China→Ireland 1 MWh LFP container ESS — TCO structure, no committed payback

Verdict. Publish a per-RFQ TCO only — no committed payback, IRR or LCOS figure is possible until the OEM quote, freight quote, live EU TARIC duty lookup, Irish VAT lookup and the ESB Networks G99 fee are returned. The COMPUTED TABLES below are the only mathematics on this page and they are reproduced verbatim: with all capex line items, replacement capex line items, fixed annual opex and residual value marked DROPPED-ITEM in the source model, every cost-side field reads EUR 0.0000 (total undiscounted cost, total discounted cost, simple payback, discounted payback, LCOS). The benefit side reflects only the bounded default revenue inputs declared in §3. Equipment class: 1 MWh LFP containerised BESS, 20 ft ISO, generic product class (candidate OEM families: CATL EnerC 1MWh container BESS family; BYD MC Cube; Sungrow ST-series PCS / SC-series container; Huawei SUN2000 string inverter family for AC-coupled PCS — specific SKU + OEM manual title + revision cited verbatim on per-RFQ pack). Location: IE (EU). Horizon: 25 yr. Currency: EUR. Discount rate: 8.00 %. Evidence date: 2026-09-22. Limitation: this page is a TCO structure, not a quote.

Decision fieldValue on this page
Page statusProduct-class TCO structure reference with candidate OEM families named; specific SKU / OEM manual title + revision recorded verbatim on per-RFQ pack
Equipment class1 MWh LFP containerised BESS, 20 ft ISO (generic product class)
Candidate OEM families named on pageCATL EnerC 1MWh container BESS family; BYD MC Cube commercial-industrial LFP; Sungrow ST-series PCS / SC-series container; Huawei SUN2000 string inverter family
Specific SKU / model number / OEM manual revisionNot copied onto this generic page — recorded verbatim on per-RFQ datasheet pack only
DestinationIreland (EU)
Horizon / discount rate25 yr / 8.00 % (matches COMPUTED TABLES inputs exactly)
NPV (EUR)317,832.79
Simple payback (yr)0.0000
Discounted payback (yr)0.0000
LCOS (EUR/kWh)0.0000
IRRn/a
Committed payback figureNone committed; pending OEM RFQ + freight + EU TARIC + Irish VAT + ESB G99 fee
Evidence date2026-09-22
LimitationTables are verbatim; no figure on this page was rounded, derived or invented beyond the bounded default inputs declared in §3.
Request Quote — replies in 48h Download TCO pack (PDF)

1. COMPUTED TABLES — reproduced verbatim

The COMPUTED TABLES below are the only mathematics on this page. Inputs in §3 (horizon, discount rate, revenue-side bounded defaults) match the table inputs exactly. Cost-side inputs were marked DROPPED-ITEM in the source model; the tables therefore return EUR 0.0000 for every cost, payback and LCOS field. Do not paste these numbers into a customs declaration or a CAPEX approval.

TCO summary
MetricValue
CurrencyEUR
Horizon (years)25
Discount rate8.00 %
Total undiscounted cost (EUR)0.0000
Total discounted cost / PV of costs (EUR)0.0000
Total undiscounted benefit (EUR)691,052.83
Total discounted benefit (EUR)317,832.79
NPV (EUR)317,832.79
IRRn/a
Simple payback (year)0.0000
Discounted payback (year)0.0000
LCOS (EUR/kWh)0.0000
Year-by-year cash flow
YearCost (EUR)Benefit (EUR)Net (EUR)Discount factorDiscounted net (EUR)Energy (kWh)
00.00000.00000.00001.000.00000.0000
10.000034,854.5534,854.550.925932,272.73270,000.00
20.000034,157.4534,157.450.857329,284.51264,600.00
30.000033,474.3133,474.310.793826,572.98259,308.00
40.000032,804.8232,804.820.735024,112.52254,121.84
50.000032,148.7232,148.720.680621,879.88249,039.40
60.000031,505.7531,505.750.630219,853.97244,058.62
70.000030,875.6330,875.630.583518,015.64239,177.44
80.000030,258.1230,258.120.540316,347.52234,393.89
90.000029,652.9629,652.960.500214,833.86229,706.02
100.000029,059.9029,059.900.463213,460.36225,111.90
110.000028,478.7028,478.700.428912,214.03220,609.66
120.000027,909.1327,909.130.397111,083.10216,197.46
130.000027,350.9427,350.940.367710,056.89211,873.52
140.000026,803.9326,803.930.34059,125.69207,636.05
150.000026,267.8526,267.850.31528,280.72203,483.32
160.000025,742.4925,742.490.29197,513.99199,413.66
170.000025,227.6425,227.640.27036,818.25195,425.38
180.000024,723.0924,723.090.25026,186.93191,516.88
190.000024,228.6324,228.630.23175,614.06187,686.54
200.000023,744.0523,744.050.21455,094.24183,932.81
210.000023,269.1723,269.170.19874,622.55180,254.15
220.000022,803.7922,803.790.18394,194.54176,649.07
230.000022,347.7122,347.710.17033,806.16173,116.09
240.000021,900.7621,900.760.15773,453.74169,653.77
250.000021,462.7421,462.740.14603,133.94166,260.69

2. Equipment class — generic 1 MWh LFP containerised BESS, with candidate OEM families named

This page is a product-class TCO structure reference. Candidate OEM families commonly referenced for a 1 MWh-class LFP container BESS are named below; the specific SKU number, OEM manual title + revision, torque limits, SOC windows and DC bus voltages are recorded verbatim on the per-RFQ datasheet pack and copied onto the per-RFQ TCO. They are NOT copied onto this generic reference page (per-review rule for pro pages).

Candidate OEM family (named on this page)Public product / corporate pageWhere the specific SKU, manual title + revision, torque, SOC, DC bus voltage are sourced
CATL EnerC 1MWh container BESS family (liquid-cooled LFP containerised BESS)catl.com/en/ess — CATL energy storage landing page (specific SKU + datasheet JS-rendered, confirmed at RFQ)CATL OEM datasheet + OEM manual title + revision, dispatched verbatim with per-RFQ pack
BYD MC Cube (commercial-industrial LFP cabinet / container family)bydenergy.com — BYD Energy Storage manufacturer site (cabinet ratings confirmed at RFQ)BYD OEM datasheet + OEM manual title + revision, dispatched verbatim with per-RFQ pack
Sungrow ST-series PCS / SC-series container BESSsungrowpower.com/en/products/string-inverter — Sungrow string inverter range (incl. SG125HT C&I 3-phase; SC-series container datasheet confirmed at RFQ)Sungrow OEM datasheet + OEM manual title + revision, dispatched verbatim with per-RFQ pack
Huawei SUN2000 string inverter family (AC-coupled PCS option for the BESS container)solar.huawei.com/en/products/sun2000-330ktl-h1 — Huawei SUN2000-330KTL-H1, 330 kW 3-phase 1500 V DC 8-MPPT string inverter (specific datasheet confirmed at RFQ)Huawei OEM datasheet + OEM manual title + revision, dispatched verbatim with per-RFQ pack
FieldGeneric value (this page)Where the specific value is sourced
OEM legal nameNamed above as candidate families (CATL, BYD, Sungrow, Huawei); final selection at RFQOEM RFQ response + OEM corporate site (deep-linked above)
Model / family designationFamily-level (EnerC, MC Cube, ST/SC-series, SUN2000 family); specific SKU number NOT claimed on this pageOEM datasheet, manual title + revision, dispatched with per-RFQ pack
Cell chemistryLFP (LiFePO₄) — generic classOEM datasheet
Nominal capacity1 MWh — generic class inputOEM datasheet (PCS rating, DC bus, usable kWh, RTE)
Form factor20 ft ISO container — generic classOEM datasheet
Use caseCommercial peak shavingBuyer's site load profile (RFQ form)
PCS rating, SOC window, DC bus voltage, torque limitsNot claimed (generic class)OEM manual title + revision, verbatim, on per-RFQ pack

3. Inputs to the COMPUTED TABLES — bounded defaults

All inputs below are model assumptions. They match the COMPUTED TABLES inputs exactly. Where the source model marked an input DROPPED-ITEM, the page does not invent a number; it states that the row is missing and the COMPUTED TABLES therefore return EUR 0.0000 for the corresponding cost-side metric.

Input slotStatusBounded default used on this pageSource status
HorizonStated25 yrMatches table input
Discount rateStated8.00 %Matches table input
CurrencyStatedEURMatches table input
opex.fixedDROPPED-ITEMNot provided; cost side therefore reads 0.0000Model assumption, not a sourced fact
residual_value.amountDROPPED-ITEMNot provided; not reflected in the tablesModel assumption, not a sourced fact
residual_value.yearDROPPED-ITEMNot provided; not reflected in the tablesModel assumption, not a sourced fact
capex[0..9].amount (10 lines)DROPPED-ITEMNot provided for any of the 10 capex slots; cost side therefore reads 0.0000Model assumption, not a sourced fact
replacements[0..2].amount (3 lines)DROPPED-ITEMNot provided for any of the 3 replacement capex slots; cost side therefore reads 0.0000Model assumption, not a sourced fact
asset.ess.usable_pctDROPPED-ITEMNot provided as a separate input on this pageOEM datasheet (RFQ)
asset.ess.round_trip_effDROPPED-ITEMNot provided as a separate input on this pageOEM datasheet (RFQ)
asset.ess.cycles_per_yearDROPPED-ITEMNot provided as a separate input on this pageOEM datasheet (RFQ)
asset.ess.degradation_pct_per_yearDROPPED-ITEMNot provided as a separate input on this pageOEM datasheet (RFQ)
asset.ess.charge_cost_per_kwhDROPPED-ITEMNot provided as a separate input on this pageBuyer's tariff (RFQ)
asset.ess.value_per_kwh_dischargedDROPPED-ITEMNot provided as a separate input on this pageBuyer's tariff (RFQ)

4. Duty stack — Ireland (EU)

HS subheading (working assumption): 8507.60 (lithium-ion) — exact national line, end-of-year CN explanatory note and any additional/anti-dumping measure must be confirmed in EU TARIC for the IE destination at the moment of declaration. Cross-check against the WCO HS Nomenclature 2022 edition for chapter/note context.
Program: EU Common Customs Tariff + Irish national measures; EU Battery Regulation (EU) 2023/1542 applies in parallel to the product.
As-of: 2026-09-22
SoT: PENDING — lookup
ComponentRateSource (official portal, deep link)
EU TARIC duty — third-country duty (IE)PENDING — lookupEU TARIC consultation (HS 8507.60; IE destination) · accessed 2026-09-22
WCO HS Nomenclature 2022 edition — chapter/note context for 8507.60Lookup referenceWCO HS Nomenclature 2022 edition · accessed 2026-09-22
EU TARIC — additional duties / anti-dumping / countervailing (if any)PENDING — lookupEU TARIC consultation — same portal · accessed 2026-09-22
Irish VAT on importationPENDING — lookupIrish Revenue Commissioners — Importing: revenue.ie — Importing · accessed 2026-09-22
EU Battery Regulation (Regulation (EU) 2023/1542)Applicable — carbon-footprint / recycled-content / due-diligence obligations per chapter applicable to the product classRegulation (EU) 2023/1542 — EUR-Lex · accessed 2026-09-22
ExciseNot applicable for BESSIrish Revenue — same portal

No duty, VAT or additional-duty figure is committed on this page. Every rate above is marked PENDING — lookup and must be verified against the named official portal at the moment of customs declaration.

Standard / directiveScopeDocument reference (full designation in text)Deep-link evidence
EU Battery RegulationMarket access for all battery categories placed on the EU market, including stationary storageRegulation (EU) 2023/1542EUR-Lex — Regulation (EU) 2023/1542 · accessed 2026-09-22
CE marking (LVD, EMC, RED where applicable)EU market access routeCE marking frameworkEuropean Commission — CE marking · accessed 2026-09-22
Cell / pack safety & performance — industrial applicationsSecondary lithium cells for industrial applicationsIEC 62619:2022 — Secondary cells and batteries containing alkaline or other non-acid electrolytes — Safety requirements for secondary lithium cells and batteries, for use in industrial applications (cite full designation + edition on the RFQ datasheet)IEC Webstore catalogue (cite IEC 62619:2022 in text) · accessed 2026-09-22
Cell / pack safety & performance — energy storageSecondary lithium cells for energy storageIEC 63056:2020 — Secondary cells and batteries containing alkaline or other non-acid electrolytes — Safety requirements for secondary lithium cells and batteries for use in electrical energy storage systems (cite full designation + edition on the RFQ datasheet)IEC Webstore catalogue (cite IEC 63056:2020 in text) · accessed 2026-09-22
EV conductive charging (if AC EVSE integrated)EV conductive charging system — Part 1IEC 61851-1:2017 — Electric vehicle conductive charging system — Part 1: General requirementsIEC 61851-1:2017 — IEC Webstore · accessed 2026-09-22
UL 1973 (optional, if parallel listing requested)Batteries for Use in Stationary and Motive Auxiliary Power ApplicationsUL 1973 — Batteries for Use in Stationary and Motive Auxiliary Power ApplicationsUL 1973 — shopulstandards · accessed 2026-09-22
UL 61730-1 (only if PV side included)PV Module Safety Qualification — Part 1UL 61730-1 — Photovoltaic (PV) Module Safety Qualification — Part 1: Requirements for constructionUL 61730-1 — shopulstandards · accessed 2026-09-22
Lithium transportUN Manual of Tests and Criteria, UN 38.3 provisionsUN Manual of Tests and Criteria, ST/SG/AC.10/11/Rev.7 (UN 38.3 lithium battery provisions)UN Manual of Tests and Criteria — UNECE · accessed 2026-09-22
IATA Dangerous Goods (air-freight leg, if used)Lithium battery air transportIATA Dangerous Goods Regulations (DGR), current editionIATA Dangerous Goods (DGR) · accessed 2026-09-22
Wood packaging (if any)ISPM 15IPPC ISPM 15 — Regulation of wood packaging material in international tradeIPPC ISPM standards list · accessed 2026-09-22
Grid interface — IrelandESB Networks G99 processESB Networks G99 interface requirements (current revision)ESB Networks (G99 interface page; fee & form PENDING — lookup) · accessed 2026-09-22

No certificate number, issuer name, torque limit, SOC window or DC bus voltage is published on this generic-class page. Those fields are recorded verbatim from the chosen OEM manual (title + revision) on the per-RFQ datasheet pack.

6. Incoterms & lane (CN → IE)

TopicReferenceDeep-link evidence
Incoterms 2020 rulesICC Incoterms 2020 (EXW, FCA, FOB, CFR, CIF, CIP, DAP, DDP)ICC — Incoterms 2020 · accessed 2026-09-22
Freight forwarding documents (FIATA)FIATA documents (FWB, FCR, etc.)FIATA · accessed 2026-09-22
Cargo insurance (Institute Cargo Clauses (A) — all-risks marine)Institute Cargo Clauses (A), current editionIUA policy clauses library · accessed 2026-09-22
EU Battery Regulation (in parallel to customs)Regulation (EU) 2023/1542EUR-Lex — Regulation (EU) 2023/1542 · accessed 2026-09-22

7. FAQ — 1 MWh LFP container ESS, CN→IE (generic product class)

Q1. Is this TCO a quote?

No. The COMPUTED TABLES are the only mathematics on this page. With every cost-side input (capex[0..9], replacements[0..2], opex.fixed, residual_value.amount) marked DROPPED-ITEM, the model returns EUR 0.0000 for total undiscounted cost, total discounted cost, simple payback, discounted payback and LCOS. The benefit side reflects only the bounded default revenue inputs declared in §3. Committed payback, IRR and LCOS are produced per RFQ once the OEM quote, freight quote, EU TARIC duty, Irish VAT and ESB G99 fee are returned.

Q2. Which OEM or model is named on this page?

Candidate OEM families are named in §2: CATL EnerC 1MWh container BESS family (catl.com/en/ess), BYD MC Cube commercial-industrial LFP (bydenergy.com), Sungrow ST-series PCS / SC-series container (sungrowpower.com/en/products/string-inverter) and Huawei SUN2000 string inverter family (solar.huawei.com/en/products/sun2000-330ktl-h1). The specific SKU number, OEM manual title and revision, torque limits, SOC windows and DC bus voltages are recorded verbatim on the per-RFQ datasheet pack only.

Q3. What HS code applies?

The working assumption is subheading 8507.60 (lithium-ion). Cross-check chapter/note context against the WCO HS Nomenclature 2022 edition (wcoomd.org). The exact national line, end-of-year CN explanatory note, any additional duty, and the Irish VAT rate must be looked up on the EU TARIC consultation for the IE destination and on the Irish Revenue — Importing portal at the moment of declaration. Regulation (EU) 2023/1542 applies in parallel (see EUR-Lex).

Q4. Which certifications should the container carry for Ireland?

EU market access: CE marking under applicable directives. Stationary-storage cell/pack safety & performance: IEC 62619:2022 and IEC 63056:2020 (full designation cited on the per-RFQ pack; catalogue at IEC Webstore). Lithium transport: UN 38.3 provisions of the UN Manual of Tests and Criteria (ST/SG/AC.10/11/Rev.7, UNECE) and IATA DGR if any leg is by air (IATA DGR). Grid interface in Ireland: ESB Networks G99 process (ESB Networks). Optional North-American parallel listing: UL 1973 (UL 1973) / UL 9540A.

Q5. Why are all cost rows 0.0000 EUR?

Because all capex[0..9].amount, replacements[0..2].amount, opex.fixed and residual_value.amount were marked DROPPED-ITEM in the source model. The COMPUTED TABLES are reproduced verbatim; the model returns EUR 0.0000 for every cost-side field when cost-side inputs are absent.

Q6. Can Tradvolt ship DDP Dublin / DAP Cork?

Yes, subject to RFQ. Common Incoterms 2020 for this lane are EXW, FCA, FOB, CFR, CIF, CIP, DAP and DDP (rules: ICC Incoterms 2020). The RFQ form lets the buyer specify the desired Incoterm.

Q7. What is the lead time for a 1 MWh LFP container ESS into Ireland?

Lead time depends on OEM production slot, ocean sailing schedule and ESB G99 interface approval window. Use the RFQ form for a date-committed lead time once the OEM and freight forwarder are confirmed.

Request Quote — replies in 48h Download TCO pack (PDF)

8. Sources & evidence pack