TradVolt · Green-tech export · Vertical LFP · Use-case dossier · Evidence date: 2026-09-21
| Decision parameter | Value |
|---|---|
| Decision | Cannot quote a payback or NPV at this stage |
| Reason | Landed CapEx line PENDING — lookup; not bound to a number |
| Equipment family | CATL EnerC (commercial LFP rack, ≈50 kWh class) |
| Location | Indonesia (hotel retrofit, e.g., Bali / Jakarta) |
| Horizon | 20 years |
| Discount rate | 8.00 % |
| PV of benefits (USD) | 5,871.74 |
| PV of costs (USD) | 0.0000 (CapEx not bound) |
| NPV (USD) | 5,871.74 (= benefits PV − costs PV; meaningless without CapEx) |
| Simple payback (years) | 0.0000 (no denominator) |
| Discounted payback (years) | 0.0000 (no denominator) |
| IRR | n/a |
| LCOS (USD/kWh) | 0.0000 |
| Evidence date | 2026-09-21 |
| Limitation | CapEx, duty, freight marked PENDING — lookup; verdict is illustrative only |
Request Quote — replies in 48h
| Parameter | Value | Notes / source |
|---|---|---|
| Site | Hotel, Indonesia | Hospitality retrofit, tropical coastal climate |
| PV array (DC) | PENDING — lookup | Sized to cover evening load; confirm via site survey |
| BESS (nameplate) | ~50 kWh, single LFP rack | 1C-capable for hotel evening peak shaving (model assumption, bounded by CATL EnerC product class) |
| OEM legal entity | Contemporary Amperex Technology Co., Limited (CATL) | Headquartered in Ningde, Fujian, China; corporate/legal identity confirmed on the CATL energy-storage landing page |
| Product family / model | EnerC commercial LFP rack battery (≈50 kWh class) | Product family disclosed on the CATL commercial ESS page; exact SKU confirmed in RFQ |
| PCS (AC) | Typically 25–50 kVA hybrid inverter (model assumption) | Bounded range based on BESS AC class for 50 kWh-class commercial systems; not a sourced figure |
| Backup duration | ~4–6 h | Evening peak + overnight critical load |
| Operating ambient | 25–32 °C (model assumption) | Tropical coastal climate; verify derating against OEM manual |
| Claim | Source: Name | URL | Accessed |
|---|---|---|---|
| ~50 kWh-class commercial LFP rack product family exists under CATL EnerC. | CATL — Energy Storage landing page (commercial product range) | https://www.catl.com/en/ess/ | 2026-09-21 |
| 1C charge/discharge capability is typical for commercial LFP rack products. | CATL — Energy Storage product overview | https://www.catl.com/en/ess/ | 2026-09-21 |
| LFP round-trip efficiency typically 90–95% at system level. | CATL — Energy Storage product overview | https://www.catl.com/en/ess/ | 2026-09-21 |
| LFP capacity degradation typically 2–3% per year under standard cycling. | CATL — Energy Storage technology & warranty page | https://www.catl.com/en/ess/ | 2026-09-21 |
| Insurance rate 0.3–0.5% of CIF value (marine cargo policy). | Model assumption (industry-typical range) | — | 2026-09-21 |
| Hotel duty cycle: 1 cycle/day × 350 days/year = ~350 cycles/yr. | Model assumption (bounded) | — | 2026-09-21 |
| Operating ambient 25–32 °C for Indonesian tropical sites. | Model assumption (bounded) | — | 2026-09-21 |
| PCS typically 25–50 kVA hybrid inverter for 50 kWh BESS class. | Model assumption (bounded range) | — | 2026-09-21 |
The CapEx table sums the FOB equipment price, ocean freight to an Indonesian port of discharge, insurance, customs duties, VAT and inland logistics to the hotel site. CapEx lines remain PENDING — lookup pending verification against the official Indonesia DGCE tariff portal and an OEM freight quote. Until C1–C8 are bound to numeric values, PV of costs is set to 0.0000 in this run.
| Line | Component | Indicative value | Source / note |
|---|---|---|---|
| C1 | ~50 kWh LFP rack (CATL EnerC class), EXW China | PENDING — lookup | OEM datasheet; unit price subject to SKU, qty, Incoterm |
| C2 | Ocean freight (CN → ID, FCL/LCL) | PENDING — lookup | Freight quote, port-pair specific |
| C3 | Insurance (0.3–0.5% of CIF, model assumption) | PENDING — lookup | Marine cargo policy |
| C4 | Import duty (Bea Masuk) | PENDING — lookup | DGCE HS-line lookup — see §6 |
| C5 | VAT (PPN) | PENDING — lookup | DGCE HS-line lookup — see §6 |
| C6 | Inland logistics (port → site) | PENDING — lookup | Trucking + port handling (THC) |
| C7 | Installation & commissioning | PENDING — lookup | Local EPC scope |
| C8 | Permits & AHJ fees | PENDING — lookup | Local PLN/SLO coordination where required |
| Total CapEx (landed, commissioned) | PENDING — lookup | Sum C1–C8; to be confirmed in 48-h RFQ reply | |
| Claim | Source: Name | URL | Accessed |
|---|---|---|---|
| OEM legal entity and product family reference for the 50 kWh LFP rack. | CATL — Energy Storage (commercial ESS) landing page | https://www.catl.com/en/ess/ | 2026-09-21 |
| Indonesia import duty is administered by the Directorate General of Customs and Excise (DGCE / DJBC). | Indonesia DGCE — Direktorat Jenderal Bea dan Cukai | https://www.beacukai.go.id | 2026-09-21 |
| Indonesia customs tariffs are published online and require HS-code lookup at the time of shipment. | Indonesia DGCE — CEISA Tariff Portal | https://tarif.beacukai.go.id | 2026-09-21 |
| LFP module / pack classification under HS heading 8507. | World Customs Organization — Harmonized Commodity Description and Coding System, 2022 edition | https://www.wcoomd.org/en/topics/nomenclature/instrument-and-tools/hs-nomenclature-2022-edition | 2026-09-21 |
| US-side reference for lithium-ion cell / battery classification (8507.60). | USITC — Harmonized Tariff Schedule of the United States, heading 8507 | https://hts.usitc.gov/?query=8507.60 | 2026-09-21 |
| Line | Component | Indicative annual value | Note |
|---|---|---|---|
| O1 | Routine preventive maintenance | PENDING — lookup | Typically 0.5–1.0% of CapEx / yr (model assumption) |
| O2 | Spare parts (fans, contactors, BMS modules) | PENDING — lookup | Reserve budget |
| O3 | Remote monitoring / SCADA subscription | PENDING — lookup | Optional OEM service |
| O4 | Insurance (operational) | PENDING — lookup | Property / business interruption |
| O5 | Auxiliary load (cooling fans, BMS) | PENDING — lookup | kWh/yr × local tariff |
| Total annual OpEx | PENDING — lookup | Sum O1–O5; confirm via RFQ | |
| Input | Value | Type |
|---|---|---|
| horizon_years | 20 | Model default (explicit bounded) |
| discount_rate | 8.00 % | Model default (explicit bounded) |
| opex.fixed (annual) | PENDING — lookup | Not yet bound; set to 0 in this run |
| opex.escalation_pct | 0.0 % / yr | Model default (explicit bounded) |
| residual_value.amount | 0 | Model default (explicit bounded) |
| residual_value.year | 20 | Model default (explicit bounded) |
| asset.ess.usable_pct | 90 % DoD (model default) | Model default (explicit bounded) |
| asset.ess.round_trip_eff | 92.5 % (mid of 90–95% band) | Model default (explicit bounded) |
| asset.ess.degradation_pct_per_year | 2.0 % / yr (low end of 2–3% band) | Model default (explicit bounded) |
| asset.ess.charge_cost_per_kwh | PENDING — lookup | Model default (explicit bounded); the cost of charging per kWh is not yet supplied — benefits reflect displaced tariff revenue only |
| asset.ess.value_per_kwh_discharged | USD 0.13 / kWh (model default for displaced peak tariff) | Model default (explicit bounded) |
| Daily discharged energy (year 1) | 50 kWh × 1 cycle/day × 350 days = 17,500 kWh/yr (model default) | Model default (explicit bounded) |
| Landed CapEx (BESS share) | PENDING — lookup | Not yet bound; set to 0 in this run |
| Metric | Value |
|---|---|
| Currency | USD |
| Horizon (years) | 20 |
| Discount rate | 8.00 % |
| Total undiscounted cost (USD) | 0.0000 |
| Total discounted cost / PV of costs (USD) | 0.0000 |
| Total undiscounted benefit (USD) | 11,390.04 |
| Total discounted benefit (USD) | 5,871.74 |
| NPV (USD) | 5,871.74 |
| IRR | n/a |
| Simple payback (year) | 0.0000 |
| Discounted payback (year) | 0.0000 |
| LCOS (USD/kWh) | 0.0000 |
| Year | Cost (USD) | Benefit (USD) | Net (USD) | Discount factor | Discounted net (USD) | Energy (kWh) |
|---|---|---|---|---|---|---|
| 0 | 0.0000 | 0.0000 | 0.0000 | 1.00 | 0.0000 | 0.0000 |
| 1 | 0.0000 | 685.34 | 685.34 | 0.9259 | 634.57 | 15,750.00 |
| 2 | 0.0000 | 671.63 | 671.63 | 0.8573 | 575.82 | 15,435.00 |
| 3 | 0.0000 | 658.20 | 658.20 | 0.7938 | 522.50 | 15,126.30 |
| 4 | 0.0000 | 645.03 | 645.03 | 0.7350 | 474.12 | 14,823.77 |
| 5 | 0.0000 | 632.13 | 632.13 | 0.6806 | 430.22 | 14,527.30 |
| 6 | 0.0000 | 619.49 | 619.49 | 0.6302 | 390.38 | 14,236.75 |
| 7 | 0.0000 | 607.10 | 607.10 | 0.5835 | 354.24 | 13,952.02 |
| 8 | 0.0000 | 594.96 | 594.96 | 0.5403 | 321.44 | 13,672.98 |
| 9 | 0.0000 | 583.06 | 583.06 | 0.5002 | 291.68 | 13,399.52 |
| 10 | 0.0000 | 571.40 | 571.40 | 0.4632 | 264.67 | 13,131.53 |
| 11 | 0.0000 | 559.97 | 559.97 | 0.4289 | 240.16 | 12,868.90 |
| 12 | 0.0000 | 548.77 | 548.77 | 0.3971 | 217.92 | 12,611.52 |
| 13 | 0.0000 | 537.80 | 537.80 | 0.3677 | 197.75 | 12,359.29 |
| 14 | 0.0000 | 527.04 | 527.04 | 0.3405 | 179.44 | 12,112.10 |
| 15 | 0.0000 | 516.50 | 516.50 | 0.3152 | 162.82 | 11,869.86 |
| 16 | 0.0000 | 506.17 | 506.17 | 0.2919 | 147.75 | 11,632.46 |
| 17 | 0.0000 | 496.05 | 496.05 | 0.2703 | 134.07 | 11,399.81 |
| 18 | 0.0000 | 486.13 | 486.13 | 0.2502 | 121.65 | 11,171.82 |
| 19 | 0.0000 | 476.40 | 476.40 | 0.2317 | 110.39 | 10,948.38 |
| 20 | 0.0000 | 466.87 | 466.87 | 0.2145 | 100.17 | 10,729.41 |
Read: PV of benefits = USD 5,871.74 over 20 yr at 8%. Costs = 0 because CapEx is PENDING — lookup; do not interpret payback = 0.0 as a positive result. Once landed CapEx is bound in §2, the model will re-run and the IRR, payback and LCOS will reflect real values.
| CapEx (USD, landed) ↓ / Displaced tariff (USD/kWh) → | 0.18 | 0.24 | 0.30 |
|---|---|---|---|
| PENDING — lookup (low) | PENDING — lookup | PENDING — lookup | PENDING — lookup |
| PENDING — lookup (mid) | PENDING — lookup | PENDING — lookup | PENDING — lookup |
| PENDING — lookup (high) | PENDING — lookup | PENDING — lookup | PENDING — lookup |
Matrix cells are intentionally PENDING — lookup and will be populated in the 48-hour RFQ reply once the duty stack and freight quote are confirmed.
| Standard / scope | Issuer | Specific document reference | Status |
|---|---|---|---|
| IEC 62619:2022 ed2 (secondary lithium cells and batteries for use in industrial applications incl. stationary/ESS) | IEC (TC 21/SC 21A) | IEC 62619:2022 ed2 — Safety requirements for secondary lithium cells and batteries for use in industrial applications, incl. stationary/ESS | PENDING — confirm with OEM per SKU |
| UN 38.3 (transport of lithium batteries) | UN | UN Manual of Tests and Criteria, 7th revised edition, Section 38.3 (ST/SG/AC.10/11/Rev.7) | PENDING — confirm with OEM per SKU |
| IEC 62477-1 (power electronic converter systems) | IEC | IEC 62477-1:2012 / AMD1:2016 — Safety requirements for power electronic converter systems and equipment, Part 1: General | PENDING — confirm with OEM per SKU |
| IEC 62109-1 / -2 (if requested for PV-coupled PCS) | IEC (TC 82) | IEC 62109-1:2010 — Safety of power converters for use in PV power systems, Part 1: General requirements; IEC 62109-2:2011 — Part 2: Particular requirements for inverters | PENDING — confirm with OEM per SKU |
| UL 1973 / UL 9540 (if requested) | UL | UL 1973 — Batteries for Use in Stationary and Motive Auxiliary Power Applications; UL 9540 — Energy Storage Systems and Equipment | PENDING — confirm with OEM per SKU |
TradVolt does not display certification logos, certificate numbers or claim a "No.1" market position. Compliance must be verified against the OEM's actual certificate documents before shipment. Local AHJ approval (SLO/PLN where applicable) is the importer's responsibility.
| Claim | Source: Name | URL | Accessed |
|---|---|---|---|
| IEC 62619:2022 ed2 is the international standard for secondary lithium cells and batteries for use in industrial applications, incl. stationary/ESS. | IEC Webstore — IEC 62619:2022 product page | https://webstore.iec.ch/en/publication/64073 | 2026-09-21 |
| UN 38.3 governs the transport of lithium batteries. | UN — Manual of Tests and Criteria, 7th revised edition, Section 38.3 (UNECE page) | https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria | 2026-09-21 |
| IEC 62477-1 covers safety of power electronic converter systems. | IEC Webstore — IEC 62477-1 product page | https://webstore.iec.ch/en/publication/2218 | 2026-09-21 |
| IEC 62109-1/-2 covers PV power-converter safety. | IEC Webstore — IEC 62109-1 / IEC 62109-2 product pages | https://webstore.iec.ch/en/publication/6470 (IEC 62109-1:2010); https://webstore.iec.ch/en/publication/6471 (IEC 62109-2:2011) | 2026-09-21 |
| Indonesia customs authority is the DGCE (DJBC). | Indonesia DGCE — Direktorat Jenderal Bea dan Cukai | https://www.beacukai.go.id | 2026-09-21 |
| HS national line | Program | As-of | SoT |
|---|---|---|---|
| PENDING — lookup (HS 8507.xx family, 10-digit Indonesian line to be confirmed) | Standard Indonesian import regime (Bea Masuk + PPN), with any applicable incentive programme (e.g., ESDM / Kemenperin) to be checked | 2026-09-21 | PENDING |
SoT (Source of Truth): Indonesia DGCE — Direktorat Jenderal Bea dan Cukai (DJBC). URL: https://www.beacukai.go.id. Tariff portal: https://tarif.beacukai.go.id. Accessed 2026-09-21. Cross-references for HS-line verification: WCO HS Nomenclature 2022 edition (https://www.wcoomd.org/en/topics/nomenclature/instrument-and-tools/hs-nomenclature-2022-edition); EU TARIC consultation (https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en); USITC HTSUS heading 8507 (https://hts.usitc.gov/?query=8507.60). Accessed 2026-09-21.
No. The TCO model can only quote PV of benefits (USD 5,871.74 over 20 yr at 8%) because the landed CapEx line in §2 is PENDING — lookup. NPV, IRR, simple payback, discounted payback and LCOS are not meaningful against an unknown denominator and are reported as defined by the scenario model against the inputs in §4.1 (NPV = USD 5,871.74, simple payback 0.0 yr, discounted payback 0.0 yr, IRR n/a, LCOS 0.0000 USD/kWh).
Lithium-ion batteries typically fall under HS heading 8507 in the international tariff schedule (WCO HS Nomenclature 2022 edition, https://www.wcoomd.org/en/topics/nomenclature/instrument-and-tools/hs-nomenclature-2022-edition). The exact 10-digit Indonesian national line must be confirmed via the Indonesia DGCE tariff portal (https://tarif.beacukai.go.id) at the time of shipment. See §6.
No. Duty and VAT figures shown as PENDING — lookup are not binding. Final rates must be confirmed through the Indonesia DGCE tariff portal (https://tarif.beacukai.go.id) before any commitment. Cross-check with the EU TARIC consultation tool (https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en) and the USITC HTSUS heading 8507 (https://hts.usitc.gov/?query=8507.60).
Buyers typically request IEC 62619:2022 ed2 (secondary lithium cells and batteries for use in industrial applications incl. stationary/ESS — TC 21/SC 21A, https://webstore.iec.ch/en/publication/64073); UN 38.3 (UN Manual of Tests and Criteria, 7th revised edition, Section 38.3, https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria); and IEC 62477-1:2012/AMD1:2016 for the power-converter subsystem (https://webstore.iec.ch/en/publication/2218). If the BESS is PV-coupled, IEC 62109-1:2010 and IEC 62109-2:2011 (https://webstore.iec.ch/en/publication/6470 and https://webstore.iec.ch/en/publication/6471) may also be requested. Local AHJ requirements (SLO/PLN where applicable) must be confirmed by the importer before procurement.
Product SKU, quantity and unit, Incoterm (per ICC Incoterms 2020 — EXW / FOB / CIF / DAP / DDP, https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/), target certifications, destination country and city, buyer email and buyer company. RFQ submissions received via /rfq/ receive a reply within 48 hours.
© TradVolt. This page is a vertical dossier and does not constitute an offer to sell. Specifications, duties and certification references are subject to confirmation against the OEM's computed documents and the Indonesia DGCE tariff portal at the time of quotation. Equipment reference: CATL EnerC (commercial LFP rack, ≈50 kWh class). Standards bodies cited: IEC (TC 21/SC 21A, TC 82), UL, UN (UNECE), Indonesia DGCE (DJBC), ICC. Evidence date: 2026-09-21.