; equals 0.19565 USD per kWh discharged at 92% RTE) |
| asset.ess.value_per_kwh_discharged (USD/kWh) | 0.4500 | Stated scenario assumption (avoided small-genset diesel cost per kWh delivered to workshop loads) |
| CapEx sub-lines (items 1–7) | DROPPED-ITEM | Supplier-quoted at RFQ (unbundled unit prices omitted from base run to prevent drift from the 12,000.00 USD aggregate assumption) |
Under the base scenario assumptions, this system is uneconomic (NPV = −10,557.74 USD, LCOS = 0.7112 USD/kWh, no payback) because a 7.68 kWh usable battery cycling once daily generates only 644.62 USD/yr in Year-1 arbitrage savings—barely clearing the 350.00 USD/yr OpEx and turning cash-flow negative from Year 17 onward as capacity degrades by 2%/yr while OpEx inflates by 2%/yr. Three changes would flip this result:
| Year | Cost (USD) | Benefit (USD) | Net (USD) | Discount factor | Discounted net (USD) | Energy (kWh) |
|---|---|---|---|---|---|---|
| 0 | 12,000.00 | 0.0000 | -12,000.00 | 1.00 | -12,000.00 | 0.0000 |
| 1 | 350.00 | 644.62 | 294.62 | 0.9259 | 272.80 | 2,534.40 |
| 2 | 357.00 | 631.73 | 274.73 | 0.8573 | 235.53 | 2,483.71 |
| 3 | 364.14 | 619.09 | 254.95 | 0.7938 | 202.39 | 2,434.04 |
| 4 | 371.42 | 606.71 | 235.29 | 0.7350 | 172.94 | 2,385.36 |
| 5 | 378.85 | 594.58 | 215.72 | 0.6806 | 146.82 | 2,337.65 |
| 6 | 386.43 | 582.68 | 196.26 | 0.6302 | 123.67 | 2,290.90 |
| 7 | 394.16 | 571.03 | 176.87 | 0.5835 | 103.20 | 2,245.08 |
| 8 | 402.04 | 559.61 | 157.57 | 0.5403 | 85.13 | 2,200.18 |
| 9 | 410.08 | 548.42 | 138.34 | 0.5002 | 69.20 | 2,156.17 |
| 10 | 418.28 | 537.45 | 119.17 | 0.4632 | 55.20 | 2,113.05 |
| 11 | 426.65 | 526.70 | 100.05 | 0.4289 | 42.91 | 2,070.79 |
| 12 | 435.18 | 516.17 | 80.99 | 0.3971 | 32.16 | 2,029.37 |
| 13 | 443.88 | 505.84 | 61.96 | 0.3677 | 22.78 | 1,988.79 |
| 14 | 452.76 | 495.73 | 42.96 | 0.3405 | 14.63 | 1,949.01 |
| 15 | 461.82 | 485.81 | 23.99 | 0.3152 | 7.56 | 1,910.03 |
| 16 | 471.05 | 476.10 | 5.04 | 0.2919 | 1.47 | 1,871.83 |
| 17 | 480.47 | 466.57 | -13.90 | 0.2703 | -3.76 | 1,834.39 |
| 18 | 490.08 | 457.24 | -32.84 | 0.2502 | -8.22 | 1,797.71 |
| 19 | 499.89 | 448.10 | -51.79 | 0.2317 | -12.00 | 1,761.75 |
| 20 | 509.88 | 439.14 | -70.75 | 0.2145 | -15.18 | 1,726.52 |
| 21 | 520.08 | 430.35 | -89.73 | 0.1987 | -17.83 | 1,691.99 |
| 22 | 530.48 | 421.75 | -108.74 | 0.1839 | -20.00 | 1,658.15 |
| 23 | 541.09 | 413.31 | -127.78 | 0.1703 | -21.76 | 1,624.98 |
| 24 | 551.91 | 405.04 | -146.87 | 0.1577 | -23.16 | 1,592.48 |
| 25 | 562.95 | 396.94 | -166.01 | 0.1460 | -24.24 | 1,560.63 |
Certificate numbers and issuing bodies must be requested from the OEM and verified directly with the issuing body before shipment; this page does not display certificate numbers, logos or claims of ranking.
| HS national line | Program | As-of | SoT |
|---|---|---|---|
| PENDING — lookup (Mozambique AT national line for 8504.xx, static converters / inverters subheading; confirm exact 8–10 digit code on the AT portal) | Mozambique customs duty + VAT (IVA) | 2026-09-21 | PENDING |
| PENDING — lookup (LFP cells/modules under 8507.60 lithium-ion or 8504.40 static converters as applicable per AT national line) | Mozambique customs duty + VAT (IVA) | 2026-09-21 | PENDING |
All duty and VAT rates are PENDING — lookup on the official Mozambique Autoridade Tributária (AT) customs/tariff pages and the WCO HS Nomenclature 2022 edition before any quotation: AT pauta tarifária · WCO HS 2022. This page intentionally does not hardcode a rate; Mozambique AT is the single source of truth.
© Tradvolt. This page is an export-channel information sheet, not an offer to sell. Prices, duties and specifications are illustrative pending OEM datasheet, AT lookup and an executed RFQ.