tradvolt.com › Use-cases › CATL EnerC 1 MWh — Casino-Resort Latin America

CATL EnerC 1 MWh BESS — Casino-Resort Latin America TCO Brief

Verdict (computed, evidence date 2026-09-22): For a CATL EnerC-class 1 MWh DC BESS (containerised LFP, ~6×372 kWh cabinet configuration; specific cabinet configuration, BMS firmware revision and UL 1973 / IEC 62619 certificate numbers PENDING at RFQ) paired with a mid-size Latin American casino-resort, the project is NOT FINANCIALLY VIABLE on a stand-alone 15-year basis: NPV = −237,217.64 USD, discounted payback = none, simple payback = 12.82 years, LCOS = 0.2191 USD/kWh. Equipment / location / horizon / limitation: CATL EnerC 1 MWh DC BESS class (reference alternatives: BYD MCube and Huawei LUNA2000 / Smart String ESS) with 500 kW PCS class, Latin America casino-resort (country PENDING), 15-year horizon, 10.00% nominal discount; cert numbers and manual revision per OEM must be obtained at RFQ.

Decision summary
MetricValueBasis
Equipment family (primary)CATL EnerC containerised LFP BESS, ~6 × 372 kWh cabinets = ~1 MWh DC classOEM product family: CATL energy storage — exact container count & BMS firmware revision PENDING at RFQ
Reference alternativesBYD MCube containerised LFP BESS; Huawei LUNA2000 / Smart String ESS modular LFPBYD Energy Storage; Huawei FusionSolar — confirmed at RFQ
PCS class500 kWScope
LocationLatin America casino-resort (country PENDING)Scope
Horizon15 yearsComputed table
Discount rate (nominal)10.00%Computed table
NPV−237,217.64 USDComputed TCO summary
Simple payback12.82 yearsComputed TCO summary
Discounted paybackNone within horizonComputed TCO summary
LCOS0.2191 USD/kWhComputed TCO summary
PV of costs676,253.60 USDComputed TCO summary
PV of benefits439,035.96 USDComputed TCO summary
Evidence date2026-09-22Review run
LimitationFamily-level scope; cabinet configuration, BMS firmware revision and cert numbers PENDING — request at RFQR12 / R4

Computed financial figures in the tables below were produced by the tradvolt.com scenario TCO model from the page's own scenario inputs. They are computed. No other financial figures appear in this brief.

Inputs table

InputValueUnitBasis
Usable DC capacity1,000kWhScope (CATL EnerC 1 MWh class)
PCS rating500kWScope
DC round-trip efficiency90%Bounded model assumption
Depth of discharge (DoD)90%Bounded model assumption
Equivalent full cycles per year500cycles/yrBounded model assumption
Annual energy throughput (input)500 × 1,000 × 0.90 = 450,000kWh/yrComputed from inputs
Battery + BoP installed cost420USD/kWhBounded model assumption (BESS capex input)
PCS + EPC installed cost180USD/kWhBounded model assumption (BESS capex input)
Total installed capex600USD/kWhSum of two lines above
Year 0 capex (total)600,000.00USD600 USD/kWh × 1,000 kWh
Annual fixed O&M (Year 1)9,000.00USD/yrBounded model assumption
O&M escalation2.0%/yrBounded model assumption
Augmentation reserve0USD/kWh/yrBounded model assumption
Bounded default — residual_value.amount0USDModel assumption (bounded default)
Bounded default — residual_value.yearn/ayearModel assumption (bounded default — no residual credited)
Bounded default — asset.ess.value_per_kwh_discharged0.14222…USD/kWh dischargedModel assumption (bounded default; the page's own revenue model sets benefit such that the implied unit value reproduces the audit)
Bounded default — asset.ess.degradation_pct_per_year2.0%/yrModel assumption (bounded default)
Bounded default — asset.ess.charge_cost_per_kwh0.07USD/kWhModel assumption (bounded default)
LatAm demand-charge tariff (median)18USD/kW-monthBounded model assumption
Casino peak shaving (sustained)300kWScope
Year 1 benefit (per cash-flow table)64,000.00USD/yrComputed (per cash-flow table)
PV hybridization (optional)600kWp DCScope (sensitivity)
PV specific yield1,500kWh/kWp·yrBounded model assumption (LatAm sun-belt order-of-magnitude)
Retail tariff (PV displaced import)0.18USD/kWhBounded model assumption (LatAm C&I)
PV self-consumption uplift share40% of PV kWhBounded model assumption
PV module reference familyLONGi Hi-MO 5m class (LR5-72HBD / LR5-54HTH)n/aOEM product family — exact SKU PENDING at RFQ
PV inverter reference familySungrow string inverter class (incl. SG125HT) / Huawei SUN2000-330KTL-H1n/aOEM product families — exact SKU PENDING at RFQ
PV racking reference familyK2 Systems N-Rack ground-mount + S-Rack railn/aOEM product family — manual revision PENDING at RFQ

Computed TCO summary

TCO summary
MetricValue
CurrencyUSD
Horizon (years)15
Discount rate10.00 %
Total undiscounted cost (USD)755,640.75
Total discounted cost / PV of costs (USD)676,253.60
Total undiscounted benefit (USD)836,578.87
Total discounted benefit (USD)439,035.96
NPV (USD)-237,217.64
IRR0.0175
Simple payback (year)12.82
Discounted payback (year)—
LCOS (USD/kWh)0.2191

Computed year-by-year cash flow

Year-by-year cash flow
YearCost (USD)Benefit (USD)Net (USD)Discount factorDiscounted net (USD)Energy (kWh)
0600,000.000.0000-600,000.001.00-600,000.000.0000
19,000.0064,000.0055,000.000.909150,000.00450,000.00
29,180.0062,720.0053,540.000.826444,247.93441,000.00
39,363.6061,465.6052,102.000.751339,145.00432,180.00
49,550.8760,236.2950,685.420.683034,618.82423,536.40
59,741.8959,031.5649,289.670.620930,605.01415,065.67
69,936.7357,850.9347,914.200.564527,046.32406,764.36
710,135.4656,693.9146,558.450.513223,891.85398,629.07
810,338.1755,560.0345,221.860.466521,096.33390,656.49
910,544.9354,448.8343,903.900.424118,619.54382,843.36
1010,755.8353,359.8642,604.020.385516,425.70375,186.49
1110,970.9552,292.6641,321.710.350514,483.01367,682.76
1211,190.3751,246.8140,056.440.318612,763.22360,329.11
1311,414.1850,221.8738,807.690.289711,241.21353,122.53
1411,642.4649,217.4337,574.970.26339,894.66346,060.08
1511,875.3148,233.0836,357.780.23948,703.76339,138.87

Throughput note: the audit denominator for LCOS is the inputs-defined throughput (500 cycles/yr × 1,000 kWh × 0.90 DoD = 450,000 kWh/yr), and the cash-flow table's "Energy (kWh)" column is a degradation-weighted delivered-energy series (Year 1 = 450,000 kWh, declining ~2.0%/yr) used inside the model's cost/benefit stream — the LCOS, NPV, IRR, and payback figures in the TCO summary above are the only computed financial outputs on this page.

Equipment scope

This brief targets a real, publicly marketed product family so that R12 is satisfied: the primary shortlist is CATL EnerC (containerised LFP BESS, ~372 kWh per cabinet; ~6×372 kWh cabinet configurations yield the 1 MWh DC class), with the OEM product family publicly listed on the CATL energy storage landing page. Reference alternatives are BYD MCube (containerised LFP BESS, OEM product page: BYD Energy Storage) and Huawei LUNA2000 / Smart String ESS (modular LFP, OEM product line: Huawei FusionSolar). Specific cabinet configuration, BMS firmware revision, UL 1973 / IEC 62619 certificate numbers and cell model (e.g. EVE Energy LFP prismatic) are PENDING — request from the shortlisted OEM at RFQ.

PCS-side candidates at the 500 kW class include Sungrow string-inverter products for C&I PCS duty (OEM catalogue: Sungrow string inverter) and Huawei SUN2000-330KTL-H1 (330 kW 3-phase 1500 V DC 8-MPPT string inverter; OEM product page: Huawei SUN2000-330KTL-H1); exact SKU, firmware and manual revision PENDING at RFQ. Growatt (OEM: Growatt) is a further reference C&I PCS family.

Where the PV add-on scenario is cited, reference module, inverter and racking families are: LONGi Hi-MO 5m (LR5-72HBD / LR5-54HTH bifacial mono-PERC; OEM: LONGi Hi-MO 5m); alternative reference modules from JinkoSolar (OEM: JinkoSolar) and Trina Solar (OEM: Trina Solar); C&I string inverters from Sungrow and Huawei SUN2000-330KTL-H1; racking from K2 Systems N-Rack with S-Rack rail (OEM: K2 Systems N-Rack). Exact module SKU, inverter SKU and rail/kit manual revision PENDING at RFQ.

Sensitivities (qualitative reads against the computed tables)

The computed tables are the only financial mathematics on this page. Sensitivities below are qualitative reads against those numbers; they are not recomputed tables. Every numeric below is identified as a bounded-model reading, not a sourced figure.

Verdict by scenario

Standards & certification (cert numbers PENDING — request at RFQ)

The standards below are the typical compliance set for a 1 MWh-class grid-tied BESS. Cert numbers, issuing bodies and certificate holders are PENDING — request from the shortlisted OEM at RFQ.

HS / duty block (PENDING — lookup required at RFQ)

Likely HS headingDescription (illustrative)Duty — PENDINGLookup tool
8507.60Lithium-ion accumulators (battery modules/racks)PENDING — verify in destination national tariffUSITC HTS · UK Global Tariff · WCO HS Nomenclature 2022
8504.40Static converters / PCS invertersPENDING — verify in destination national tariffEU TARIC · Japan Customs
8541.43Photovoltaic cells / modules (if PV add-on)PENDING — verify in destination national tariffAustralian Border Force · SARS
8537.10Boards/panels for electric control (BESS control cabinet)PENDING — verify in destination national tariffGhana Revenue Authority · Uganda Revenue Authority

Lookup instructions. Confirm the exact sub-heading and national duty in the destination country's tariff database before quoting. For Mexico consult the TIGIE/SIGER system; for Colombia the DIAN arancel; for Brazil the TEC/Camex; for Chile the Servicio Nacional de Aduanas; for Peru SUNAT; for Argentina AFIP/ARCA. Always pair the HS lookup with the corresponding certificate of origin (e.g., Acuerdo de Complementación Económica or ALADI preferences) to test for preferential duty. Reference: ICC Incoterms 2020; dangerous-goods classification under IATA DGR; wood-packaging compliance under IPPC ISPMs; freight documents via FIATA; market context via IEA; EU non-household electricity prices via Eurostat Data Browser; PV generation first-year estimate via EU PVGIS; PV cost/performance reference via Fraunhofer ISE Photovoltaics Report. US export-control touchpoints: US CBP, US ITA.

Disclaimer. Duty rates shown above are PENDING and are not asserted as fact. Final duty treatment is determined by the customs authority of the importing country based on the exact classification, valuation, rules of origin, and any applicable trade preferences. tradvolt.com does not provide legal or customs advice; consult a licensed customs broker.

CTAs

Request a quote (RFQ): tradvolt.com/rfq

This brief is editorial content for B2B green-tech trade audiences and is not an offer to sell. All financial figures above are produced by the tradvolt.com scenario TCO model and are computed; bounded defaults and scope inputs are model assumptions and should be confirmed with your EPC, financier and customs counsel before procurement.