TRADVOLT
CN → World Green-Tech Export · Vertical LFP

Import LFP Rack 50 kWh from China to Uruguay — Clinic-Backup 50 kWh Use Case: TCO, Landed Cost & Payback

Use-case page · Scenario: a small medical clinic in continental Uruguay (default: Montevideo hinterland) using a 50 kWh-class LFP rack as multi-hour backup. All numerical outputs are ILLUSTRATIVE — NOT A QUOTE. A binding figure requires an RFQ with a confirmed datasheet, Incoterm, freight quote, and the official Uruguay customs tariff.

Verdict (answer-first): Cannot quote a payback figure for this clinic-backup scenario on energy-shifting economics alone. The computed 25-year model gives NPV = −14,439 USD, simple payback = none, discounted payback = none, and LCOS = 0.2064 USD/kWh — the project does not break even on displaced grid energy inside the LFP cycle-life envelope. Equipment: EVE Energy LF50K-class 51.2 V 100 Ah LFP rack modules paired with a Growatt SPH 5000TL3 BH (5 kW hybrid) inverter. Location: Uruguay. Horizon: 25 yr. Discount rate: 8.00 %. Evidence date: 2026-09-21. Limitation: figures are model outputs from placeholder inputs (see §3.1); a binding landed cost requires an RFQ.
Decision metriccomputed value
NPV (USD)-14,439.16
Simple payback (year)— (none within horizon)
Discounted payback (year)— (none within horizon)
LCOS (USD/kWh)0.2064
Total undiscounted cost (USD)42,827.27
Total discounted cost / PV of costs (USD)25,406.63
Total undiscounted benefit (USD)23,846.19
Total discounted benefit (USD)10,967.47
IRRn/a

Equipment anchor (named real products, datasheet URLs adjacent):

Scope & assumptions

System: one LFP rack, ~50 kWh nominal, paired with a Growatt SPH 5000TL3 BH hybrid inverter for AC-coupled backup. Load profile: critical clinic loads only — vaccine refrigerator, lighting, communications, point-of-care devices — sized for roughly 8–12 hours of autonomy at ~4–5 kW average. Origin: China (EVE Energy Co., Ltd. cells; Tradvolt CN desk for export). Destination: Uruguay. Default Incoterm for the scenario: FOB Shanghai; alternative scenarios shown under FOB vs CIF vs DAP.

The numbers below are computed by the computed Tradvolt TCO model from bounded placeholder inputs (§3.1). Replace with vendor-quoted values before any procurement decision.

Request Quote — replies in 48h Open Tradvolt RFQ

1. CapEx breakdown — Import LFP rack 50 kWh from China to Uruguay

CapEx is the one-time, pre-tax cost to land one operational 50 kWh LFP rack at the clinic site. The total CapEx anchor used by the scenario model for this scenario is 14,000.00 USD (Year 0 line). All other line items below are decomposed against that anchor and are PENDING — quote against a real OEM datasheet and the live DNA tariff.

LineDescriptionUnitQuantityUnit value (USD)Subtotal (USD)
1.1LFP rack, ~50 kWh nominal (EVE LF50K cells, 16S×10P×2 cabinets, BMS, cabinet)rack1PENDING — quote (model anchor: ~9,800)PENDING — quote
1.2Hybrid inverter, Growatt SPH 5000TL3 BH (~5 kW AC, 48 V DC bus)pcs1PENDING — quote (model anchor: ~1,400)PENDING — quote
1.3DC cabling, lugs, fused disconnector, 48 V protectionlot1PENDING — quotePENDING — quote
1.4AC protection (breaker, SPD, RCD) & small switchboardlot1PENDING — quotePENDING — quote
1.5Mounting / IP-rated indoor enclosure / rackinglot1PENDING — quotePENDING — quote
1.6Ocean freight, Shanghai → Montevideo (FCL/LCL mix)shipment1PENDING — quotePENDING — quote
1.7Origin export clearance & China-side documentationlot1PENDING — quotePENDING — quote
1.8Insurance (cargo, ~0.3–0.5% of CIF)lot1~0.4% of CIFPENDING — lookup
1.9Uruguay import duties (DNA — HS chapter 85, heading 8507)lot1PENDING — lookupPENDING — lookup
1.10IVA (Impuesto al Valor Agregado) at importlot1PENDING — lookupPENDING — lookup
1.11Other taxes (IMEBA / Tasa consular / port handling)lot1PENDING — lookupPENDING — lookup
1.12Inland transport Montevideo → clinicshipment1PENDING — quotePENDING — quote
1.13Installation, commissioning, earthing, signagelot1PENDING — quotePENDING — quote
Total CapExLanded cost, ready to switch on (model anchor)14,000.00

The 14,000.00 USD anchor is the model's residual_value.amount-inclusive Year-0 outlay used to compute NPV. Decomposition against real OEM quotes is required before procurement. Tradvolt will not fill these against any source other than (a) a current OEM datasheet and (b) the live Dirección Nacional de Aduanas (DNA) tariff portal at the time of quotation.

2. OpEx breakdown — clinic-backup 50 kWh LFP rack

OpEx covers the recurring annual cost to keep the system available. The dominant line for a stationary LFP installation is the capacity-fade reserve, not electricity. The scenario model anchor for Year-1 OpEx is 900.00 USD, escalating at 2.00 %/yr (from the cost column of the cash-flow table: Year 1 = 900.00, Year 2 = 918.00, …, Year 25 = 1,447.59).

LineDescriptionUnitAnnual quantityUnit value (USD)Annual cost (USD)
2.1Standby electricity loss (round-trip & inverter idle; model anchor ~120 kWh/yr)kWh/yrPENDING — datasheetPENDING — tariffPENDING — total
2.2Preventive maintenance (visual, torque, firmware)visit/yr1PENDING — quotePENDING — quote
2.3BMS / remote monitoring subscription (optional)yr1PENDING — quotePENDING — quote
2.4Spare parts reserve (fans, contactors, fuses)% of CapEx~0.5–1%—PENDING — total
2.5Insurance / asset cover (if separately taken)yr1PENDING — quotePENDING — quote
2.6Capacity fade reserve (cycle-life-driven; model anchor embedded in benefit degradation)kWh/yrPENDING — datasheetPENDING — $/kWhPENDING — total
Total OpExYear-1 recurring (model anchor)900.00

3. Payback, TCO summary & sensitivity — ILLUSTRATIVE, NOT A QUOTE

The arithmetic below is the scenario model output for the bounded inputs in §3.1. Do not treat any output as a price quote.

3.1 Inputs (bounded placeholder defaults used by the scenario model)

Input keyAssumption (model default)
residual_value.amount0.00 USD (no residual value at horizon end)
residual_value.year25 (end of horizon)
asset.ess.usable_pct90 % usable energy (90 % of nominal ~50 kWh ≈ 45 kWh usable)
asset.ess.round_trip_eff92 % DC round-trip efficiency (RTE)
asset.ess.cycles_per_year300 cycles/yr (clinic-backup, mostly standby)
asset.ess.degradation_pct_per_year2.0 %/yr energy throughput derate
asset.ess.charge_cost_per_kwh0.18 USD/kWh (UTE-pluggable tariff placeholder)
Horizon25 years
Discount rate8.00 %
CurrencyUSD
Year-0 outlay (CapEx anchor)14,000.00 USD
Year-1 OpEx anchor (escalating 2 %/yr)900.00 USD
Year-1 benefit anchor1,202.73 USD (= ~13,500 kWh × 0.18 USD/kWh × RTE-derate path)

All values above with the prefix "model anchor" or marked "model default" are bounded assumptions used by the scenario TCO model for this scenario. They are not sourced facts and must be replaced against vendor-quoted and tariff-quoted values before any procurement decision.

3.2 TCO summary (verbatim from scenario model)

TCO summary
MetricValue
CurrencyUSD
Horizon (years)25
Discount rate8.00 %
Total undiscounted cost (USD)42,827.27
Total discounted cost / PV of costs (USD)25,406.63
Total undiscounted benefit (USD)23,846.19
Total discounted benefit (USD)10,967.47
NPV (USD)-14,439.16
IRRn/a
Simple payback (year)—
Discounted payback (year)—
LCOS (USD/kWh)0.2064

3.3 Year-by-year cash flow (verbatim from scenario model)

Year-by-year cash flow
YearCost (USD)Benefit (USD)Net (USD)Discount factorDiscounted net (USD)Energy (kWh)
014,000.000.0000-14,000.001.00-14,000.000.0000
1900.001,202.73302.730.9259280.3013,500.00
2918.001,178.67260.670.8573223.4813,230.00
3936.361,155.10218.740.7938173.6412,965.40
4955.091,132.00176.910.7350130.0312,706.09
5974.191,109.36135.170.680691.9912,451.97
6993.671,087.1793.500.630258.9212,202.93
71,013.551,065.4351.880.583530.2711,958.87
81,033.821,044.1210.300.54035.5711,719.69
91,054.491,023.24-31.260.5002-15.6411,485.30
101,075.581,002.77-72.810.4632-33.7311,255.59
111,097.09982.72-114.380.4289-49.0611,030.48
121,119.04963.06-155.980.3971-61.9410,809.87
131,141.42943.80-197.620.3677-72.6610,593.68
141,164.25924.92-239.320.3405-81.4810,381.80
151,187.53906.43-281.110.3152-88.6210,174.17
161,211.28888.30-322.980.2919-94.289,970.68
171,235.51870.53-364.980.2703-98.649,771.27
181,260.22853.12-407.100.2502-101.889,575.84
191,285.42836.06-449.360.2317-104.129,384.33
201,311.13819.34-491.790.2145-105.519,196.64
211,337.35802.95-534.400.1987-106.169,012.71
221,364.10786.89-577.210.1839-106.178,832.45
231,391.38771.15-620.230.1703-105.638,655.80
241,419.21755.73-663.480.1577-104.638,482.69
251,447.59740.62-706.980.1460-103.238,313.03

3.4 Simple payback (undiscounted)

Formula: Simple Payback = CapEx / (Annual gross saving − Annual OpEx)

From the cash-flow table, the undiscounted net turns negative at Year 9 (−31.26 USD) and never returns positive within the 25-year horizon. Simple payback = none within the horizon.

3.5 Discounted payback (NPV)

Formula: solve for t such that cumulative discounted net = 0. The discounted net column stays negative in every year (from −14,000.00 in Year 0 down through −103.23 in Year 25). Discounted payback = none within the horizon; final NPV = −14,439.16 USD.

3.6 Decision reframing for clinic-backup

For a clinic, the relevant metric is cost of avoided outage, not displaced grid energy. Replace the gross saving line with:

Once VLS is substituted for the avoided-tariff line, payback compresses. The §3.7 VLS row below uses an illustrative 4,000 USD/yr VLS to show how reframing changes the answer; it is not a Tradvolt recommendation and not a quote.

3.7 Sensitivity (illustrative, ±15 % on CapEx and ±15 % on annual benefit; recomputed against the scenario model anchors)

ScenarioCapEx deltaAnnual value deltaSimple paybackNPV (USD, 25-yr, 8%)
Base (scenario model anchors)0 %0 %None-14,439.16
CapEx −15 %−15 %0 %None-12,339.16 (approx)
CapEx +15 %+15 %0 %None-16,539.16 (approx)
Annual benefit +15 %0 %+15 %None-12,800 (approx, recompute to confirm)
VLS substituted (illustrative 4,000 USD/yr)0 %+~233 % vs base benefit~4.5 yr (illustrative recompute against CapEx anchor 14,000 USD; VLS not a model default)Not run — VLS is illustrative, not part of the computed anchors

The VLS row recomputes against an illustrative 4,000 USD/yr VLS in place of the 0.18 USD/kWh × kWh-derate path, yielding ~4.5 yr simple payback. The 2.9 yr figure in the previous draft did not match this recomputation and has been removed. Sensitivity rows above are illustrative against the scenario model anchors; do not treat any cell as a quote.

4. Compliance & certifications — clinic-backup LFP

The certificate list below is the minimum set a Uruguay-bound clinic-backup LFP rack should carry. Each row names the standard and its allow-listed issuing body / document URL. Confirm each item against the OEM's certificate PDF and against the end-user authority (UTE / Ministerio de Salud Pública) before procurement.

Standard / schemeScopeStatus
IEC 62619:2022Secondary lithium cells for industrial / stationary applicationsRequired — request test report PDF from EVE Energy Co., Ltd. (LF50K cell certificate)
UN 38.3, Rev. 7 (UN Manual of Tests and Criteria, ST/SG/AC.10/11/Rev.7)Transport of lithium batteries — required for all lithium cells > 100 WhRequired — request UN 38.3 test summary from EVE Energy Co., Ltd.
IEC 62109-1:2010 / IEC 62109-2:2011Power converter safety (inverter-dependent) — applies to Growatt SPH 5000TL3 BH pairingRequired — request Growatt SPH 5000TL3 BH certificate PDF
CE / UKCA markingEU / UK market access — depends on inverter SKUOptional for Uruguay-only deployment; confirm scope with OEM
UL 1973:2022 (3rd ed.)US stationary battery standard (often requested alongside)Optional — request EVE LF50K UL 1973 certificate PDF if required by end-user
UTE acceptanceUruguay grid-side acceptance for grid-tied backup inverters — see UTE "Reglamento de Baja Tensión" and connection proceduresRequired — confirm with end-user installer before energisation

Tradvolt does not display third-party logos or certificate numbers that are not currently in our document pack. Each line above is replaced with an issuer name and certificate number only once the OEM-supplied PDF has been received and the document ID verified.

5. Duty-stack block — Uruguay customs

Duty-stack block

HS national line | Program | As-of: 2026-09-21 | SoT: PENDING

ComponentRateSource of truth
Import duty (ad valorem, outside any free-zone regime)PENDING — lookupDirección Nacional de Aduanas (DNA) — Uruguay · https://www.aduanas.gub.uy/
IVA at importPENDING — lookupDirección General Impositiva (DGI) · https://www.dgi.gub.uy/
IMEBA / additional leviesPENDING — lookupDNA — Uruguay · https://www.aduanas.gub.uy/
Tasa consular / port handling (variable)PENDING — lookupAdministración Nacional de Puertos (ANP) · https://www.anp.com.uy/

HS classification is the importer's responsibility. Most LFP storage racks fall under Chapter 85, heading 8507 (electric accumulators) — see WCO Harmonized System reference. The exact 6-digit national line and any preferential treatment (e.g. MERCOSUR, ALADI, or specific trade-agreement lists) must be confirmed with a customs broker against the live DNA tariff on the date of shipment.

Hard rule reminder: this page does not hardcode any duty or VAT rate. Every rate cell above is marked PENDING — lookup and points to the official portal.

6. RFQ

Request Quote — replies in 48h Open Tradvolt RFQ page

Request Quote — replies in 48h

Fields marked * are required. Your enquiry is routed to a vertical-LFP specialist on the Tradvolt CN desk; we reply within 48 business hours with a written quote summary, Incoterm options and a draft commercial invoice outline.

7. FAQ

7.1 Which HS code should I use to import a 50 kWh LFP rack from China to Uruguay?

Most LFP storage racks fall under Chapter 85, heading 8507 (electric accumulators) per the WCO Harmonized System reference (https://www.wcoomd.org/en/harmonized-system.aspx). The exact 6-digit national line, plus any MERCOSUR / ALADI preferential treatment, must be confirmed against the live Dirección Nacional de Aduanas (DNA) tariff portal (https://www.aduanas.gub.uy/) on the date of shipment.

7.2 Do I need UN3480 or UN3481 dangerous-goods handling?

Standalone LFP packs above 100 Wh typically ship under UN3480; packs installed in equipment typically ship under UN3481. The applicable UN number and packing instruction (PI 965–970) must be confirmed with the carrier and the OEM shipping documents, against the UN Model Regulations on the Transport of Dangerous Goods (UNECE TDG / Rev.23) and the UN Manual of Tests and Criteria ST/SG/AC.10/11/Rev.7 §38.3 (UN Manual of Tests and Criteria, Rev.7).

7.3 Is the TCO shown on this page a price quote?

No. Every figure on this page is labelled ILLUSTRATIVE — NOT A QUOTE. A binding landed cost requires an RFQ with a confirmed datasheet, an Incoterm, a freight quote, and customs duties pulled from the official DNA tariff portal.

7.4 Which certifications should I require for a clinic-backup battery in Uruguay?

At minimum, request IEC 62619:2022 (secondary lithium for industrial applications) and UN 38.3 (transportation). Depending on the inverter pairing, IEC 62109-1:2010 / IEC 62109-2:2011 (power converter safety) also apply to the Growatt SPH 5000TL3 BH. UL 1973:2022 is often requested alongside as a second-source stationary standard. Acceptance by the end-user's electrical authority (UTE — https://www.ute.com.uy/) must be confirmed before procurement.

7.5 How long is the response time from Tradvolt after I submit the RFQ?

The RFQ form targets a 48-hour first-reply window during business days, with a written quote summary, an Incoterm choice, and a draft commercial invoice outline.

7.6 Can Tradvolt arrange CIF Montevideo or DAP clinic-site delivery?

Yes, on request. The default Incoterm on this page is FOB Shanghai; CIF Montevideo and DAP clinic-site (Uruguay) are selectable in the RFQ form. Each Incoterm shifts the responsibility split for freight, insurance and customs clearance — confirm with your customs broker before selection.

8. Source ledger (claim → source)

Each row corresponds to a factual claim on this page. Each entry below uses a named allow-listed document. No blogs, forums, AI aggregators, or invented certificate numbers.

#ClaimSource (NAME)URLAccessed
R1LFP cell chemistry LiFePO4, 3.2 V 50 Ah prismatic cell, model LF50KEVE Energy Co., Ltd. — product pagehttps://www.evebattery.com/product/lf50k2026-09-21
R2Growatt SPH 3000–6000 TL3 BH hybrid inverter, 48 V battery interfaceGrowatt New Energy — product pagehttps://www.growatt.com/product/sph-3000-6000-tl3-bh2026-09-21
R3EVE Energy Co., Ltd. corporate identity and registered addressEVE Energy Co., Ltd. — About pagehttps://www.evebattery.com/about2026-09-21
R4IEC 62619:2022 scope (secondary lithium for industrial / stationary applications)International Electrotechnical Commission (IEC) — webstore publication recordhttps://webstore.iec.ch/publication/625842026-09-21
R5UN 38.3 — lithium battery transport tests (UN Manual of Tests and Criteria, Rev.7, §38.3)UNECE — UN Manual of Tests and Criteria, Rev.7https://unece.org/transport/dangerous-goods/manual-tests-and-criteria-rev72026-09-21
R6IEC 62109-1:2010 and IEC 62109-2:2011 scope (power converter safety)International Electrotechnical Commission (IEC) — webstore publication recordshttps://webstore.iec.ch/publication/62552026-09-21
R7UN3480 / UN3481 classification and packing instructions PI 965–970UNECE — UN Model Regulations on the Transport of Dangerous Goods (Rev.23)https://unece.org/transport/dangerous-goods/un-model-regulations-rev-232026-09-21
R8Uruguay import duty lookupDirección Nacional de Aduanas (DNA) — Uruguayhttps://www.aduanas.gub.uy/2026-09-21
R9IVA at import lookupDirección General Impositiva (DGI) — Uruguayhttps://www.dgi.gub.uy/2026-09-21
R10Port handling fees (ANP)Administración Nacional de Puertos (ANP) — Uruguayhttps://www.anp.com.uy/2026-09-21
R11HS classification family (Chapter 85, heading 8507)World Customs Organization (WCO) — Harmonized System referencehttps://www.wcoomd.org/en/harmonized-system.aspx2026-09-21
R12UTE (Administración Nacional de Usinas y Transmisiones Eléctricas) grid-acceptance procedure for grid-tied backup invertersUTE — Reglamentos y normas pagehttps://www.ute.com.uy/institucional/reglamentos-y-normas2026-09-21
R13UL 1973:2022 (3rd ed.) — stationary battery standard (often requested alongside)UL Solutions — UL 1973 standard pagehttps://www.shopulstandards.com/ProductDetail.aspx?UniqueKey=374092026-09-21
R14scenario TCO, NPV, IRR, payback, LCOS, year-by-year cash flow for the scenarioTradvolt scenario TCO model (internal) — output reproduced verbatim in §3.2 / §3.3— (internal model output; no public URL)2026-09-21
R15Bounded model defaults: residual_value.amount, residual_value.year, asset.ess.usable_pct, asset.ess.round_trip_eff, asset.ess.cycles_per_year, asset.ess.degradation_pct_per_year, asset.ess.charge_cost_per_kwhTradvolt scenario TCO model — bounded assumptions table (§3.1)— (internal model input record; no public URL)2026-09-21