TradVoltUse Cases › Arcade-EVSE 4-Port TCO in the EU

Arcade-EVSE 4-Port TCO in the EU

Use case for a 4-port arcade-style AC EVSE cluster deployed in an EU commercial venue (mall, hotel, leisure center). Equipment: Sigenergy Sigen EVAC 22 kW (4-port arcade enclosure), installed per Sigenergy installation manual rev. 2025-03. Horizon: 8 years. Discount rate: 4.0% real. Evidence date: 2026-01-12. Limitation: 8-year horizon assumes no mid-life power-module replacement beyond standard preventive maintenance; site-specific DSO reinforcement costs must be confirmed with the operator's DSO. Limitation: no CE/RED/LVD certificate number, no notified body, and no MID/Eichrecht certificate is asserted in this page.

Verdict

Across the base scenario, the 4-port arcade-EVSE cluster delivers NPV = +74,203.24 EUR at a 4.0% real discount rate over an 8-year horizon, with a simple payback of 1.75 years and a discounted payback of 1.85 years. TCO per km is 0.1353 EUR/km (EV) versus 0.3410 EUR/km (ICE), i.e. 0.2057 EUR/km savings, totalling 263,300 EUR over the horizon. Equipment: Sigenergy Sigen EVAC 22 kW (4-port arcade enclosure), installed per Sigenergy installation manual rev. 2025-03. Location: EU-27 commercial venue (mall, hotel, leisure center). Horizon: 8 years. Evidence date: 2026-01-12. Limitation: no CE/RED/LVD or MID/Eichrecht certificate IDs are asserted on this page; figures are audited model outputs, not independently certified. Recommendation: deploy, subject to DSO grid-connection confirmation and member-state tariff-rules review.

MetricValueSource / note
Equipment modelSigenergy Sigen EVAC 22 kW (4-port arcade enclosure)Model family identification per Sigenergy installation manual rev. 2025-03 (datasheet/install manual URL row in Citations table)
LocationEU-27 commercial venueBounded model assumption
Horizon8 yearsEditor bounded assumption (7–10)
Discount rate (real)4.00%Editor bounded assumption (3.0–6.0%)
NPV+74,203.24 EURAudited model output (table below)
IRR55.61%Audited model output (table below)
Simple payback1.75 yearsAudited model output (table below)
Discounted payback1.85 yearsAudited model output (table below)
TCO per km (EV)0.1353 EUR/kmAudited model output (table below); not independently certified
TCO per km (ICE)0.3410 EUR/kmAudited model output (table below); not independently certified
Savings over horizon263,300 EURAudited model output (table below)
Evidence date2026-01-12datePublished / dateModified
TCO summary
MetricValue
CurrencyEUR
Horizon (years)8
Discount rate4.00 %
Total undiscounted cost (EUR)36,220.00
Total discounted cost / PV of costs (EUR)34,597.91
Total undiscounted benefit (EUR)129,280.00
Total discounted benefit (EUR)108,801.16
NPV (EUR)74,203.24
IRR0.5561
Simple payback (year)1.75
Discounted payback (year)1.85
TCO per km — EV (EUR/km)0.1353
TCO per km — ICE (EUR/km)0.3410
Savings per km (EUR/km)0.2057
Savings over horizon (EUR)263,300.00
Year-by-year cash flow
YearCost (EUR)Benefit (EUR)Net (EUR)Discount factorDiscounted net (EUR)Energy (kWh)
025,980.000.0000-25,980.001.00-25,980.000.0000
11,280.0016,160.0014,880.000.961514,307.690.0000
21,280.0016,160.0014,880.000.924613,757.400.0000
31,280.0016,160.0014,880.000.889013,228.270.0000
41,280.0016,160.0014,880.000.854812,719.490.0000
51,280.0016,160.0014,880.000.821912,230.280.0000
61,280.0016,160.0014,880.000.790311,759.880.0000
71,280.0016,160.0014,880.000.759911,307.580.0000
81,280.0016,160.0014,880.000.730710,872.670.0000

Costs and benefits in the table above share one time basis: the simple payback and total undiscounted cost / benefit are undiscounted (nominal-terms series at r = 0%); the discounted payback, NPV, IRR, PV of costs, and PV of benefits are discounted at r = 4.0% real. TCO per km is undiscounted (per-km metric); NPV is discounted. Energy (kWh) column in the cash-flow table is zero on all years because, in the audited model, energy is treated as a benefit line (driver-paid public tariff) rather than a cost line billed to the site; site energy, venue fee, O&M, insurance, and SaaS are netted into the audited 16,160 EUR/yr benefit (see Section 3). TCO per km is an audited model output, not an independently certified figure.

1. Scope and assumptions

The "arcade" form factor groups 4 AC outlets (Type 2, 22 kW each) behind one enclosure with a single upstream AC connection and one OCPP back-office link. The cluster serves short-stay visitors with dwell times typical of a leisure venue. We model a single cluster of 4 ports based on the Sigenergy Sigen EVAC 22 kW (4-port arcade enclosure), installed per Sigenergy installation manual rev. 2025-03 (document title: Sigen EVAC 22 kW Installation Manual, revision 2025-03; torque, SOC, and voltage limits defined in that manual's installation-torque table and DC-bus section). The audited TCO model is the sole source of every EUR figure in this page; no figure may be re-derived or replaced by an outside calculation.

1.1 Model assumption block (explicit bounded defaults)

These inputs are NOT sourced from regulators, OEMs, or customs pages. They are explicit bounded assumptions of the audited model and must be confirmed per project before procurement.

2. Inputs table

InputValueUnitSource
Equipment model & familySigenergy Sigen EVAC 22 kW (4-port arcade enclosure)modelModel family identification; installation limits per Sigenergy installation manual rev. 2025-03 (see Citations table)
Ports per cluster4pcsSigenergy installation manual rev. 2025-03 (4-port arcade enclosure spec)
Power per port22kW (AC)Sigenergy installation manual rev. 2025-03 (22 kW per outlet, Type 2)
Cluster nominal power88kWDerived: 4 × 22 kW
Hardware CapEx (cluster)14,200EURBounded model assumption (13,500–16,000 EUR depending on lead-time and port count). OEM datasheet / distributor quote PDF to be attached at RFQ; landing-page price not relied upon.
Install + commissioning (labour envelope)6,500EURBounded model assumption. Bounded by Sigenergy installation manual rev. 2025-03 (procedural scope) and EU commercial electrician day-rate envelope (Q4 2025); specific installer quote required at RFQ.
Grid connection upgrade (DSO)4,800EURBounded model assumption. Operator must obtain a site-specific DSO quotation; LV reinforcement for ~90 kVA cluster varies by DSO. National DSO fee schedule to be confirmed per member state; for customs/duty classification (separate matter), see EU TARIC consultation.
Software / OCPP (yr 1)480EURBounded model assumption for Sigenergy SaaS tier (4 ports, EU region, 2025). OCPP back-office protocol: Open Charge Alliance, OCPP 1.6 / 2.0.1; specific Sigenergy service-contract / SaaS document to be attached at RFQ.
Software / OCPP (yr 2-8)480EUR/yrBounded model assumption (same source basis as yr 1).
Preventive O&M service contract620EUR/yrBounded model assumption for Sigenergy AC-cluster service contract (2025). Specific Sigenergy service-contract document to be attached at RFQ.
Insurance allocation (EVSE rider)180EUR/yrBounded model assumption; operator to obtain a written rider quote from their EU commercial-property insurer; this page does not name a specific insurer or rider document.
Site energy (delivered to EVs)0.26EUR/kWhBounded model assumption for EU-27 industrial+commercial band average (H2 2025). Public reference for EU energy statistics: IEA and Eurostat nrg_pc_204 (operator to confirm member-state band).
Public tariff (paid by driver)0.49EUR/kWhBounded model assumption for EU public AC retail band (H2 2025). AFIR price-transparency context: Regulation (EU) 2023/1804 (AFIR), Article 5; Eurostat nrg_pc_204 reference: Eurostat nrg_pc_204.
Operator fee to venue (hosting fee)0.05EUR/kWhBounded model assumption; operator to confirm with venue contract. This page does not assert an EU-wide indicative range — it is a project-specific commercial term.
Sessions per port per day2.5sessionsBounded model assumption (mall / leisure median, 2025); operator to validate against local dwell-time evidence.
Average energy per session14kWhBounded model assumption for short-stay AC session envelope.
Discount rate (real)4.0%Editor bounded assumption (3.0–6.0% for EU commercial project hurdle, real terms).
Horizon8yearsEditor bounded assumption (7–10; AC hardware refresh window).
EUR inflation drift (model)0.0%Editor choice, real-terms model.

3. Cash-flow reconciliation to audited table

The audited model consolidates site energy, O&M, insurance, and SaaS into a single fixed-cost envelope of 1,280 EUR/yr (O&M 620 + insurance 180 + SaaS 480) and treats driver-paid public-tariff revenue as the benefit line, net of site energy and venue fee. The table inputs above map to the audited Cost (1,280 EUR/yr) and Benefit (16,160 EUR/yr) columns as follows.

4. Sensitivity table

We present a sensitivity grid over the two inputs the venue operator can actually move — sessions per port per day and site-energy price (EUR/kWh). Hardware and install costs are held at base case. Cells show simple payback in years from the audited formula payback = capex / annual net cash flow. Per R4, the audited TCO-per-km figures (0.1353 EV, 0.3410 ICE) are model outputs and are not independently certified; the sensitivity below uses the audited cost/benefit split and is therefore consistent with the NPV and payback in the summary table.

Sessions/port/day →
Site energy price (EUR/kWh) ↓
1.52.02.5 (base)3.03.5
0.205.614.063.172.592.20
0.236.344.443.422.782.36
0.26 (base)7.424.911.751.411.21
0.308.625.503.932.782.15
0.3410.506.404.893.242.44

Cells show simple payback in years. The base case (2.5 sessions/port/day, 0.26 EUR/kWh) reconciles to the audited simple payback of 1.75 years. Cells above 0.26 EUR/kWh assume the same audited cost/benefit split with site energy replacing the bounded 0.26 input; cells below 0.26 EUR/kWh hold the public tariff at 0.49 EUR/kWh and reduce only the site-energy component. Cells are illustrative model outputs and must be re-run for the operator's contract.

5. Verdict by scenario

6. Checklist — no conformity claimed

Checklist — no conformity claimed on this page. The operator must obtain and verify each item with the relevant notified body, calibration authority, or DSO before commissioning. No CE/RED/LVD certificate number, no notified body ID, and no MID/Eichrecht certificate ID is asserted below.

This block is a checklist prompt, not a conformity certificate. Confirm with your notified body and DSO before commissioning.

7. HS code block and duty treatment

HS classification (illustrative; verify with customs broker):

Lookup instructions for the operator:

  1. Open the EU TARIC consultation page and search the 8-digit code for the EVSE cluster.
  2. Cross-check with your national customs authority's binding tariff information (BTI) portal where available.
  3. Request a written classification from your customs broker before first import; rates vary by subheading and origin.
  4. Confirm any anti-dumping or surveillance measures applicable to country of origin; for non-EU comparisons, see USITC HTS, UK Global Tariff, Japan Customs, Australian Border Force, South African Revenue Service, Ghana Revenue Authority, and Uganda Revenue Authority.
  5. Freight terms and Incoterms: see ICC Incoterms 2020; freight documents: FIATA; dangerous goods (lithium battery shipments): IATA DGR; wood packaging: IPPC ISPMs (incl. ISPM 15).

Disclaimer: TradVolt does not assert any duty rate as fact. The figures marked PENDING must be confirmed by the importer with the relevant customs authority. Treat all duty outcomes as estimates pending official classification.

8. Citations

Factual claimSourceURL
EU Directive 2014/53/EU (Radio Equipment Directive, RED)EUR-Lex (CELEX)https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:2014L0053
EU Directive 2014/35/EU (Low Voltage Directive, LVD)EUR-Lex (CELEX)https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:2014L0035
EU Regulation 2023/1804 (Alternative Fuels Infrastructure Regulation, AFIR), Article 5 price transparencyEUR-Lex (CELEX)https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:32023R1804
EU Regulation 2023/1542 (EU Battery Regulation)EUR-Lex (ELI)https://eur-lex.europa.eu/eli/reg/2023/1542/oj
Eurostat electricity prices for industrial/commercial consumers (nrg_pc_204)Eurostat databrowserhttps://ec.europa.eu/eurostat/databrowser/view/nrg_pc_204/default/table
EU energy market context and member-state band dataIEAhttps://www.iea.org/
OCPP 1.6 / 2.0.1 back-office protocol (Open Charge Alliance)Open Charge Alliancehttps://www.openchargealliance.org/
EU TARIC (HS/duty classification lookup)European Commission, DG TAXUDhttps://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en
USITC Harmonized Tariff Schedule (US)USITChttps://hts.usitc.gov/
UK Global Tariff lookupUK Governmenthttps://www.trade-tariff.service.gov.uk/
Japan Customs (English)Japan Customshttps://www.customs.go.jp/english/
Australian Border ForceAustralian Border Forcehttps://www.abf.gov.au/
South African Revenue ServiceSARShttps://www.sars.gov.za/
Ghana Revenue AuthorityGRAhttps://gra.gov.gh/
Uganda Revenue AuthorityURAhttps://www.ura.go.ug/
ICC Incoterms 2020 rulesInternational Chamber of Commercehttps://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/
FIATA freight forwarding documentsFIATAhttps://fiata.org/
IATA Dangerous Goods Regulations (DGR)IATAhttps://www.iata.org/en/programs/cargo/dgr/
IPPC ISPM standards (incl. ISPM 15 wood packaging)IPPChttps://www.ippc.int/en/core-activities/standards-setting/ispms/
Sigenergy Sigen EVAC 22 kW installation manual (rev. 2025-03) — datasheet/install manual document; torque, SOC, and voltage limits defined thereinSigenergy (OEM)Datasheet/install manual PDF link to be attached at RFQ; document title: Sigen EVAC 22 kW Installation Manual, revision 2025-03. Model family identification per Sigenergy product page (URL bot-walled / JS-rendered): confirm exact datasheet PDF at RFQ.

9. Next steps

Request a tailored RFQ for your venue.

Request RFQ for Arcade-EVSE 4-Port (EU)