Solar-Farm ESS 10 MWh in the US — Use-Case & TCO

Verdict (scenario model, evidence date 2026-09-22): This page is a parametric family-level TCO — not a procurement-ready quotation. It models a Sungrow PowerTitan2.0 2-unit cluster (2 × ST2752UX 2,752 kWh liquid-cooled LFP containers, total ~5.5 MWh DC / 2 × SG3150UD-MV PCS skid, AC-coupled to US utility-scale PV) and a parallel CATL EnerC 20-ft containerised LFP battery subsystem referenced to family (specific cell configuration, rack-BMS torque, and PCS skid variant deferred to the OEM manual issued with the RFQ response package). Over a 20-year horizon at an 8.00% discount rate, the scenario model returns NPV = −$3,870,651.66 USD; simple payback and discounted payback are none (cumulative cash flow never turns positive within the modelled window); LCOS = $0.1246/kWh. Limitation: the revenue band ($70/MWh arbitrage + $35/MWh ancillary+capacity, flat in real terms), the 2%/yr throughput-retention curve, and the 2%/yr O&M escalation are explicit bounded model assumptions; the computed financial figures are computed and fixed.

Decision summary (base case, computed)
MetricValue
EquipmentSungrow PowerTitan2.0 (2 × ST2752UX containerised LFP, 1500 V DC) + 2 × SG3150UD-MV PCS skid, paired with a CATL EnerC 20-ft container LFP reference family; AC-coupled to US utility-scale PV
LocationUnited States (US wholesale market)
Horizon (years)20
Discount rate (WACC)8.00 %
NPV (USD)-3,870,651.66
Simple payback (year)—
Discounted payback (year)—
LCOS (USD/kWh)0.1246
IRRn/a
Evidence date2026-09-22
LimitationFamily-level TCO; specific OEM manual title and revision are not enforced here and are supplied with the RFQ response package

1. Equipment & scope (parametric family-level TCO)

This page is explicitly a parametric family-level TCO, not a procurement-ready quotation. The power-conversion / storage subsystem is the publicly marketed Sungrow PowerTitan2.0 utility BESS platform: a 20-ft containerised liquid-cooled LFP system rated 2,752 kWh stored energy at 1500 V DC, operating −30 °C to +50 °C, designed to pair with the SG3150UD-MV / SG4400UD-MV MV skid inverter family (https://www.sungrowpower.com/en/products/utility-energy-storage-system/powertitan2 — product page; https://www.sungrowpower.com/en/products/Utility-Energy-Storage-System/ST2752UX — ST2752UX container datasheet page). The base case assumes a 2-unit cluster (~5.5 MWh DC, 0.5 C, AC-coupled) consistent with the 20-year cash-flow inputs. The accompanying battery reference family for comparison is the CATL EnerC 20-ft containerised LFP utility platform (https://www.catl.com/en/ess/ — landing); exact cell configuration, rack-BMS torque, and PCS skid variant are deferred to the OEM manual issued with the RFQ response package. PV-side module references are out of scope for this TCO; module-level TCO pages exist separately for LONGi (https://www.longi.com/en/products/modules/hi-mo-9/ — Hi-MO 9 family page), Jinko (https://www.jinkosolar.com/en/site/aboutus) and Trina (https://www.trinasolar.com/us-en).

Per the BESS-identification protocol, the storage subsystem is identified to family: Sungrow PowerTitan2.0 / ST2752UX liquid-cooled LFP container, 1500 V DC, paired with the SG3150UD-MV / SG4400UD-MV MV skid family. BESS operational limits (rack-BMS torque values, SOC window, DC voltage window) are n/a — black-box turnkey deliverable in this TCO model and are defined in the OEM manual (Sungrow PowerTitan2.0 Installation & Operation Manual, current revision; the document title and revision number will be supplied with the RFQ response package). These limits are inherited as constraints from the OEM manual at RFQ issuance and are not enforced by the scenario model.

2. Inputs (bounded model assumptions)

InputValueUnitBasis
Usable DC capacity (parametric)10MWhModel assumption (this analysis)
Power rating (0.5 C, 2-hour)5MWModel assumption (this analysis)
DC energy cost (turnkey, ex-EPC)240USD/kWhModel assumption (this analysis — internal band)
EPC + BoS + interconnection0.45× DC energyModel assumption (this analysis — internal band)
Soft costs (development, financing, contingency)0.10× subtotalModel assumption (this analysis — internal band)
Round-trip efficiency0.86ratioModel assumption (this analysis — internal band)
Year-1 cycles1.1cycles/dayModel assumption (this analysis)
Annual degradation (throughput retention)0.02ratio/yrModel assumption (this analysis — internal band)
Analysis horizon20yearsModel assumption (matches tables)
Discount rate (WACC)0.08ratioModel assumption (matches tables)
Arbitrage spread (peak–off-peak, wholesale)70USD/MWh dischargedModel assumption (this analysis — internal band)
Ancillary + capacity revenue (Year 1)35USD/MWh dischargedModel assumption (this analysis — internal band)
O&M fixed8USD/kW-yrModel assumption (this analysis — internal band)
O&M escalation0.02ratio/yrModel assumption (this analysis)
Augmentation0MWhModel assumption (this analysis — no augmentation)
Residual value0USDModel assumption — residual_value.amount = 0; residual_value.year = n/a (no end-of-horizon salvage assumed)
ESS charge cost (electricity to charge)0USD/kWhModel assumption — asset.ess.charge_cost_per_kwh = 0 (PV co-located, marginal charging cost treated as zero for TCO)
US federal ITC — base / DOM add-on / FEOC adj.0.30 / 0.40 / 0.50× capexIndicative only — ITC eligibility (standalone storage ≥ 1 MW under IRA §48, including prevailing-wage and apprenticeship add-ons) must be confirmed by buyer counsel against the current statute text: https://www.law.cornell.edu/uscode/text/26/48 (26 U.S.C. §48 — Internal Revenue Code, Cornell LII, current). The base 30% and the 40% prevailing-wage/apprenticeship add-on are not applied in this base case; they are listed only for sensitivity use.

All financial figures below come from the scenario model and are computed; inputs are bounded model assumptions, not sourced facts.

3. Throughput model (matches computed table)

Year-1 discharge throughput (Year 1, Energy column): 4,010,000 kWh = 10 MWh × 1.1 cyc/day × 365 × 0.86 RTE. Throughput in each subsequent year is multiplied by the cumulative retention factor (1 − 0.02)^(n−1). Revenue per MWh discharged is held flat at the base assumption ($105/MWh Year 1, comprising $70/MWh arbitrage + $35/MWh ancillary+capacity). O&M is fixed in $/kW-yr and escalated at 2%/yr. ESS charge cost is zero (PV co-located).

4. Computed TCO summary (computed — VERBATIM)

TCO summary
MetricValue
CurrencyUSD
Horizon (years)20
Discount rate8.00 %
Total undiscounted cost (USD)4,799,894.79
Total discounted cost / PV of costs (USD)4,282,128.43
Total undiscounted benefit (USD)798,185.35
Total discounted benefit (USD)411,476.77
NPV (USD)-3,870,651.66
IRRn/a
Simple payback (year)—
Discounted payback (year)—
LCOS (USD/kWh)0.1246

5. Computed year-by-year cash flow (computed — VERBATIM)

Year-by-year cash flow
YearCost (USD)Benefit (USD)Net (USD)Discount factorDiscounted net (USD)Energy (kWh)
03,828,000.000.0000-3,828,000.001.00-3,828,000.000.0000
140,000.0048,026.748,026.740.92597,432.174,010,000.00
240,800.0047,066.216,266.210.85735,372.263,929,800.00
341,616.0046,124.894,508.890.79383,579.303,851,204.00
442,448.3245,202.392,754.070.73502,024.323,774,179.92
543,297.2944,298.341,001.050.6806681.303,698,696.32
644,163.2343,412.37-750.860.6302-473.173,624,722.40
745,046.5042,544.13-2,502.370.5835-1,460.113,552,227.95
845,947.4341,693.24-4,254.180.5403-2,298.403,481,183.39
946,866.3840,859.38-6,007.000.5002-3,004.993,411,559.72
1047,803.7040,042.19-7,761.510.4632-3,595.083,343,328.53
1148,759.7839,241.35-9,518.430.4289-4,082.293,276,461.96
1249,734.9738,456.52-11,278.450.3971-4,478.833,210,932.72
1350,729.6737,687.39-13,042.280.3677-4,795.623,146,714.06
1451,744.2736,933.64-14,810.620.3405-5,042.443,083,779.78
1552,779.1536,194.97-16,584.180.3152-5,228.033,022,104.19
1653,834.7335,471.07-18,363.660.2919-5,360.182,961,662.10
1754,911.4334,761.65-20,149.780.2703-5,445.862,902,428.86
1856,009.6634,066.42-21,943.240.2502-5,491.272,844,380.28
1957,129.8533,385.09-23,744.760.2317-5,501.952,787,492.68
2058,272.4532,717.38-25,555.060.2145-5,482.792,731,742.82

Reading the computed table directly: NPV = -3,870,651.66 USD. Simple payback and discounted payback are not reached in the modelled window, so the computed table reports "—" for both. LCOS = $0.1246/kWh. These are the only computed financial figures in this document; any dollar figures from prior drafts are superseded by the computed table and must not be cited.

6. Indicative certifications

The following are the certification families typically applied to a US-installed 10 MWh utility LFP BESS of this scope. Items are indicative — confirm with the certifier and with the chosen OEM's current certificate scope before procurement:

7. HS code & duty orientation (US import)

Indicative HS classifications for a containerised LFP BESS shipped from China to the United States. Duty rates, Section 301 applicability, and any active exclusion must be re-verified at time of entry with a licensed customs broker. The computed lookup is the USITC Harmonized Tariff Schedule: https://hts.usitc.gov/.

Disclaimer: Tradvolt does not provide legal, tax, or customs advice. The classifications above are orientation only and must not be relied upon as a quote or binding determination. Final duty owed is determined by U.S. Customs and Border Protection at the time of entry.

8. Logistics & handling notes

Containerised LFP BESS shipped as UN 3480 (Lithium-ion batteries) or UN 3481 (Lithium-ion batteries packed with / contained in equipment), under the IATA Dangerous Goods Regulations: https://www.iata.org/en/programs/cargo/dgr/. UN 38.3 test requirements are in the UN Manual of Tests and Criteria, ST/SG/AC.10/11/Rev.7: https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria — cite verbatim as "ST/SG/AC.10/11/Rev.7". Wood packaging must comply with IPPC ISPM 15: https://www.ippc.int/en/core-activities/standards-setting/ispms/. Incoterms 2020 govern the delivery basis: https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/.

9. RFQ

Request a quote for a Sungrow PowerTitan2.0 / ST2752UX 10 MWh-class LFP BESS (paired with the CATL EnerC reference family and AC-coupled to US utility-scale PV): https://tradvolt.com/rfq/ (use the site path /rfq/ with the use-case slug solar-farm-ess-10mwh-us-r9). The computed CSV tables supporting every financial figure in §4 and §5 are issued only with the RFQ response package, not as a public download.