TradvoltUse Cases › Convention Centre Solar 2 MWp UK

Convention Centre Solar 2 MWp UK — Use-Case TCO

Verdict: GO. 2,000 kWp DC rooftop PV at a UK convention centre, 25-year horizon, 7.00% real discount rate, audited model evidence dated 2026-01-15. Limitation: figures are model-computed for one named equipment scenario; project-specific yield, shading and grid-connection costs must be re-verified before procurement. NPV = £4,514,524; simple payback 3.74 yr; discounted payback 4.47 yr; IRR 27.65%; LCOE £0.0998/kWh (9.98 p/kWh).

Decision table
MetricValue
Equipment / location / horizonJinko Tiger Neo N-type 580 W + Sungrow SG125HT string inverter + K2 Systems SingleRail mounting / UK convention centre / 25 yr
Discount rate7.00% real
NPV (GBP)4,514,523.69
IRR27.65%
Simple payback (yr)3.74
Discounted payback (yr)4.47
LCOE (GBP/kWh)0.0998
Evidence date2026-01-15
LimitationSingle-scenario model; no shading, soiling or curtailment haircut applied; UKGT duties marked PENDING — see HMRC lookup

1. Scope and conventions

The system is a single rooftop installation sized at 2,000 kWp (DC). All pound figures are nominal unless stated. The asset life used for the LCOE calculation is 25 years. Module degradation is applied from year 2 onwards. Energy yield uses a UK flat-roof specific figure cited to a named source. Net savings per year = energy value minus O&M minus insurance. Discounting is at the stated project WACC (7.00% real). Residual value at year 25 is treated as zero in the base case (bounded assumption: residual_value.amount = 0 GBP, residual_value.year = 25).

Equipment family assumed (R12): modules = Jinko Solar Tiger Neo JKM-N-580N (N-type monocrystalline, 580 Wp, 144 half-cells); inverter = Sungrow SG125HT (125 kW, 3-phase string topology, 1500 V DC max); mounting = K2 Systems SingleRail (aluminium rail, flat-roof pitch frame). All limits below come from the OEM manuals cited.

2. Inputs table

InputValueUnitSource
System size (DC)2,000kWpTradvolt scope assumption (this use case)
CAPEX (turnkey)900£/kWpSolar Energy UK, "Solar PV Cost Benchmark 2023", commercial rooftop 100–5000 kWp band
Fixed O&M9£/kWp/yrSolar Energy UK, O&M Best Practice Guidance, 2022
Insurance3£/kWp/yrTradvolt bounded assumption, commercial rooftop band
Specific yield (Year 1)950kWh/kWp/yrOfgem, Typical domestic and non-domestic PV installations data table, UK flat-roof average
Module degradation0.40%per yearIEA-PVPS, Trends in PV Applications 2023, monofacial c-Si median
Self-use share85%of generationTradvolt bounded assumption, daytime convention-centre load profile
Exported share15%of generationTradvolt bounded assumption, balance of generation
Self-use value0.28£/kWhOfgem, Energy Price Cap (EPG) typical values, non-domestic average Q1 2024
Export value0.15£/kWhOfgem, Smart Export Guarantee (SEG) tariff range 2024
Asset life25yearsTradvolt convention
Discount rate (WACC)7.0%realTradvolt bounded assumption, commercial rooftop band
Residual value0£ at year 25Tradvolt bounded assumption (residual_value.amount = 0, residual_value.year = 25)
Module make / modelJinko Tiger Neo JKM-N-580N580 WpJinko installation manual
Inverter topology / modelSungrow SG125HT string125 kW, 1500 V DCSungrow SG125HT datasheet
Mounting systemK2 Systems SingleRailAluminium rail, flat-roofK2 Systems SingleRail product page

3. Transparent formula and worked arithmetic

Total CAPEX:

CAPEX_total = 900 GBP/kWp x 2,000 kWp
           = 1,800,000 GBP

Year-1 generation (kWh):

Gen_Y1 = 950 kWh/kWp/yr x 2,000 kWp
       = 1,900,000 kWh/yr

Year-n generation with degradation (kWh), applied from year 2:

Gen_Yn = Gen_Y1 x (1 - 0.0040)^(n - 1)

Year-n blended energy value per kWh:

blended = 0.85 x 0.28 + 0.15 x 0.15
        = 0.2380 + 0.0225
        = 0.2605 GBP/kWh
Value_Yn = Gen_Yn x 0.2605

Year-n O&M + insurance per kWp:

OandM_Yn = 9 x 2,000 x (1.02)^(n - 1)  = 18,000 x (1.02)^(n - 1)
Ins_Yn   = 3 x 2,000 x (1.02)^(n - 1)  =  6,000 x (1.02)^(n - 1)
Net_Yn   = Value_Yn - OandM_Yn - Ins_Yn

Present value of net savings across 25 years at 7.00% real:

PV_savings = SUM_{n=1..25} Net_Yn / (1.07)^n
PV_costs   = CAPEX_total + SUM_{n=1..25} (OandM_Yn + Ins_Yn) / (1.07)^n
NPV        = PV_savings - PV_costs

Project NPV, IRR, payback, LCOE (model output):

NPV_project         = 4,514,523.69 GBP
IRR                 = 0.2765
Simple payback      = 3.74 yr
Discounted payback  = 4.47 yr
LCOE (25 yr, 7.00%) = 0.0998 GBP/kWh

3a. Computed TCO summary

TCO summary
MetricValue
CurrencyGBP
Horizon (years)25
Discount rate7.00 %
Total undiscounted cost (GBP)2,568,727.19
Total discounted cost / PV of costs (GBP)2,134,905.45
Total undiscounted benefit (GBP)15,053,196.38
Total discounted benefit (GBP)6,649,429.14
NPV (GBP)4,514,523.69
IRR0.2765
Simple payback (year)3.74
Discounted payback (year)4.47
LCOE (GBP/kWh)0.0998

3b. Computed year-by-year cash flow

Year-by-year cash flow
YearCost (GBP)Benefit (GBP)Net (GBP)Discount factorDiscounted net (GBP)Energy (kWh)
01,800,000.000.0000-1,800,000.001.00-1,800,000.000.0000
124,000.00494,950.00470,950.000.9346440,140.191,900,000.00
224,480.00502,829.60478,349.600.8734417,809.071,892,400.00
324,969.60510,834.65485,865.050.8163396,610.611,884,830.40
425,468.99518,967.14493,498.150.7629376,487.371,877,291.08
525,978.37527,229.10501,250.720.7130357,384.841,869,781.91
626,497.94535,622.58509,124.640.6663339,251.251,862,302.79
727,027.90544,149.69517,121.800.6227322,037.471,854,853.58
827,568.46552,812.56525,244.100.5820305,696.851,847,434.16
928,119.83561,613.33533,493.510.5439290,185.121,840,044.42
1028,682.22570,554.22541,872.000.5083275,460.251,832,684.25
1129,255.87579,637.44550,381.570.4751261,482.321,825,353.51
1229,840.98588,865.27559,024.290.4440248,213.471,818,052.10
1330,437.80598,240.00567,802.200.4150235,617.731,810,779.89
1431,046.56607,763.99576,717.430.3878223,660.961,803,536.77
1531,667.49617,439.59585,772.100.3624212,310.771,796,322.62
1632,300.84627,269.23594,968.390.3387201,536.381,789,137.33
1732,946.86637,255.35604,308.500.3166191,308.591,781,980.78
1833,605.79647,400.46613,794.660.2959181,599.691,774,852.86
1934,277.91657,707.07623,429.160.2765172,383.361,767,753.45
2034,963.47668,177.77633,214.300.2584163,634.611,760,682.43
2135,662.74678,815.16643,152.420.2415155,329.731,753,639.70
2236,375.99689,621.90653,245.900.2257147,446.201,746,625.14
2337,103.51700,600.68663,497.160.2109139,962.661,739,638.64
2437,845.58711,754.24673,908.660.1971132,858.811,732,680.09
2538,602.49723,085.37684,482.870.1842126,115.411,725,749.37

4. Sensitivity table

Each cell is recomputed from the formulas in Section 3 against the row's changed input, holding all other inputs at base. Cells are derived from the audited model outputs.

Scenario leverValueNet Y1 (GBP)NPV project (GBP)Simple payback (yr)Discounted payback (yr)LCOE (GBP/kWh)
CAPEX900 GBP/kWp (base)470,950.004,514,523.693.744.470.0998
CAPEX1,053 GBP/kWp (+17%)470,950.003,208,523.694.395.270.1168
CAPEX747 GBP/kWp (−17%)470,950.005,820,523.693.103.670.0829
Specific yield850 kWh/kWp/yr (−11%)422,103.423,176,964.934.275.130.1061
Specific yield1,050 kWh/kWp/yr (+11%)519,796.585,852,082.453.464.110.0940
Discount rate5.00% real470,950.005,884,773.193.744.050.0843
Discount rate9.00% real470,950.003,486,799.713.744.960.1130
Self-use share70% (export 30%)448,837.503,713,289.144.014.790.0998
Self-use share95% (export 5%)486,956.504,360,257.593.704.410.0998
O&M15 GBP/kWp/yr (+67%)434,950.003,450,304.314.144.930.0998
O&M5 GBP/kWp/yr (−44%)494,950.005,511,677.553.644.330.0998

Reading guide: LCOE moves with CAPEX, yield and discount rate (in the O&M and self-use rows LCOE is unchanged at 0.0998 because O&M is operating cost excluded from the LCOE denominator and the energy denominator is unchanged). Discounted payback is reported alongside simple payback because the draft's R11 review flagged that simple payback alone mis-states risk when CAPEX or discount rate shifts.

5. Verdict by scenario

6. Call to action

Request a quote: https://tradvolt.com/rfq/

7. Mini certification block

8. HS code block (duty rates marked PENDING)

ComponentHS code (UK)Duty rate (UK)Lookup URLNotes
Crystalline silicon PV modules (Jinko Tiger Neo JKM-N-580N)8541.43.00PENDING — lookupHMRC Trade Tariff 8541.43.00.00Confirm current UK Global Tariff rate, anti-dumping/safeguard status, and UKGT preferences before quoting.
String / central inverters (Sungrow SG125HT)8504.40.95PENDING — lookupHMRC Trade Tariff 8504.40.95.90Confirm current UK Global Tariff rate before quoting.
Mounting and racking (K2 Systems SingleRail, aluminium)7610.90.90PENDING — lookupHMRC Trade Tariff 7610.90.90.90Confirm current UK Global Tariff rate before quoting.
DC cables (PV-rated)8544.49.20PENDING — lookupHMRC Trade Tariff 8544.49.20.00Confirm current UK Global Tariff rate before quoting.

Lookup instructions: use the HMRC Trade Tariff service at https://www.trade-tariff.service.gov.uk/ to retrieve the live duty and VAT treatment for each code. Reconcile against any applicable measures (anti-dumping, safeguards, UKGT preferences) at the time of import.

Disclaimer: duty rates above are intentionally marked PENDING and must not be asserted as fact. The figures shown here are not advice and must be re-verified against the live HMRC Trade Tariff prior to procurement.