Use-case · B2B · CN → Uruguay

Import Solar Panel 700 W from China to Uruguay — Industrial Rooftop TCO

Vertical: industrial rooftop. scenario TCO brief for a 700 W-class PV module landed in Montevideo / free-zone deployment. Model results below are computed from the scenario and are computed; rates and yields remain model assumptions until confirmed by a live RFQ.

Request Quote — replies in 48h Download Spec & Datasheet
Verdict (500 kWp reference, Montevideo, 25-yr horizon, 8.00% discount, USD): Indicative landed CapEx ~USD 0.27–0.52/Wp, computed NPV ≈ USD 772,332, simple payback ≈ 2.21 yr, discounted payback ≈ 2.53 yr, LCOE ≈ 0.0316 USD/kWh, IRR ≈ 46.29%. A binding landed-cost offer requires an RFQ with current DNA/DGI duty and VAT lookup plus UTE tariff confirmation — see §8.
Decision metricValueHorizonDiscount rateCurrency
NPVUSD 772,332.4125 yr8.00%USD
IRR0.4629 (46.29%)25 yr8.00%USD
Simple payback2.21 yr25 yr8.00%USD
Discounted payback2.53 yr25 yr8.00%USD
LCOE0.0316 USD/kWh25 yr8.00%USD

Evidence date: 2026-09-21. Limitation: DNA import duty, DGI IVA rate, UTE avoided-import tariff and UTE export tariff are model assumptions pending official lookup (see §6); module price range is sourced from BloombergNEF / InfoLink tier-1 indexes; yield from PVGIS (JRC).

1. Scope and Module Definition

Reference module class: 700 W-class monocrystalline bifacial / TOPCon PV module intended for industrial-rooftop arrays in Uruguay. Tradvolt treats this as an unbranded reference class for the TCO model; specific OEM SKUs are bound to the RFQ and to the OEM datasheets listed in §9. Reference candidates used to ground the price index and datasheet-style limits:

Module class: 700 Wp nominal, monocrystalline silicon, bifacial, industrial-rooftop framing.
Use-case: grid-connected industrial rooftop, self-consumption + surplus export to UTE grid.
Origin: China (CN). Destination: Uruguay (UY), port of Montevideo (UYMVD) unless otherwise stated.

2. Compliance and Certifications

Uruguay's main off-taker, UTE (Administración Nacional de Usinas y Transmisiones Eléctricas), defines technical requirements for grid-connected PV equipment. The standards typically referenced for PV modules, and the issuing body portals, are:

Cert numbers and issuing body (TÜV Rheinland, TÜV SÜD, UL, VDE, JET, Kiwa) must be confirmed against the OEM certificate register at RFQ. Tradvolt does not assert specific certificate numbers on this page.

3. CapEx — Capital Cost Breakdown (landed, per Wp and per module)

Inputs below combine module ex-works, ocean freight, insurance, customs, VAT and BoS/BoP typical for an industrial rooftop. Duty and VAT rates are marked PENDING — lookup and must be confirmed against the official portals named in §6. The scenario uses a total installed CapEx of USD 175,000 for the 500 kWp reference (= USD 0.35/Wp, within the §3.1 illustrative low–high band).

Line itemBasisUnitValue (illustrative)Source / note
Module ex-works (FOB CN) Tier-1 CN OEM price indexUSD / Wp0.10 – 0.18 BloombergNEF PV module spot index: https://about.bnef.com/product/spot-price-indexes/ · InfoLink Consulting PV spot price index: https://www.infolink-group.com/energy/solar-price.html
Ocean freight CN→UYMVD40' HC containerUSD / Wp0.01 – 0.03 Drewry World Container Index weekly: https://www.drewry.co.uk/supply-chain-advisors/supply-chain-expertise/world-container-index-assessed-by-drewry/ · Shanghai Containerized Freight Index (SCFI) weekly: http://en.sse.net.cn/indices/scfi.do?method=index
Marine insurance~0.3% of CIFUSD / Wp~0.0005 Institute Cargo Clauses (LMA/JCC) wording: https://www.lmalloyds.com/LMA/Underwriting/Marine/Institute-Cargo-Clauses.aspx (rate applied is a model assumption; quote at RFQ)
Import duty (UY)Ad valorem on CIF%PENDING — lookup DNA arancelario en línea: https://www.aduanas.gub.uy/innovaportal/v/13556/1/innova.front/arancelario-en-linea.html
VAT (IVA)On duty-inclusive value%PENDING — lookup DGI — Dirección General Impositiva: https://www.dgi.gub.uy/wdgi/page?2,principal,dgi,sistemaTributario,O,es,0,PAG;CONC;1;D;tasas-y-precios;1;PAG;
Despachante / broker feesFlat per shipmentUSD / shipment200 – 600 Cámara de Despachantes de Aduana del Uruguay: https://www.cdauruguay.com.uy/ (model assumption; confirm per agent)
Last-mile delivery (Montevideo)Per WpUSD / Wp0.005 – 0.015 Local road freight benchmark (model assumption pending quote)
Mounting structure (industrial roof)Aluminium + stainless fixingsUSD / Wp0.05 – 0.09 Schletter industrial-rooftop catalogue: https://www.schletter-group.com/en/products/rooftop-systems/ · K2 Systems commercial roof: https://k2-systems.com/en/roof-systems/commercial-rooftop-systems · RBI Solar: https://www.rbisolar.com/commercial-industrial/
DC cabling, connectors, surge protectionBoS electricalUSD / Wp0.02 – 0.04 Stäubli MC4 / MC4-Evo 2 product page: https://www.staubli.com/en/electrical-connectors/photovoltaic/mc4-connectors.html · nVent ERIFLEX catalogue: https://www.nvent.com/en-us/catalog/electrical-and-fastening-solutions
Inverter + AC BoSString inverter 50–110 kWUSD / Wp0.05 – 0.10 Sungrow SG string inverter family: https://en.sungrowpower.com/product/string-inverter · Huawei SUN2000 commercial: https://solar.huawei.com/en/products/Smart-PV-Controller/SUN2000 · SINENG string inverter product list: https://www.sineng.com/product.html
EPC margin + engineeringDesign, install, commissioningUSD / Wp0.05 – 0.10 Local EPC quote (model assumption pending RFQ)
Grid-connection study + UTE feesPer projectUSD / Wp0.01 – 0.03 UTE Generación Distribuida: https://www.ute.com.uy/clientes/generacion-distribuida

3.1 CapEx roll-up — per Wp (illustrative band)

BucketLow (USD/Wp)High (USD/Wp)
Module landed (ex-works + freight + ins. + duty + VAT, where applicable)0.140.26
BoS + BoP + EPC + grid0.130.26
Total installed CapEx (illustrative)0.270.52

Rows sum is an arithmetic check; total is illustrative. Duty / VAT cells are PENDING — see §6. scenario uses USD 0.35/Wp × 500 kWp = USD 175,000 (within band).

4. OpEx — Annual Operating Cost (model assumption)

LineUnitValue (illustrative)Source / note
Routine O&M (cleaning, inspection)USD / kWp / yr3 – 7SolarPower Europe O&M best-practice mid-range: https://www.solarpowereurope.org/insights/outlooks/global-market-outlook-for-solar-power/2024-2028 (model assumption)
Inverter replacement reserve (12–15 yr)USD / kWp / yr1 – 3Sungrow service: https://en.sungrowpower.com/service · Huawei service: https://solar.huawei.com/en/service (model assumption)
Module cleaning (industrial rooftop)USD / kWp / yr1 – 3Local service quote (model assumption pending RFQ)
Insurance (all-risk)USD / kWp / yr1 – 2Mapfre Riesgos Industriales PV policy: https://www.mapfre.com.uy/seguros-para-empresas/ · Sancor Seguros Uruguay: https://www.sancorseguros.com.uy/ (model assumption)
Spare parts / unplanned maintenance reserveUSD / kWp / yr1 – 3Tradvolt internal benchmark (model assumption)
Total OpEx (illustrative)USD / kWp / yr7 – 18Sum of lines (model assumption)

scenario uses USD 12/kWp/yr × 500 kWp = USD 6,000 in Year 1, escalated at 2.0% per annum (model assumption).

5. Energy Yield, Self-Consumption and Payback

Industrial-rooftop sites in Uruguay (Montevideo / Canelones / San José) typically see specific yields in the range 1,400 – 1,700 kWh / kWp / yr depending on tilt, orientation and shading. Indicative inputs:

InputValue (illustrative)Source / note
System size500 kWp (= ~715 × 700 W modules)Reference case
Specific yield1,550 kWh / kWp / yr (Year 1)PVGIS (JRC) — PVGIS-SARAH2 interactive map, Uruguay: https://re.jrc.ec.europa.eu/pvg_tools/en/#MR
Performance ratio (PR)0.80IEC 61724-1:2021 PV system performance — IEC Webstore: https://webstore.iec.ch/en/publication/65562
Self-consumption share70 %Industrial 2-shift load profile (model assumption)
Export to UTE grid30 %UTE Generación Distribuida surplus regime: https://www.ute.com.uy/clientes/generacion-distribuida
Avoided import tariff (industrial)USD / kWhPENDING — lookup at UTE
UTE export tariffUSD / kWhPENDING — lookup at UTE
Annual degradation0.5 % / yr linear after Year 1Model assumption consistent with TOPCon 1st-year + linear warranty envelope in Jinko Tiger Neo / Trina Vertex N datasheets

5.1 Payback arithmetic (illustrative)

Annual energy (Year 1) = 500 kWp × 1,550 kWh/kWp = 775,000 kWh/yr.

Self-consumed = 775,000 × 0.70 = 542,500 kWh/yr. Exported = 232,500 kWh/yr.

Net annual benefit (placeholder rates used to show the formula — NOT current UTE prices):

Total CapEx at USD 0.35/Wp × 500 kWp × 1,000 = USD 175,000.

Simple payback = USD 175,000 ÷ USD 78,475/yr ≈ 2.21 years. The scenario model returns the same figure to two decimals and a discounted payback of ≈ 2.53 yr at an 8.00% discount rate over 25 years.

5.2 Sensitivity table

Sensitivity to−20 %Base+20 %Effect on payback
Specific yield (kWh/kWp)1,2401,5501,860±~33 % change in payback
Self-consumption share56 %70 %84 %Shifts payback ±~25 %
CapEx (USD/Wp)0.280.350.42Linear: 0.28→1.78 yr; 0.42→2.68 yr
Avoided import tariff (USD/kWh)0.1040.1300.156±~20 % change in payback

Sensitivity outputs are arithmetic-only. Rates and yields are placeholders; final values require a live UTE lookup and OEM RFQ. ILLUSTRATIVE — NOT A QUOTE.

6. Uruguay Duty & VAT Stack

HS national line | Program | As-of: 2026-09-21 | SoT: PENDING
Header fields are placeholders to be confirmed at RFQ against the official portals named below.
FieldValueOfficial portal
HS national line (UY) PENDING — lookup (PV modules typically under HS 8541.xx; confirm 6/8-digit line) DNA arancelario en línea: https://www.aduanas.gub.uy/innovaportal/v/13556/1/innova.front/arancelario-en-linea.html
Import duty (ad valorem) PENDING — lookup DNA arancelario en línea: https://www.aduanas.gub.uy/innovaportal/v/13556/1/innova.front/arancelario-en-linea.html
IVA (VAT) rate PENDING — lookup DGI — Tasas y precios: https://www.dgi.gub.uy/wdgi/page?2,principal,dgi,sistemaTributario,O,es,0,PAG;CONC;1;D;tasas-y-precios;1;PAG;
Trade-agreement preference PENDING — lookup (e.g. MERCOSUR, China bilateral, or none) MERCOSUR — Tratado de Asunción (DNA reference page): https://www.aduanas.gub.uy/innovaportal/v/13556/1/innova.front/arancelario-en-linea.html
UTE grid code / certificado de conexión PENDING — lookup UTE — Generación Distribuida / Reglamento: https://www.ute.com.uy/clientes/generacion-distribuida

7. TCO Outputs (computed, USD)

TCO summary
MetricValue
CurrencyUSD
Horizon (years)25
Discount rate8.00 %
Total undiscounted cost (USD)367,181.80
Total discounted cost / PV of costs (USD)251,044.21
Total undiscounted benefit (USD)2,536,380.69
Total discounted benefit (USD)1,023,376.62
NPV (USD)772,332.41
IRR0.4629
Simple payback (year)2.21
Discounted payback (year)2.53
LCOE (USD/kWh)0.0316
Year-by-year cash flow
YearCost (USD)Benefit (USD)Net (USD)Discount factorDiscounted net (USD)Energy (kWh)
0175,000.000.0000-175,000.001.00-175,000.000.0000
16,000.0084,475.0078,475.000.925972,662.04775,000.00
26,120.0085,733.6879,613.680.857368,255.90771,125.00
36,242.4087,011.1180,768.710.793864,116.81767,269.38
46,367.2588,307.5781,940.330.735060,228.59763,433.03
56,494.5989,623.3683,128.760.680656,576.04759,615.86
66,624.4890,958.7584,334.260.630253,144.89755,817.78
76,756.9792,314.0385,557.060.583549,921.72752,038.69
86,892.1193,689.5186,797.400.540346,893.93748,278.50
97,029.9695,085.4888,055.530.500244,049.69744,537.11
107,170.5696,502.2689,331.700.463241,377.86740,814.42
117,313.9797,940.1490,626.170.428938,868.01737,110.35
127,460.2599,399.4591,939.200.397136,510.32733,424.80
137,609.45100,880.5093,271.050.367734,295.57729,757.68
147,761.64102,383.6294,621.980.340532,215.10726,108.89
157,916.87103,909.1495,992.260.315230,260.76722,478.34
168,075.21105,457.3897,382.170.291928,424.93718,865.95
178,236.71107,028.7098,791.980.270326,700.41715,271.62
188,401.45108,623.43100,221.980.250225,080.45711,695.26
198,569.48110,241.91101,672.440.231723,558.73708,136.79
208,740.87111,884.52103,143.650.214522,129.29704,596.10
218,915.68113,551.60104,635.910.198720,786.53701,073.12
229,094.00115,243.52106,149.520.183919,525.20697,567.76
239,275.88116,960.65107,684.770.170318,340.36694,079.92
249,461.40118,703.36109,241.960.157717,227.39690,609.52
259,650.62120,472.04110,821.420.146016,181.91687,156.47

7.1 Model Assumptions (explicit bounded defaults)

AssumptionValue usedClass
residual_value.amountDROPPED-ITEM (residual value excluded from cost stream)Model assumption
residual_value.yearNot applied (see residual_value.amount)Model assumption
replacements[0].amountDROPPED-ITEM (no mid-life inverter/BoS replacement reserve booked as a discrete replacement capex line; covered inside the OpEx reserve)Model assumption
asset.pv.tariff_escalation_pct1.5% per annum on avoided-import tariff; 0% on UTE export tariff (placeholder; both pending UTE lookup)Model assumption
Discount rate8.00% / yrModel assumption (Tradvolt default for industrial B2B)
OpEx escalation2.0% per annumModel assumption
Module degradation0.5% per annum linear after Year 1Model assumption

8. Request a Quote

Tell us what you need. We reply within 48 hours with a binding landed-cost offer for the 700 W module on this use-case. The spec & datasheet bundle is delivered via the RFQ site path, not by email.

Spec & Datasheet Bundle

9. Sources

  1. BloombergNEF — PV Module Spot Price Index: https://about.bnef.com/product/spot-price-indexes/
  2. InfoLink Consulting — Solar PV Spot Price Index: https://www.infolink-group.com/energy/solar-price.html
  3. JRC (European Commission) — PVGIS-SARAH2 interactive PV map: https://re.jrc.ec.europa.eu/pvg_tools/en/#MR
  4. IEC Webstore — IEC 61215-1:2021 publication page: https://webstore.iec.ch/en/publication/61350
  5. IEC Webstore — IEC 61730-1:2016 publication page: https://webstore.iec.ch/en/publication/26170
  6. IEC Webstore — IEC 61701:2020 publication page: https://webstore.iec.ch/en/publication/31414
  7. IEC Webstore — IEC 61724-1:2021 publication page: https://webstore.iec.ch/en/publication/65562
  8. UTE — Generación Distribuida portal: https://www.ute.com.uy/clientes/generacion-distribuida
  9. DNA (Dirección Nacional de Aduanas) — Arancelario en línea: https://www.aduanas.gub.uy/innovaportal/v/13556/1/innova.front/arancelario-en-linea.html
  10. DGI (Dirección General Impositiva) — Tasas y precios: https://www.dgi.gub.uy/wdgi/page?2,principal,dgi,sistemaTributario,O,es,0,PAG;CONC;1;D;tasas-y-precios;1;PAG;
  11. Drewry — World Container Index: https://www.drewry.co.uk/supply-chain-advisors/supply-chain-expertise/world-container-index-assessed-by-drewry/
  12. Shanghai Containerized Freight Index (SCFI): http://en.sse.net.cn/indices/scfi.do?method=index
  13. Jinko Solar — Tiger Neo 3.0 datasheet: https://www.jinkosolar.com/uploads/2024/Tiger-Neo-3-0-Datasheet.pdf
  14. Trina Solar — Vertex N datasheet: https://www.trinasolar.com/sites/default/files/2024-04/DA08_UM_EN_2024_A.pdf
  15. LONGi — Modules product family: https://www.longi.com/en/products/modules/
  16. Sungrow — String inverter product family: https://en.sungrowpower.com/product/string-inverter
  17. Huawei Smart PV — SUN2000 controller family: https://solar.huawei.com/en/products/Smart-PV-Controller/SUN2000
  18. SINENG — String inverter product list: https://www.sineng.com/product.html
  19. Stäubli — MC4 / MC4-Evo 2 PV connectors: https://www.staubli.com/en/electrical-connectors/photovoltaic/mc4-connectors.html
  20. nVent — ERIFLEX electrical and fastening solutions: https://www.nvent.com/en-us/catalog/electrical-and-fastening-solutions
  21. Schletter — Industrial rooftop systems: https://www.schletter-group.com/en/products/rooftop-systems/
  22. K2 Systems — Commercial rooftop systems: https://k2-systems.com/en/roof-systems/commercial-rooftop-systems
  23. RBI Solar — Commercial & industrial: https://www.rbisolar.com/commercial-industrial/
  24. SolarPower Europe — Global Market Outlook for Solar Power 2024–2028: https://www.solarpowereurope.org/insights/outlooks/global-market-outlook-for-solar-power/2024-2028
  25. LMA — Institute Cargo Clauses: https://www.lmalloyds.com/LMA/Underwriting/Marine/Institute-Cargo-Clauses.aspx
  26. Mapfre Uruguay — Seguros para empresas: https://www.mapfre.com.uy/seguros-para-empresas/
  27. Sancor Seguros Uruguay: https://www.sancorseguros.com.uy/

10. Frequently Asked Questions

Q1. What is the scenario TCO result for a 700 W industrial-rooftop system in Montevideo?

For the modelled 500 kWp reference case the computed outputs (25-year horizon, 8.00% discount, USD) are: NPV 772,332.41; IRR 0.4629; simple payback 2.21 yr; discounted payback 2.53 yr; LCOE 0.0316 USD/kWh. Year-by-year cash flow is in §7.

Q2. What HS code applies to 700 W solar panels imported into Uruguay?

Photovoltaic cells and modules are commonly classified under HS heading 8541. The exact 6- or 8-digit national line must be confirmed against the DNA arancelario en línea (see §6).

Q3. Do 700 W modules need IEC certification for Uruguay?

UTE typically requires IEC 61215 and IEC 61730 evidence for grid-connected PV equipment, with IEC 61701 recommended for coastal sites. Confirm the accepted list and certificate numbers with UTE at the time of procurement.

Q4. How is payback calculated in the illustrative model?

Payback (years) = Total CapEx ÷ annual net cash flow. Annual net cash flow = (Energy yield × self-consumption share × avoided import price) + (Energy yield × export share × feed-in price) − annual OpEx. All inputs are listed in §5 and labelled ILLUSTRATIVE — NOT A QUOTE.

Q5. Can Tradvolt issue a binding quote for Uruguay delivery?

Not from this page. TCO briefs are orientation only. A binding landed cost requires a live RFQ with quantity, incoterm, destination, cert list and current freight / duty / VAT lookups. Use §8.

Q6. What documents are required for CN → UY customs clearance?

Commercial invoice, packing list, bill of lading or AWB, certificate of origin, IEC 61215 and IEC 61730 test certificates, datasheet, and any importer-specific requirements (e.g. UTE grid-approval letter). Confirm the current set with your despachante de aduanas.