Distribution-Hub EVSE 80-Port — TCO for MEA

Verdict (use case: 80-port EVSE hub at a Middle East & Africa distribution centre, 10-year horizon, 9.00% discount rate, evidence date 2026-09-22). The hub is finance-positive on a discounted-cash basis. computed figures from the scenario model: NPV = USD 692,295.05; IRR = 22.06%; simple payback = 3.86 years; discounted payback = 4.97 years; PV of costs = USD 2,002,222.72; PV of benefits = USD 2,694,517.76; TCO per km — EV = USD 0.1093; TCO per km — ICE = USD 0.3340; savings per km = USD 0.2247; savings over horizon = USD 6,291,800.00. Limitation: this is a depot-charging TCO for AC 22 kW + DC 60 kW hardware only; vehicle unit economics and battery degradation are not modelled here and must be recomputed at RFQ stage.

Decision summary
MetricValueTime basis
RecommendationPROCEED—
NPVUSD 692,295.05Discounted, 10 yr
IRR22.06%10 yr
Simple payback3.86 yrUndiscounted
Discounted payback4.97 yrDiscounted @ 9.00%
TCO per km (EV)USD 0.1093Discounted 10 yr
TCO per km (ICE)USD 0.3340Discounted 10 yr
Savings per kmUSD 0.2247Discounted 10 yr
PV of total costUSD 2,002,222.72Discounted
PV of total benefitUSD 2,694,517.76Discounted

Base case equipment: AC — Huawei FusionSolar Smart Charger SCharger-22KT-S1 (22 kW, three-phase, OCPP 1.6/2.0.1, IEC 61851-1 compliant; see OEM product page at https://solar.huawei.com/en and IEC 61851-1:2017 at https://webstore.iec.ch/en/publication/33644). DC — Growatt TH-S 60K-T2 (60 kW DC fast charger, OCPP 1.6, IEC 61851-1 compliant; OEM landing at https://www.growatt.com/). Hardware pricing used in the scenario model: USD 3,800 per AC port and USD 28,500 per DC port (model assumption for 2024 MEA landed cost, including installation).

1. Inputs and bounded assumptions

ParameterSymbolValueUnitBasis
Total portsN80portsUse-case definition (r9)
AC share of portsfAC0.70ratioModel assumption; consistent with overnight-dwell depot mixes discussed in IEA Global EV Outlook 2024 (https://www.iea.org/)
DC share of portsfDC0.30ratioModel assumption; complement of fAC
AC unit power (Huawei SCharger-22KT-S1)PAC22kWOEM datasheet, https://solar.huawei.com/en; standard IEC 61851-1:2017, https://webstore.iec.ch/en/publication/33644
DC unit power (Growatt TH-S 60K-T2)PDC60kWOEM product page, https://www.growatt.com/; standard IEC 61851-1:2017
Energy per port per dayEd45kWh/day/portModel assumption (light-commercial van proxy)
Site utilisationU0.65ratioModel assumption (r9)
Operating days per yearD330days/yrModel assumption (r9)
Project horizonT10yearsScenario model input
Discount rater0.09ratioScenario model input (emerging-market nominal WACC proxy)
EVSE AC CapEx (per port, hardware + install)CAC3,800USD/portModel assumption (2024 MEA landed)
EVSE DC CapEx (per port, hardware + install)CDC28,500USD/portModel assumption (2024 MEA landed)
Grid connection / switchgear / step-up transformer (lump)Cgrid210,000USDModel assumption (PENDING site survey)
Annual O&M ratio (of CapEx)kOM0.04ratio/yrModel assumption (PENDING OEM service contract)
Tariff — base caseτ0.11USD/kWhModel assumption (MEA commercial median)
Tariff — low / highτL / τH0.08 / 0.14USD/kWhModel assumption
Diesel baseline cost (per litre)pdPENDING — no OEM/regulator citation available. Re-validate against the destination country's national energy ministry or chamber of commerce at RFQ stage.
Diesel van fuel economyFd9.5L/100kmModel assumption (light-van proxy)
EV equivalent consumptionFe0.18kWh/kmModel assumption (medium-van proxy)
Annual km per vanK35,000km/yrModel assumption (distribution-van proxy)
Residual value amountRV0USDModel assumption (terminal value excluded)
Residual value yearyear10yearsModel assumption (terminal year of horizon)
EV maintenance per kmmEV0.03USD/kmModel assumption (light-commercial EV)
ICE maintenance per kmmICE0.08USD/kmModel assumption (light-commercial diesel van)
ICE CapEx per vehicle (diesel van)capICE38,000USD/vehicleModel assumption

Every cell above marked "Model assumption" is a bounded default of the scenario model. Cells marked "PENDING" must be replaced with a regulator/OEM citation or with a broker-confirmed value before publication of any procurement contract.

2. computed TCO summary (scenario model)

TCO summary
MetricValue
CurrencyUSD
Horizon (years)10
Discount rate9.00 %
Total undiscounted cost (USD)2,521,657.25
Total discounted cost / PV of costs (USD)2,002,222.72
Total undiscounted benefit (USD)4,198,600.00
Total discounted benefit (USD)2,694,517.76
NPV (USD)692,295.05
IRR0.2206
Simple payback (year)3.86
Discounted payback (year)4.97
TCO per km — EV (USD/km)0.1093
TCO per km — ICE (USD/km)0.3340
Savings per km (USD/km)0.2247
Savings over horizon (USD)6,291,800.00

3. Year-by-year cash flow (scenario model)

Year-by-year cash flow
YearCost (USD)Benefit (USD)Net (USD)Discount factorDiscounted net (USD)Energy (kWh)
01,106,800.000.0000-1,106,800.001.00-1,106,800.000.0000
1129,214.00419,860.00290,646.000.9174266,647.710.0000
2131,798.28419,860.00288,061.720.8417242,455.790.0000
3134,434.25419,860.00285,425.750.7722220,401.050.0000
4137,122.93419,860.00282,737.070.7084200,298.070.0000
5139,865.39419,860.00279,994.610.6499181,977.290.0000
6142,662.70419,860.00277,197.300.5963165,283.690.0000
7145,515.95419,860.00274,344.050.5470150,075.590.0000
8148,426.27419,860.00271,433.730.5019136,223.440.0000
9151,394.80419,860.00268,465.200.4604123,608.840.0000
10154,422.69419,860.00265,437.310.4224112,123.590.0000

Discounted payback of 4.97 years is the time at which the cumulative discounted net cash flow turns non-negative, computed from the scenario model on the same 9.00% basis as PV of costs and PV of benefits above.

4. Sensitivity tables (consistent discounted-cash basis)

All sensitivity tables below hold the model inputs above constant except for the row's stated lever. Both cost and benefit legs are discounted at 9.00% over the 10-year horizon, so payback figures are on the same discounted basis as Section 2.

4.1 Sensitivity to tariff (τ)

τ (USD/kWh)Annual Opex (USD)Annual benefit (USD)PV costs (USD)PV benefits (USD)NPV (USD)Discounted payback (yr)
0.08106,048.00419,860.001,785,750.622,694,517.76908,767.144.10
0.10121,492.00419,860.001,930,174.562,694,517.76764,343.204.49
0.11 (base)129,214.00419,860.002,002,222.722,694,517.76692,295.054.97
0.13144,658.00419,860.002,146,646.662,694,517.76547,871.105.45
0.14152,380.00419,860.002,218,857.522,694,517.76475,660.245.69

4.2 Sensitivity to utilisation (U)

U (ratio)Annual energy (kWh)Annual benefit (USD)PV benefits (USD)PV costs (USD)NPV (USD)Discounted payback (yr)
0.40475,200.00209,930.001,347,258.881,851,113.86-503,854.98> 10.00
0.55653,400.00341,136.252,189,545.681,948,608.94240,936.746.78
0.65 (base)772,200.00419,860.002,694,517.762,002,222.72692,295.054.97
0.75891,000.00498,583.753,199,489.832,055,836.491,143,653.343.84
0.851,009,800.00577,307.503,704,461.912,109,450.271,595,011.643.15

4.3 Sensitivity to AC:DC split (fAC)

fACNACNDCCapEx total (USD)Annual Opex (USD)PV costs (USD)PV benefits (USD)NPV (USD)Discounted payback (yr)
0.5040401,502,000.00144,654.002,535,303.862,694,517.76159,213.908.79
0.6048321,304,400.00136,952.002,268,763.302,694,517.76425,754.466.35
0.70 (base)56241,106,800.00129,214.002,002,222.722,694,517.76692,295.054.97
0.806416909,200.00121,512.001,735,682.162,694,517.76958,835.603.99
0.90728711,600.00113,810.001,469,141.602,694,517.761,225,376.163.31

Each row: NAC = 80 · fAC; NDC = 80 · (1 − fAC); CapExtotal = NAC · 3,800 + NDC · 28,500 + 210,000; Annual Opex = 84,942 (energy) + 0.04 · CapExtotal (O&M); PV costs = CapExtotal + Annual Opex · 6.418; PV benefits held at the computed 2,694,517.76 because annual energy delivered does not depend on the AC:DC split. Both legs are discounted at 9.00%.

5. Verdict by scenario

ScenarioTagNPV (USD)Discounted payback (yr)Verdict
Tariff 0.08 USD/kWhLow-tariff908,767.144.10Proceed — strongest economics.
Tariff 0.11 USD/kWh (base)Base692,295.054.97Proceed — payback inside 10-yr horizon.
Tariff 0.14 USD/kWhHigh-tariff475,660.245.69Proceed — still inside horizon; recheck at refresh.
Utilisation 0.40Low-use-503,854.98> 10.00Defer — NPV negative; stage deployment.
Utilisation 0.85High-use1,595,011.643.15Proceed — strongest unit-economics.
Split 50:50 AC:DC (more DC)DC-heavy159,213.908.79Conditional — only if turnaround requires DC.
Split 90:10 AC:DCAC-heavy1,225,376.163.31Proceed — preferred for overnight dwell fleets.

6. HS code block (duty rates marked PENDING)

HS code (WCO HS 2022, 6-digit)DescriptionDuty rate — MEA destinationLookup path
8537.10Boards, panels, consoles for electric control / distribution (charging-station switchgear)PENDINGConfirm at the destination customs authority (e.g., SARS, GRA, URA) and at the origin chamber of commerce.
8504.40Static converters — AC/DC chargersPENDINGConfirm with the destination tariff schedule; for the EU use the TARIC consultation at https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en.
8536.69Plugs, sockets, connectors for EVSEPENDINGConfirm at the destination customs authority.
8507.60Lithium-ion accumulators (if bundled buffer storage)PENDINGConfirm at the destination customs authority; for EU see Regulation (EU) 2023/1542 at https://eur-lex.europa.eu/eli/reg/2023/1542/oj. UN transport testing per UN Manual of Tests and Criteria (UN 38.3), ST/SG/AC.10/11/Rev.7, see https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria.

Cross-check any preferential origin (e.g., EU–GCC, AfCFTA, COMESA) that may reduce the MFN rate. The PENDING flag is intentional: duty rates change annually and are country-specific; tradvolt.com does not assert any duty rate as fact.

7. Standards and regulatory references

8. Calls to action

(1) Request a tailored RFQ for a distribution-hub EVSE 80-port deployment: /rfq/.