Warranty Failure-Analysis Report SOP — CN→EC Corridor

Scope: LFP (lithium iron phosphate) BESS (battery energy storage system) equipment and replacement parts shipped from China to Ecuador under a Tradvolt warranty. Document type: Standard Operating Procedure (Process / SOP). Vertical: LFP BESS.

Process summary

Decision / verdict: This SOP closes a warranty RMA for an in-scope LFP BESS unit in an internal target of approximately 14 calendar days from buyer claim intake (D0) to RMA closure (D14), contingent on (a) a live HS/duty lookup at the Servicio Nacional de Aduana del Ecuador (SENAE) portal on the day of declaration, and (b) on-time return transit under the named ICC Incoterms 2020 rule. The 14-day figure is an internal SLA target, not a public contractual figure; it is bounded by the diagnostics window (Steps 5–6), the FAR internal review (Step 8), and the CN→EC re-shipment + EC customs clearance window (Steps 10–11). The route is China → Ecuador with a diagnostic stop at the CN service centre, so elapsed time is driven by diagnostics on the inbound leg and by Incoterms 2020 + SENAE customs on the outbound leg.

ItemValue
Decision / verdictClose warranty RMA in ~14 calendar days (internal SLA, not a sourced public figure)
Equipment in scopeLFP BESS equipment and replacement parts (see in-scope model families)
Location / corridorChina (CN) → Ecuador (EC), with diagnostic stop at CN service centre
HorizonD0 (claim intake) → D14 (RMA close), indicative
Evidence date2026-09-22
LimitationHS codes and EC duty rates are PENDING until a live SENAE query is performed on the day of declaration; the 14-day target is an internal SLA, not a published public figure.

Hard numbers and certification references in this document are sourced exclusively from allow-listed publications (OEM product pages / datasheets, IEC / UL standards, ISO standards, ICC Incoterms 2020, IATA DGR, UN Manual of Tests and Criteria, FIATA documents, and official customs portals).

In-scope LFP BESS model families

This SOP applies to the LFP BESS equipment families listed below that Tradvolt supplies to the CN→EC corridor. Cabinet ratings and cycle figures are sourced from the manufacturer's official product page and are confirmed again at RFQ; torque limits, SOC windows, and DC voltage limits are governed by the OEM service manual shipped with each unit (see Sources).

OEMModel familyKey published ratingsSource
CATLEnerC (commercial / utility LFP container BESS)Ratings confirmed at RFQ via OEM product pageCATL Energy Storage (manufacturer site)
BYDMC Cube / HVS / HVM commercial-industrial LFPCabinet ratings confirmed at RFQ via OEM product pageBYD Energy Storage (manufacturer site)
SungrowPowerTitan 2.0 utility container BESS; ST2752UX liquid-cooled container; SBH100–400 residential HV stackPowerTitan 2.0: 2.5 MW / 5 MWh in 20-ft container, max AC output 2520 kW, stored energy 5015 kWh, 1500 V DC, −30 to +50 °C operation, 100 MWh station in ~1200 m². ST2752UX: 2752 kWh, 1500 V DC, −30 to +50 °C, pairs with SG3150/4400UD-MV. SBH100–400: 5 kWh/module, 10–40 kWh/unit, max 160 kWh, 0 ms switchoverSungrow PowerTitan 2.0; Sungrow ST2752UX; Sungrow SBH100–400
Huawei FusionSolarLUNA2000-7/14/21-S1 residential HV stack; LUNA2000-215 Series C&ILUNA2000-7/14/21-S1: 5–21 kWh towers (5/7/10/12/14/15/17/19/21-S1), 3.5 kW per module / 10.5 kW per ESS, up to 252 kWh with 12 ESS on 3 inverters, 29 dB, IP66, fire suppression in 15 s. LUNA2000-215 Series ratings confirmed at RFQHuawei LUNA2000-7/14/21-S1; Huawei LUNA2000-215 Series
EVE EnergyLF304 prismatic LFP cell (replacement-part level)LF304: 304 Ah nominal, 3.2 V, 4000 cycles @ 25 °C to ≥80%, 173.7 × 71.7 × 207.2 mm, 5450 gEVE LF304 product page (official EVE mall)
PylontechUS5000 residential LFP module (replacement-part / small-C&I level)US5000: 48 V DC nominal, 4.8 kWh nominal / 4.56 kWh usable, 95% DoD, 39.7 kg, 442 × 420 × 161 mm, RS485/CAN, 15-year design life, >6000 cycles @ 25 °CPylontech US5000 spec sheet PDF
DeyeBOS-G high-voltage LFP battery rackBOS-G: 5.12 kWh / 51.2 V / 100 Ah per module, systems 20.48–61.44 kWh from 4–12 modules, 19-inch rack, >6000 cycles, intelligent BMS with aerosol fire extinguishingDeye BOS-G product / spec page

If the RMA concerns a model family outside this table, scope it under the Generic-LFP clause below and confirm model-specific acceptance criteria against the OEM service manual at intake.

Generic-LFP clause (out-of-table families): For any LFP BESS equipment supplied by Tradvolt that is not named in the table above, the SOP steps still apply. Torque values, SOC windows, DC voltage limits, and acceptance criteria are taken from the OEM service manual shipped with that specific unit; the Warranty Desk must attach the manual revision to the RMA file at intake.

Document checklist (filenames)

Upload the following files to the RMA folder before Step 1 is marked Done.

Timeline & dependencies

The durations below are internal SLA targets used by Tradvolt to plan the corridor; they are not public contractual figures and not sourced from an external publication. The 14-day total is the sum of the day-slot targets below.

PhaseActivityIndicative duration (internal SLA)Predecessor
D0Buyer submits claim & photos1 business day—
D1Acknowledge & assign RMA1 business dayD0
D2–D5Return pickup in Ecuador & CN→EC transit to CN service centreindicative 4 business daysD1
D6–D9Diagnostics & failure classificationindicative 4 business daysD5
D10FAR drafting & internal reviewindicative 2 business daysD9
D11FAR release to buyer1 business dayD10
D12–D14Disposition, re-shipment CN→EC & customs clearanceindicative 3 business daysD11
D14Close RMA file0.5 business dayD14

Total indicative elapsed time (internal SLA): 14 calendar days from claim intake to RMA closure.

Step-by-step procedure

Step #ActionOwnerInput docOutput docDone-when
1Receive claim, verify warranty window, acknowledge in writing.Warranty DeskRMA_intake-form.pdf, warranty-card.pdfRMA_ack-email.pdfWritten acknowledgement sent to buyer within 1 business day.
2Assign RMA number; issue CN→EC return-logistics instructions under the named ICC Incoterms 2020 rule.Warranty DeskRMA_ack-email.pdf, incoterm-2020-rule.pdfRMA_number-assigned.pdf, return-instructions.pdfRMA number issued; return instructions sent.
3Coordinate pickup in Ecuador and door-to-door transit along the CN→EC corridor.Logistics Coordinatorreturn-instructions.pdfpickup-order.pdf, CN-EC-house-AWB.pdfCarrier confirmed and pickup window scheduled.
4Receive returned goods at the CN service centre; open RMA file; quarantine units.Service Centre (CN)CN-EC-house-AWB.pdf, serial-list.csvRMA_receipt-note.pdfGoods received, inspected against serial list, and quarantined.
5Run the OEM-defined diagnostic procedure; record measurements against acceptance criteria in the OEM service manual.Field EngineerOEM-service-manual_<model>-<rev>.pdf (internal / non-public), RMA_receipt-note.pdfdiagnostic-record.pdfAll required measurements recorded with units and pass/fail status per the OEM service manual.
6Classify failure mode and root cause using the OEM failure-mode catalogue; tag defective sub-assembly or reject unit.QA Leaddiagnostic-record.pdf, buyer-photos.zipfailure-classification.pdfFailure-mode and root-cause codes assigned per OEM catalogue.
7Draft the FAR with claim evidence, OEM test data, photographs, root-cause classification, and disposition.QA Leadfailure-classification.pdf, diagnostic-record.pdf, buyer-photos.zipFAR_draft_v1.pdfFAR draft contains all sections of the FAR template.
8Internal QA review of the draft FAR for accuracy, completeness, and OEM-service-manual alignment.QA ManagerFAR_draft_v1.pdf, OEM-service-manual_<model>-<rev>.pdfFAR_review-notes.pdfReview comments addressed or formally accepted in writing.
9Release the signed FAR to the buyer; tag the disposition outcome in the warranty ledger.Warranty DeskFAR_signed.pdfFAR_release-email.pdf, warranty-ledger-row.csvSigned FAR delivered to buyer and ledger updated.
10Execute the FAR disposition (repair / replace / scrap); when applicable, ship a replacement along the CN→EC corridor under the named ICC Incoterms 2020 rule.Logistics CoordinatorFAR_signed.pdfdisposition-order.pdf, CN-EC-replacement-AWB.pdfDisposition executed and replacement shipment booked.
11File the import declaration against the equipment HS code and the replacement-parts HS code (see Duty/HS block) after a live SENAE query; pay any applicable duties.Customs Broker (EC)CN-EC-replacement-AWB.pdf, commercial-invoice.pdf, packing-list.pdfEC-import-declaration.pdfImport declaration accepted by the Ecuadorian SENAE portal and duties settled.
12Close the RMA file; archive FAR evidence; trigger post-shipment feedback loop.Warranty DeskFAR_signed.pdf, EC-import-declaration.pdfRMA_closed.pdfRMA closed in the ledger and all evidence archived.

Duty / HS block

Replacement units and replacement parts travel under different customs treatments. Use the HS code that matches the goods being declared; do not mix codes on a single line. All HS codes and duty rates below are placeholders pending a live query at the SENAE portal on the day of declaration.

ItemHS code (Ecuador)Duty rateOfficial portalNotes
LFP BESS complete unit (e.g., CATL EnerC, BYD MC Cube, Sungrow PowerTitan 2.0, Huawei LUNA2000-215)8504.40 — PENDING — live SENAE lookupPENDING — live SENAE lookupServicio Nacional de Aduana del Ecuador (SENAE)Confirm sub-heading and any Andean Community preferences before declaring.
LFP cells / modules supplied as replacement parts (e.g., EVE LF304, Pylontech US5000, Deye BOS-G modules)8507.60 — PENDING — live SENAE lookupPENDING — live SENAE lookupServicio Nacional de Aduana del Ecuador (SENAE)Confirm whether lithium-ion cells for BESS fall under 8507.60 or another 8507 sub-heading.
Power-conversion spare parts (PCBs, BMS, contactors)8537 / 8538 — PENDING — live SENAE lookupPENDING — live SENAE lookupServicio Nacional de Aduana del Ecuador (SENAE)Classify by function; do not declare all spares under the same code.

Disclaimer: HS codes and duty rates above are placeholders. The Customs Broker must verify the exact HS code and applicable duty, VAT, and anti-dumping measures on the official Ecuadorian customs portal (SENAE) on the day of declaration. Tradvolt does not warrant the accuracy of any duty rate that has not been confirmed by the broker against a live SENAE query.

Source: [Claim: Ecuadorian customs declarations are filed through SENAE — Src: Servicio Nacional de Aduana del Ecuador (SENAE), official portal — URL: https://www.aduana.gob.ec/ — accessed 2026-09-22].

Indicative cost slots

The figures below are indicative cost ranges only and are UNCERTAIN until the Customs Broker queries SENAE on the day of declaration and the Logistics Coordinator confirms the carrier rate sheet. They are not a quotation.

Cost lineStatusOwner who confirms
Return pickup in Ecuador (D2)indicativeLogistics Coordinator
CN→EC return freight (D2–D5)indicativeLogistics Coordinator
Diagnostic labour at the CN service centre (D6–D9)indicativeService Centre (CN)
Replacement unit / part cost (D10)indicativeWarranty Desk
Replacement CN→EC freight (D12–D14)indicativeLogistics Coordinator
Ecuadorian import duty & VAT (D14)UNCERTAIN — depends on live SENAE lookupCustoms Broker (EC)
Customs broker fee (D14)indicativeCustoms Broker (EC)

Sources

RFQ

Request a quotation for a warranty failure-analysis project on the CN→EC corridor for an in-scope LFP BESS unit. Replies within 48 hours during business days.

Request Quote — replies in 48h