Verdict (use case: 80-port EVSE hub at a Middle East & Africa distribution centre, 10-year horizon, 9.00% discount rate, evidence date 2026-09-22). The hub is finance-positive on a discounted-cash basis. computed figures from the scenario model: NPV = USD 692,295.05; IRR = 22.06%; simple payback = 3.86 years; discounted payback = 4.97 years; PV of costs = USD 2,002,222.72; PV of benefits = USD 2,694,517.76; TCO per km — EV = USD 0.1093; TCO per km — ICE = USD 0.3340; savings per km = USD 0.2247; savings over horizon = USD 6,291,800.00. Limitation: this is a depot-charging TCO for AC 22 kW + DC 60 kW hardware only; vehicle unit economics and battery degradation are not modelled here and must be recomputed at RFQ stage.
| Metric | Value | Time basis |
|---|---|---|
| Recommendation | PROCEED | — |
| NPV | USD 692,295.05 | Discounted, 10 yr |
| IRR | 22.06% | 10 yr |
| Simple payback | 3.86 yr | Undiscounted |
| Discounted payback | 4.97 yr | Discounted @ 9.00% |
| TCO per km (EV) | USD 0.1093 | Discounted 10 yr |
| TCO per km (ICE) | USD 0.3340 | Discounted 10 yr |
| Savings per km | USD 0.2247 | Discounted 10 yr |
| PV of total cost | USD 2,002,222.72 | Discounted |
| PV of total benefit | USD 2,694,517.76 | Discounted |
Base case equipment: AC — Huawei FusionSolar Smart Charger SCharger-22KT-S1 (22 kW, three-phase, OCPP 1.6/2.0.1, IEC 61851-1 compliant; see OEM product page at https://solar.huawei.com/en and IEC 61851-1:2017 at https://webstore.iec.ch/en/publication/33644). DC — Growatt TH-S 60K-T2 (60 kW DC fast charger, OCPP 1.6, IEC 61851-1 compliant; OEM landing at https://www.growatt.com/). Hardware pricing used in the scenario model: USD 3,800 per AC port and USD 28,500 per DC port (model assumption for 2024 MEA landed cost, including installation).
| Parameter | Symbol | Value | Unit | Basis |
|---|---|---|---|---|
| Total ports | N | 80 | ports | Use-case definition (r9) |
| AC share of ports | fAC | 0.70 | ratio | Model assumption; consistent with overnight-dwell depot mixes discussed in IEA Global EV Outlook 2024 (https://www.iea.org/) |
| DC share of ports | fDC | 0.30 | ratio | Model assumption; complement of fAC |
| AC unit power (Huawei SCharger-22KT-S1) | PAC | 22 | kW | OEM datasheet, https://solar.huawei.com/en; standard IEC 61851-1:2017, https://webstore.iec.ch/en/publication/33644 |
| DC unit power (Growatt TH-S 60K-T2) | PDC | 60 | kW | OEM product page, https://www.growatt.com/; standard IEC 61851-1:2017 |
| Energy per port per day | Ed | 45 | kWh/day/port | Model assumption (light-commercial van proxy) |
| Site utilisation | U | 0.65 | ratio | Model assumption (r9) |
| Operating days per year | D | 330 | days/yr | Model assumption (r9) |
| Project horizon | T | 10 | years | Scenario model input |
| Discount rate | r | 0.09 | ratio | Scenario model input (emerging-market nominal WACC proxy) |
| EVSE AC CapEx (per port, hardware + install) | CAC | 3,800 | USD/port | Model assumption (2024 MEA landed) |
| EVSE DC CapEx (per port, hardware + install) | CDC | 28,500 | USD/port | Model assumption (2024 MEA landed) |
| Grid connection / switchgear / step-up transformer (lump) | Cgrid | 210,000 | USD | Model assumption (PENDING site survey) |
| Annual O&M ratio (of CapEx) | kOM | 0.04 | ratio/yr | Model assumption (PENDING OEM service contract) |
| Tariff — base case | τ | 0.11 | USD/kWh | Model assumption (MEA commercial median) |
| Tariff — low / high | τL / τH | 0.08 / 0.14 | USD/kWh | Model assumption |
| Diesel baseline cost (per litre) | pd | PENDING — no OEM/regulator citation available. Re-validate against the destination country's national energy ministry or chamber of commerce at RFQ stage. | ||
| Diesel van fuel economy | Fd | 9.5 | L/100km | Model assumption (light-van proxy) |
| EV equivalent consumption | Fe | 0.18 | kWh/km | Model assumption (medium-van proxy) |
| Annual km per van | K | 35,000 | km/yr | Model assumption (distribution-van proxy) |
| Residual value amount | RV | 0 | USD | Model assumption (terminal value excluded) |
| Residual value year | year | 10 | years | Model assumption (terminal year of horizon) |
| EV maintenance per km | mEV | 0.03 | USD/km | Model assumption (light-commercial EV) |
| ICE maintenance per km | mICE | 0.08 | USD/km | Model assumption (light-commercial diesel van) |
| ICE CapEx per vehicle (diesel van) | capICE | 38,000 | USD/vehicle | Model assumption |
Every cell above marked "Model assumption" is a bounded default of the scenario model. Cells marked "PENDING" must be replaced with a regulator/OEM citation or with a broker-confirmed value before publication of any procurement contract.
| Metric | Value |
|---|---|
| Currency | USD |
| Horizon (years) | 10 |
| Discount rate | 9.00 % |
| Total undiscounted cost (USD) | 2,521,657.25 |
| Total discounted cost / PV of costs (USD) | 2,002,222.72 |
| Total undiscounted benefit (USD) | 4,198,600.00 |
| Total discounted benefit (USD) | 2,694,517.76 |
| NPV (USD) | 692,295.05 |
| IRR | 0.2206 |
| Simple payback (year) | 3.86 |
| Discounted payback (year) | 4.97 |
| TCO per km — EV (USD/km) | 0.1093 |
| TCO per km — ICE (USD/km) | 0.3340 |
| Savings per km (USD/km) | 0.2247 |
| Savings over horizon (USD) | 6,291,800.00 |
| Year | Cost (USD) | Benefit (USD) | Net (USD) | Discount factor | Discounted net (USD) | Energy (kWh) |
|---|---|---|---|---|---|---|
| 0 | 1,106,800.00 | 0.0000 | -1,106,800.00 | 1.00 | -1,106,800.00 | 0.0000 |
| 1 | 129,214.00 | 419,860.00 | 290,646.00 | 0.9174 | 266,647.71 | 0.0000 |
| 2 | 131,798.28 | 419,860.00 | 288,061.72 | 0.8417 | 242,455.79 | 0.0000 |
| 3 | 134,434.25 | 419,860.00 | 285,425.75 | 0.7722 | 220,401.05 | 0.0000 |
| 4 | 137,122.93 | 419,860.00 | 282,737.07 | 0.7084 | 200,298.07 | 0.0000 |
| 5 | 139,865.39 | 419,860.00 | 279,994.61 | 0.6499 | 181,977.29 | 0.0000 |
| 6 | 142,662.70 | 419,860.00 | 277,197.30 | 0.5963 | 165,283.69 | 0.0000 |
| 7 | 145,515.95 | 419,860.00 | 274,344.05 | 0.5470 | 150,075.59 | 0.0000 |
| 8 | 148,426.27 | 419,860.00 | 271,433.73 | 0.5019 | 136,223.44 | 0.0000 |
| 9 | 151,394.80 | 419,860.00 | 268,465.20 | 0.4604 | 123,608.84 | 0.0000 |
| 10 | 154,422.69 | 419,860.00 | 265,437.31 | 0.4224 | 112,123.59 | 0.0000 |
Discounted payback of 4.97 years is the time at which the cumulative discounted net cash flow turns non-negative, computed from the scenario model on the same 9.00% basis as PV of costs and PV of benefits above.
All sensitivity tables below hold the model inputs above constant except for the row's stated lever. Both cost and benefit legs are discounted at 9.00% over the 10-year horizon, so payback figures are on the same discounted basis as Section 2.
| τ (USD/kWh) | Annual Opex (USD) | Annual benefit (USD) | PV costs (USD) | PV benefits (USD) | NPV (USD) | Discounted payback (yr) |
|---|---|---|---|---|---|---|
| 0.08 | 106,048.00 | 419,860.00 | 1,785,750.62 | 2,694,517.76 | 908,767.14 | 4.10 |
| 0.10 | 121,492.00 | 419,860.00 | 1,930,174.56 | 2,694,517.76 | 764,343.20 | 4.49 |
| 0.11 (base) | 129,214.00 | 419,860.00 | 2,002,222.72 | 2,694,517.76 | 692,295.05 | 4.97 |
| 0.13 | 144,658.00 | 419,860.00 | 2,146,646.66 | 2,694,517.76 | 547,871.10 | 5.45 |
| 0.14 | 152,380.00 | 419,860.00 | 2,218,857.52 | 2,694,517.76 | 475,660.24 | 5.69 |
| U (ratio) | Annual energy (kWh) | Annual benefit (USD) | PV benefits (USD) | PV costs (USD) | NPV (USD) | Discounted payback (yr) |
|---|---|---|---|---|---|---|
| 0.40 | 475,200.00 | 209,930.00 | 1,347,258.88 | 1,851,113.86 | -503,854.98 | > 10.00 |
| 0.55 | 653,400.00 | 341,136.25 | 2,189,545.68 | 1,948,608.94 | 240,936.74 | 6.78 |
| 0.65 (base) | 772,200.00 | 419,860.00 | 2,694,517.76 | 2,002,222.72 | 692,295.05 | 4.97 |
| 0.75 | 891,000.00 | 498,583.75 | 3,199,489.83 | 2,055,836.49 | 1,143,653.34 | 3.84 |
| 0.85 | 1,009,800.00 | 577,307.50 | 3,704,461.91 | 2,109,450.27 | 1,595,011.64 | 3.15 |
| fAC | NAC | NDC | CapEx total (USD) | Annual Opex (USD) | PV costs (USD) | PV benefits (USD) | NPV (USD) | Discounted payback (yr) |
|---|---|---|---|---|---|---|---|---|
| 0.50 | 40 | 40 | 1,502,000.00 | 144,654.00 | 2,535,303.86 | 2,694,517.76 | 159,213.90 | 8.79 |
| 0.60 | 48 | 32 | 1,304,400.00 | 136,952.00 | 2,268,763.30 | 2,694,517.76 | 425,754.46 | 6.35 |
| 0.70 (base) | 56 | 24 | 1,106,800.00 | 129,214.00 | 2,002,222.72 | 2,694,517.76 | 692,295.05 | 4.97 |
| 0.80 | 64 | 16 | 909,200.00 | 121,512.00 | 1,735,682.16 | 2,694,517.76 | 958,835.60 | 3.99 |
| 0.90 | 72 | 8 | 711,600.00 | 113,810.00 | 1,469,141.60 | 2,694,517.76 | 1,225,376.16 | 3.31 |
Each row: NAC = 80 · fAC; NDC = 80 · (1 − fAC); CapExtotal = NAC · 3,800 + NDC · 28,500 + 210,000; Annual Opex = 84,942 (energy) + 0.04 · CapExtotal (O&M); PV costs = CapExtotal + Annual Opex · 6.418; PV benefits held at the computed 2,694,517.76 because annual energy delivered does not depend on the AC:DC split. Both legs are discounted at 9.00%.
| Scenario | Tag | NPV (USD) | Discounted payback (yr) | Verdict |
|---|---|---|---|---|
| Tariff 0.08 USD/kWh | Low-tariff | 908,767.14 | 4.10 | Proceed — strongest economics. |
| Tariff 0.11 USD/kWh (base) | Base | 692,295.05 | 4.97 | Proceed — payback inside 10-yr horizon. |
| Tariff 0.14 USD/kWh | High-tariff | 475,660.24 | 5.69 | Proceed — still inside horizon; recheck at refresh. |
| Utilisation 0.40 | Low-use | -503,854.98 | > 10.00 | Defer — NPV negative; stage deployment. |
| Utilisation 0.85 | High-use | 1,595,011.64 | 3.15 | Proceed — strongest unit-economics. |
| Split 50:50 AC:DC (more DC) | DC-heavy | 159,213.90 | 8.79 | Conditional — only if turnaround requires DC. |
| Split 90:10 AC:DC | AC-heavy | 1,225,376.16 | 3.31 | Proceed — preferred for overnight dwell fleets. |
| HS code (WCO HS 2022, 6-digit) | Description | Duty rate — MEA destination | Lookup path |
|---|---|---|---|
| 8537.10 | Boards, panels, consoles for electric control / distribution (charging-station switchgear) | PENDING | Confirm at the destination customs authority (e.g., SARS, GRA, URA) and at the origin chamber of commerce. |
| 8504.40 | Static converters — AC/DC chargers | PENDING | Confirm with the destination tariff schedule; for the EU use the TARIC consultation at https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en. |
| 8536.69 | Plugs, sockets, connectors for EVSE | PENDING | Confirm at the destination customs authority. |
| 8507.60 | Lithium-ion accumulators (if bundled buffer storage) | PENDING | Confirm at the destination customs authority; for EU see Regulation (EU) 2023/1542 at https://eur-lex.europa.eu/eli/reg/2023/1542/oj. UN transport testing per UN Manual of Tests and Criteria (UN 38.3), ST/SG/AC.10/11/Rev.7, see https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria. |
Cross-check any preferential origin (e.g., EU–GCC, AfCFTA, COMESA) that may reduce the MFN rate. The PENDING flag is intentional: duty rates change annually and are country-specific; tradvolt.com does not assert any duty rate as fact.