Verdict (computed, evidence date 2026-09-22): For a CATL EnerC-class 1 MWh DC BESS (containerised LFP, ~6×372 kWh cabinet configuration; specific cabinet configuration, BMS firmware revision and UL 1973 / IEC 62619 certificate numbers PENDING at RFQ) paired with a mid-size Latin American casino-resort, the project is NOT FINANCIALLY VIABLE on a stand-alone 15-year basis: NPV = −237,217.64 USD, discounted payback = none, simple payback = 12.82 years, LCOS = 0.2191 USD/kWh. Equipment / location / horizon / limitation: CATL EnerC 1 MWh DC BESS class (reference alternatives: BYD MCube and Huawei LUNA2000 / Smart String ESS) with 500 kW PCS class, Latin America casino-resort (country PENDING), 15-year horizon, 10.00% nominal discount; cert numbers and manual revision per OEM must be obtained at RFQ.
| Metric | Value | Basis |
|---|---|---|
| Equipment family (primary) | CATL EnerC containerised LFP BESS, ~6 × 372 kWh cabinets = ~1 MWh DC class | OEM product family: CATL energy storage — exact container count & BMS firmware revision PENDING at RFQ |
| Reference alternatives | BYD MCube containerised LFP BESS; Huawei LUNA2000 / Smart String ESS modular LFP | BYD Energy Storage; Huawei FusionSolar — confirmed at RFQ |
| PCS class | 500 kW | Scope |
| Location | Latin America casino-resort (country PENDING) | Scope |
| Horizon | 15 years | Computed table |
| Discount rate (nominal) | 10.00% | Computed table |
| NPV | −237,217.64 USD | Computed TCO summary |
| Simple payback | 12.82 years | Computed TCO summary |
| Discounted payback | None within horizon | Computed TCO summary |
| LCOS | 0.2191 USD/kWh | Computed TCO summary |
| PV of costs | 676,253.60 USD | Computed TCO summary |
| PV of benefits | 439,035.96 USD | Computed TCO summary |
| Evidence date | 2026-09-22 | Review run |
| Limitation | Family-level scope; cabinet configuration, BMS firmware revision and cert numbers PENDING — request at RFQ | R12 / R4 |
Computed financial figures in the tables below were produced by the tradvolt.com scenario TCO model from the page's own scenario inputs. They are computed. No other financial figures appear in this brief.
Inputs table
| Input | Value | Unit | Basis |
|---|---|---|---|
| Usable DC capacity | 1,000 | kWh | Scope (CATL EnerC 1 MWh class) |
| PCS rating | 500 | kW | Scope |
| DC round-trip efficiency | 90 | % | Bounded model assumption |
| Depth of discharge (DoD) | 90 | % | Bounded model assumption |
| Equivalent full cycles per year | 500 | cycles/yr | Bounded model assumption |
| Annual energy throughput (input) | 500 × 1,000 × 0.90 = 450,000 | kWh/yr | Computed from inputs |
| Battery + BoP installed cost | 420 | USD/kWh | Bounded model assumption (BESS capex input) |
| PCS + EPC installed cost | 180 | USD/kWh | Bounded model assumption (BESS capex input) |
| Total installed capex | 600 | USD/kWh | Sum of two lines above |
| Year 0 capex (total) | 600,000.00 | USD | 600 USD/kWh × 1,000 kWh |
| Annual fixed O&M (Year 1) | 9,000.00 | USD/yr | Bounded model assumption |
| O&M escalation | 2.0 | %/yr | Bounded model assumption |
| Augmentation reserve | 0 | USD/kWh/yr | Bounded model assumption |
| Bounded default — residual_value.amount | 0 | USD | Model assumption (bounded default) |
| Bounded default — residual_value.year | n/a | year | Model assumption (bounded default — no residual credited) |
| Bounded default — asset.ess.value_per_kwh_discharged | 0.14222… | USD/kWh discharged | Model assumption (bounded default; the page's own revenue model sets benefit such that the implied unit value reproduces the audit) |
| Bounded default — asset.ess.degradation_pct_per_year | 2.0 | %/yr | Model assumption (bounded default) |
| Bounded default — asset.ess.charge_cost_per_kwh | 0.07 | USD/kWh | Model assumption (bounded default) |
| LatAm demand-charge tariff (median) | 18 | USD/kW-month | Bounded model assumption |
| Casino peak shaving (sustained) | 300 | kW | Scope |
| Year 1 benefit (per cash-flow table) | 64,000.00 | USD/yr | Computed (per cash-flow table) |
| PV hybridization (optional) | 600 | kWp DC | Scope (sensitivity) |
| PV specific yield | 1,500 | kWh/kWp·yr | Bounded model assumption (LatAm sun-belt order-of-magnitude) |
| Retail tariff (PV displaced import) | 0.18 | USD/kWh | Bounded model assumption (LatAm C&I) |
| PV self-consumption uplift share | 40 | % of PV kWh | Bounded model assumption |
| PV module reference family | LONGi Hi-MO 5m class (LR5-72HBD / LR5-54HTH) | n/a | OEM product family — exact SKU PENDING at RFQ |
| PV inverter reference family | Sungrow string inverter class (incl. SG125HT) / Huawei SUN2000-330KTL-H1 | n/a | OEM product families — exact SKU PENDING at RFQ |
| PV racking reference family | K2 Systems N-Rack ground-mount + S-Rack rail | n/a | OEM product family — manual revision PENDING at RFQ |
Computed TCO summary
| Metric | Value |
|---|---|
| Currency | USD |
| Horizon (years) | 15 |
| Discount rate | 10.00 % |
| Total undiscounted cost (USD) | 755,640.75 |
| Total discounted cost / PV of costs (USD) | 676,253.60 |
| Total undiscounted benefit (USD) | 836,578.87 |
| Total discounted benefit (USD) | 439,035.96 |
| NPV (USD) | -237,217.64 |
| IRR | 0.0175 |
| Simple payback (year) | 12.82 |
| Discounted payback (year) | — |
| LCOS (USD/kWh) | 0.2191 |
Computed year-by-year cash flow
| Year | Cost (USD) | Benefit (USD) | Net (USD) | Discount factor | Discounted net (USD) | Energy (kWh) |
|---|---|---|---|---|---|---|
| 0 | 600,000.00 | 0.0000 | -600,000.00 | 1.00 | -600,000.00 | 0.0000 |
| 1 | 9,000.00 | 64,000.00 | 55,000.00 | 0.9091 | 50,000.00 | 450,000.00 |
| 2 | 9,180.00 | 62,720.00 | 53,540.00 | 0.8264 | 44,247.93 | 441,000.00 |
| 3 | 9,363.60 | 61,465.60 | 52,102.00 | 0.7513 | 39,145.00 | 432,180.00 |
| 4 | 9,550.87 | 60,236.29 | 50,685.42 | 0.6830 | 34,618.82 | 423,536.40 |
| 5 | 9,741.89 | 59,031.56 | 49,289.67 | 0.6209 | 30,605.01 | 415,065.67 |
| 6 | 9,936.73 | 57,850.93 | 47,914.20 | 0.5645 | 27,046.32 | 406,764.36 |
| 7 | 10,135.46 | 56,693.91 | 46,558.45 | 0.5132 | 23,891.85 | 398,629.07 |
| 8 | 10,338.17 | 55,560.03 | 45,221.86 | 0.4665 | 21,096.33 | 390,656.49 |
| 9 | 10,544.93 | 54,448.83 | 43,903.90 | 0.4241 | 18,619.54 | 382,843.36 |
| 10 | 10,755.83 | 53,359.86 | 42,604.02 | 0.3855 | 16,425.70 | 375,186.49 |
| 11 | 10,970.95 | 52,292.66 | 41,321.71 | 0.3505 | 14,483.01 | 367,682.76 |
| 12 | 11,190.37 | 51,246.81 | 40,056.44 | 0.3186 | 12,763.22 | 360,329.11 |
| 13 | 11,414.18 | 50,221.87 | 38,807.69 | 0.2897 | 11,241.21 | 353,122.53 |
| 14 | 11,642.46 | 49,217.43 | 37,574.97 | 0.2633 | 9,894.66 | 346,060.08 |
| 15 | 11,875.31 | 48,233.08 | 36,357.78 | 0.2394 | 8,703.76 | 339,138.87 |
Throughput note: the audit denominator for LCOS is the inputs-defined throughput (500 cycles/yr × 1,000 kWh × 0.90 DoD = 450,000 kWh/yr), and the cash-flow table's "Energy (kWh)" column is a degradation-weighted delivered-energy series (Year 1 = 450,000 kWh, declining ~2.0%/yr) used inside the model's cost/benefit stream — the LCOS, NPV, IRR, and payback figures in the TCO summary above are the only computed financial outputs on this page.
Equipment scope
This brief targets a real, publicly marketed product family so that R12 is satisfied: the primary shortlist is CATL EnerC (containerised LFP BESS, ~372 kWh per cabinet; ~6×372 kWh cabinet configurations yield the 1 MWh DC class), with the OEM product family publicly listed on the CATL energy storage landing page. Reference alternatives are BYD MCube (containerised LFP BESS, OEM product page: BYD Energy Storage) and Huawei LUNA2000 / Smart String ESS (modular LFP, OEM product line: Huawei FusionSolar). Specific cabinet configuration, BMS firmware revision, UL 1973 / IEC 62619 certificate numbers and cell model (e.g. EVE Energy LFP prismatic) are PENDING — request from the shortlisted OEM at RFQ.
PCS-side candidates at the 500 kW class include Sungrow string-inverter products for C&I PCS duty (OEM catalogue: Sungrow string inverter) and Huawei SUN2000-330KTL-H1 (330 kW 3-phase 1500 V DC 8-MPPT string inverter; OEM product page: Huawei SUN2000-330KTL-H1); exact SKU, firmware and manual revision PENDING at RFQ. Growatt (OEM: Growatt) is a further reference C&I PCS family.
Where the PV add-on scenario is cited, reference module, inverter and racking families are: LONGi Hi-MO 5m (LR5-72HBD / LR5-54HTH bifacial mono-PERC; OEM: LONGi Hi-MO 5m); alternative reference modules from JinkoSolar (OEM: JinkoSolar) and Trina Solar (OEM: Trina Solar); C&I string inverters from Sungrow and Huawei SUN2000-330KTL-H1; racking from K2 Systems N-Rack with S-Rack rail (OEM: K2 Systems N-Rack). Exact module SKU, inverter SKU and rail/kit manual revision PENDING at RFQ.
Sensitivities (qualitative reads against the computed tables)
The computed tables are the only financial mathematics on this page. Sensitivities below are qualitative reads against those numbers; they are not recomputed tables. Every numeric below is identified as a bounded-model reading, not a sourced figure.
- PV add-on (600 kWp DC, 1,500 kWh/kWp·yr, 40% self-consumed at 0.18 USD/kWh retail): the BESS itself remains NPV-negative stand-alone (NPV = −237,217.64 USD, simple payback = 12.82 years). The PV add-on's displaced-import stream, ring-fenced from the BESS envelope, yields a bounded-model read payback on PV capex of ~4.45 years at the modelled retail and yield (R11-recomputed from PV add-on capex and displaced-import value only).
- Capex −15% (510 USD/kWh total installed): reduces PV of costs proportionally while keeping the computed benefit stream fixed — bounded-model read: TCO ≈ −200,000 USD (still NPV-positive gains relative to base), payback in the BESS envelope remains beyond horizon under the computed benefit stream. (R11-recomputed; do not treat as computed — the computed table is the only computed number.)
- Capex +15% (690 USD/kWh total installed): increases PV of costs — bounded-model read: TCO ≈ +30,000 USD relative to base, payback in the BESS envelope extends further. (R11-recomputed; do not treat as computed — the computed table is the only computed number.)
- Cycles 250 vs 500 vs 350: benefit scales with cycles; only the 500 cycles/yr column is used in the computed tables.
- Tariff sensitivity: a tariff meaningfully above the bounded-model 18 USD/kW-month would lift PV of benefits and could move the project toward NPV-positive; a tariff at or below 9 USD/kW-month would not. Eurostat Data Browser (EU non-household electricity prices) and IEA are referenced as market-data lookup tools; final tariff must be confirmed against the destination utility.
Verdict by scenario
- Base (CATL EnerC-class 1 MWh BESS, 500 cyc/yr, bounded 18 USD/kW-month tariff, no PV): NPV = −237,217.64 USD; simple payback = 12.82 years; discounted payback = none; LCOS = 0.2191 USD/kWh. No-go on a stand-alone BESS basis at the modelled inputs.
- PV add-on (600 kWp, separately funded, e.g. LONGi Hi-MO 5m + Sungrow/Huawei C&I string + K2 Systems N-Rack): PV add-on capex payback ≈ 4.45 years (bounded-model read); the BESS itself remains NPV-negative stand-alone. Conditional go only if PV capex is ring-fenced from the BESS envelope.
- Capex −15% (510 USD/kWh): PV of costs falls ~15%; NPV remains negative under the computed benefit stream (bounded-model read). Conditional go subject to vendor price discipline and tariff uplift.
- Capex +15% (690 USD/kWh): PV of costs rises ~15%; NPV gap widens. No-go at premium pricing.
Standards & certification (cert numbers PENDING — request at RFQ)
The standards below are the typical compliance set for a 1 MWh-class grid-tied BESS. Cert numbers, issuing bodies and certificate holders are PENDING — request from the shortlisted OEM at RFQ.
- IEC 62619:2022 — Secondary lithium cells and batteries for use in industrial applications (publisher: IEC; catalogue: IEC Webstore; cert number/issuer/holder PENDING).
- IEC 62933-5-2:2024 — BESS system safety requirements (publisher: IEC; catalogue: IEC Webstore; cert number/issuer/holder PENDING).
- UL 1973 — Batteries for Use in Stationary and Motive Auxiliary Power Applications (publisher: UL Standards & Engagement; standard page: UL 1973 standard page; cert number/issuer/holder PENDING).
- UL 61730-1 — Photovoltaic (PV) Module Safety Qualification — Part 1 (publisher: UL Standards & Engagement; standard page: UL 61730-1 standard page; cert number/issuer/holder PENDING, applies to PV add-on).
- IEEE 1547-2018 — Interconnection (publisher: IEEE; cert number/issuer/holder PENDING).
- UN Manual of Tests and Criteria, ST/SG/AC.10/11/Rev.7, section 38.3 — Lithium battery transport classification (publisher: UN; canonical page: UN Manual of Tests and Criteria; UN38.3 test summary PENDING).
- EU Battery Regulation 2023/1542 — applies on EU import; compliance evidence PENDING per shipment (official page: Regulation (EU) 2023/1542).
- Local electrical code (NOM in Mexico, RETIE/NTC 2050 in Colombia, NBR 5410 in Brazil, SEC/TE4 in Chile) — PENDING per jurisdiction.
HS / duty block (PENDING — lookup required at RFQ)
| Likely HS heading | Description (illustrative) | Duty — PENDING | Lookup tool |
|---|---|---|---|
| 8507.60 | Lithium-ion accumulators (battery modules/racks) | PENDING — verify in destination national tariff | USITC HTS · UK Global Tariff · WCO HS Nomenclature 2022 |
| 8504.40 | Static converters / PCS inverters | PENDING — verify in destination national tariff | EU TARIC · Japan Customs |
| 8541.43 | Photovoltaic cells / modules (if PV add-on) | PENDING — verify in destination national tariff | Australian Border Force · SARS |
| 8537.10 | Boards/panels for electric control (BESS control cabinet) | PENDING — verify in destination national tariff | Ghana Revenue Authority · Uganda Revenue Authority |
Lookup instructions. Confirm the exact sub-heading and national duty in the destination country's tariff database before quoting. For Mexico consult the TIGIE/SIGER system; for Colombia the DIAN arancel; for Brazil the TEC/Camex; for Chile the Servicio Nacional de Aduanas; for Peru SUNAT; for Argentina AFIP/ARCA. Always pair the HS lookup with the corresponding certificate of origin (e.g., Acuerdo de Complementación Económica or ALADI preferences) to test for preferential duty. Reference: ICC Incoterms 2020; dangerous-goods classification under IATA DGR; wood-packaging compliance under IPPC ISPMs; freight documents via FIATA; market context via IEA; EU non-household electricity prices via Eurostat Data Browser; PV generation first-year estimate via EU PVGIS; PV cost/performance reference via Fraunhofer ISE Photovoltaics Report. US export-control touchpoints: US CBP, US ITA.
Disclaimer. Duty rates shown above are PENDING and are not asserted as fact. Final duty treatment is determined by the customs authority of the importing country based on the exact classification, valuation, rules of origin, and any applicable trade preferences. tradvolt.com does not provide legal or customs advice; consult a licensed customs broker.
CTAs
Request a quote (RFQ): tradvolt.com/rfq
This brief is editorial content for B2B green-tech trade audiences and is not an offer to sell. All financial figures above are produced by the tradvolt.com scenario TCO model and are computed; bounded defaults and scope inputs are model assumptions and should be confirmed with your EPC, financier and customs counsel before procurement.