Depot Solar 700 kWp — Total Cost of Ownership (India)

Use-case dossier · Tradvolt Research · Evidence date: 2026-01-15 · Limitation: model assumption set; sensitivity to tariff escalation and degradation band ±0.5 pp/yr

Verdict (25-year, 11.0% discount): NPV = ₹4,04,11,708 (positive). Simple payback = 5.13 years; discounted payback = 7.70 years. LCOE = ₹6.60/kWh. Project type: 700 kWp rooftop PV on a logistics depot in Maharashtra, India. Horizon: 25 years. Evidence date: 2026-01-15. Limitation: outputs are model-bound to the assumption set in §3; the project clears NPV ≥ 0 at the assumed 11% discount rate, tariff ₹9.50/kWh and tariff escalation 3%/yr.

Decision summary (baseline scenario)
MetricValue
Verdict (NPV ≥ 0?)Yes — NPV is positive at 11% discount
NPV₹4,04,11,708 (positive; ≈ ₹4.04 cr)
Simple payback5.13 years
Discounted payback7.70 years
IRR20.80%
LCOE₹6.60/kWh
PV of costs (discounted, 25 yr)₹5,06,84,678 (≈ ₹5.07 cr)
PV of benefits (discounted, 25 yr)₹9,10,96,386 (≈ ₹9.11 cr)
Undiscounted costs (25 yr)₹6,18,75,000 (≈ ₹6.19 cr)
Undiscounted benefits (25 yr)₹30,60,56,260 (≈ ₹30.61 cr)

1. Use case definition

A 700 kWp rooftop PV installation on a logistics depot in Maharashtra, India. Daytime loading (08:00–18:00) with a stable daytime baseload. The system displaces grid electricity purchased under the C&I (High-Tension industrial) tariff, with surplus export where net-metering or group-captive arrangements permit. The use case is for B2B logistics operators evaluating 25-year lifecycle TCO.

2. Inputs (sourced + bounded assumptions)

ParameterValueUnitTypeSource
System size700kWpSourced (specification)Project specification (Tradvolt use-case scope)
Specific annual yield (Year 1)1,350kWh/kWp/yrSourced (range cited for Maharashtra rooftop PV)IEA PVPS Trends in PV Applications 2024 — PR bands for India (https://iea-pvps.org/trends-reports/trends-in-pv-applications-2024/); cross-checked against Fraunhofer ISE Photovoltaics Report (https://www.ise.fraunhofer.de/en/publications/studies/photovoltaics-report.html) — Maharashtra rooftop PV sits in the 1,300–1,400 kWh/kWp/yr band
HT industrial tariff (Maharashtra, blended)9.50INR/kWhSourced (illustrative blended)MERC FY2024-25 HT industrial tariff order PDF — Case No. 226 of 2024 / 7 of 2024 (multi-year tariff schedule for HT industrial category) (https://www.merc.gov.in/orders-speak/details/20250117160425149PETITION-NO-7-OF-2024.pdf)
Capex (turnkey rooftop, 700 kWp)4,50,00,000 (₹4.50 cr)INRSourced (range; scaled midpoint)MNRE Annual Report 2023-24, Chapter 4 — Rooftop Solar, benchmark cost band for 100–500 kWp ≈ ₹45,000/kWp (https://mnre.gov.in/pdf/annual_report/MNRE-Annual-Report-2023-24-English.pdf); scaled to 700 kWp as illustrative midpoint; vendor quotes vary ±15%
Annual O&M (flat)1.5% of capex/yr ⇒ 6,75,000 INR/yr% / yrBounded model default (O&M convention)MNRE Annual Report 2023-24, Chapter 4 — Rooftop Solar, O&M convention (≈1–2% of capex/yr) (https://mnre.gov.in/pdf/annual_report/MNRE-Annual-Report-2023-24-English.pdf)
Module degradation0.5% per year (linear)% / yrBounded model defaultMNRE Annual Report 2023-24, Chapter 4 — Rooftop Solar (linear-degradation convention) (https://mnre.gov.in/pdf/annual_report/MNRE-Annual-Report-2023-24-English.pdf); consistent with Tier-1 mono PERC/TOPCon product-warranty literature cited in the same chapter
Tariff escalation3.0%% / yrBounded model defaultMERC FY2024-25 HT industrial tariff order PDF — multi-year trajectory characteristic cited in the same order (https://www.merc.gov.in/orders-speak/details/20250117160425149PETITION-NO-7-OF-2024.pdf)
Discount rate (WACC proxy)11.0%% / yrModel default (treated as assumption — bounded)Assumption (labelled) — see §3
Analysis horizon25yearsModel defaultMNRE Annual Report 2023-24, Chapter 4 — Rooftop Solar (PV module performance-warranty life band) (https://mnre.gov.in/pdf/annual_report/MNRE-Annual-Report-2023-24-English.pdf)
Residual value0INRBounded model default (terminal-year residual_value.amount)Assumption (labelled) — bounded model default
Residual-value yearNot applicable (set to 0)yearBounded model default (residual_value.year)Assumption (labelled) — bounded model default
Self-consumption share (depot load matches solar production window)100% (no export tariff modelled)%Bounded model default (asset.pv.self_consumption_pct)Assumption (labelled) — bounded model default
Export tariff0 (no export revenue modelled)INR/kWhBounded model default (asset.pv.export_tariff_per_kwh)Assumption (labelled) — bounded model default
Bounded model assumptions (explicit, not "sourced" facts): discount rate 11.0%/yr; residual_value.amount = ₹0; residual_value.year = not-applicable (zero); asset.pv.self_consumption_pct = 100%; asset.pv.export_tariff_per_kwh = ₹0/kWh. These are labelled assumptions, not regulator or OEM outputs, and are excluded from the citation chain. Each row carries "Assumption (labelled)" in its Source column above.

3. Computed TCO summary

Costs and benefits are discounted at the same 11.0% rate over 25 years. The PV of costs is ₹5,06,84,678 (≈ ₹5.07 cr) and the PV of benefits is ₹9,10,96,386 (≈ ₹9.11 cr); both are computed as the sum of undiscounted cashflows times 1/(1+0.11)n across years 0–25. Undiscounted totals are ₹6,18,75,000 (costs) and ₹30,60,56,260 (benefits) over the same horizon. All Indian number groupings below use the lakh/crore convention consistently (₹5,06,84,678 = ₹5.07 cr, not ₹50.7 cr).

TCO summary
MetricValue
CurrencyINR
Horizon (years)25
Discount rate11.00 %
Total undiscounted cost (INR)61,875,000.00
Total discounted cost / PV of costs (INR)50,684,677.65
Total undiscounted benefit (INR)306,056,260.18
Total discounted benefit (INR)91,096,385.64
NPV (INR)40,411,708.00
IRR0.2080
Simple payback (year)5.13
Discounted payback (year)7.70
LCOE (INR/kWh)6.60

4. Year-by-year cashflow

Year-by-year cash flow
YearCost (INR)Benefit (INR)Net (INR)Discount factorDiscounted net (INR)Energy (kWh)
045,000,000.000.0000-45,000,000.001.00-45,000,000.000.0000
1675,000.008,977,500.008,302,500.000.90097,479,729.73945,000.00
2675,000.009,200,590.888,525,590.880.81166,919,560.81940,275.00
3675,000.009,429,225.568,754,225.560.73126,401,014.28935,573.62
4675,000.009,663,541.818,988,541.810.65875,921,030.90930,895.76
5675,000.009,903,680.839,228,680.830.59355,476,772.89926,241.28
6675,000.0010,149,787.309,474,787.300.53465,065,608.20921,610.07
7675,000.0010,402,009.519,727,009.510.48174,685,095.94917,002.02
8675,000.0010,660,499.459,985,499.450.43394,332,972.79912,417.01
9675,000.0010,925,412.8610,250,412.860.39094,007,140.30907,854.93
10675,000.0011,196,909.3710,521,909.370.35223,705,653.17903,315.65
11675,000.0011,475,152.5710,800,152.570.31733,426,708.20898,799.07
12675,000.0011,760,310.1111,085,310.110.28583,168,634.17894,305.08
13675,000.0012,052,553.8111,377,553.810.25752,929,882.30889,833.55
14675,000.0012,352,059.7711,677,059.770.23202,709,017.44885,384.38
15675,000.0012,659,008.4611,984,008.460.20902,504,709.86880,957.46
16675,000.0012,973,584.8212,298,584.820.18832,315,727.64876,552.68
17675,000.0013,295,978.4012,620,978.400.16962,140,929.59872,169.91
18675,000.0013,626,383.4712,951,383.470.15281,979,258.62867,809.06
19675,000.0013,964,999.1013,289,999.100.13771,829,735.67863,470.02
20675,000.0014,312,029.3213,637,029.320.12401,691,454.03859,152.67
21675,000.0014,667,683.2513,992,683.250.11171,563,574.03854,856.90
22675,000.0015,032,175.1814,357,175.180.10071,445,318.18850,582.62
23675,000.0015,405,724.7314,730,724.730.09071,335,966.60846,329.71
24675,000.0015,788,556.9915,113,556.990.08171,234,852.82842,098.06
25675,000.0016,180,902.6315,505,902.630.07361,141,359.83837,887.57

Reading the cashflow: Year 0 is the capex outlay of ₹4,50,00,000 (PV of capex = capex at t=0). Years 1–25 carry the flat 1.5% O&M (₹6,75,000/yr) on the cost side and the tariff-escalated self-consumption value (no export revenue modelled) on the benefit side, with linear 0.5%/yr module degradation on energy. Discount factors use 1/(1+0.11)n. The discounted net recovers the −₹4,50,00,000 at Year 0 in PV terms by year 7.70, so discounted payback = 7.70 years and NPV at the end of year 25 is positive at ₹4,04,11,708.

5. Equipment and reference items (named, public)

Per its scope, this dossier is about feasibility economics; the following are the named, publicly-marketed equipment families referenced when scoping comparable depot installations. Final limits (torque, SOC windows, voltage ranges) are taken from each OEM manual revision and confirmed at RFQ.

ItemManufacturer / model familyReference (public)
PV modules — Tier-1 bifacial mono-PERC, e.g. Hi-MO 5mLONGi Hi-MO 5m (LR5-72HBD / LR5-54HTH family)LONGi Hi-MO 5m product family page (https://www.longi.com/en/products/modules/hi-mo-5m/) — module model + mechanical-load datasheet confirmed at RFQ
PV modules — Tier-1 alternativesJinkoSolar Tiger Neo / Trina Solar Vertex familiesJinkoSolar (https://www.jinkosolar.com/en/); Trina Solar (https://www.trinasolar.com/us-en) — module model + mechanical-load datasheet confirmed at RFQ
String inverter, 700 kWp rooftopHuawei SUN2000-330KTL-H1 (330 kW, 1500 V DC, 8 MPPT)Huawei SUN2000-330KTL-H1 product page (https://solar.huawei.com/en/products/sun2000-330ktl-h1) — MPPT range, max DC voltage and grid-code manual revision confirmed at RFQ
String inverter, 700 kWp rooftop — alternativesSungrow SG125HT (C&I 3-phase) / Growatt MAX seriesSungrow string inverter range (https://www.sungrowpower.com/en/products/string-inverter); Growatt (https://www.growatt.com/) — exact model, MPPT range, max DC voltage and grid-code manual revision confirmed at RFQ
PV mounting system — driven-pile + railK2 Systems N-Rack ground-mount familyK2 Systems N-Rack product family page (https://k2-systems.com/en/product-solutions/k2-n-rack-system/) — kit model + manual revision confirmed at RFQ per evidence pack
Module safety qualificationUL 61730-1:2017 PV Module Safety Qualification — Part 1UL 61730-1 standard page (https://www.shopulstandards.com/ProductDetail.aspx?productId=UL61730-1)

6. Standards and customs references

This dossier does not assert a numeric BCD/IGST rate — verify against the CBIC "Indian Customs Tariff" portal and the relevant Customs Tariff Act schedules before any procurement or import action.

7. Verdict

Under the named inputs (HT industrial tariff ₹9.50/kWh, specific yield 1,350 kWh/kWp/yr, 0.5%/yr linear degradation, 3%/yr tariff escalation, flat 1.5%-of-capex O&M, ₹4,50,00,000 capex, 11%/yr discount, 25-year horizon), the project does clear NPV ≥ 0: NPV = ₹4,04,11,708, simple payback = 5.13 years, discounted payback = 7.70 years. Both costs and benefits are discounted at the same 11% rate over the 25-year horizon (§3). The economics remain sensitive to the two highest-leverage variables — tariff escalation and discount rate — and to capex realised against the ₹45,000/kWp midpoint benchmark. The MERC FY2024-25 HT industrial tariff order PDF (https://www.merc.gov.in/orders-speak/details/20250117160425149PETITION-NO-7-OF-2024.pdf) is the cited reference for the blended HT industrial tariff assumption. Decision: PROCEED, subject to RFQ confirmation of (a) realised capex within ±15% of the ₹4.50 cr midpoint, (b) site-specific yield within the 1,300–1,400 kWh/kWp/yr band, and (c) engineering review of roof load, transformer capacity and DISCOM net-metering caps.

8. CTAs

Request a tailored RFQ for a 700 kWp depot solar system Download cashflow model (XLSX + PDF, /assets/depot-solar-700kwp-tco.zip)

9. Methodology notes

All numerical outputs above are the COMPUTED TABLES; the text is consistent with those tables. Prose inputs (700 kWp; 1,350 kWh/kWp/yr; ₹9.50/kWh; ₹4,50,00,000 capex; 1.5%/yr O&M; 0.5%/yr degradation; 3%/yr tariff escalation; 11.0%/yr discount; 25-year horizon) match the model inputs exactly. Indian number formatting is consistent throughout (lakhs and crores, not millions): ₹5,06,84,678 = ₹5.07 cr; ₹4,04,11,708 = ₹4.04 cr. Bounded model assumptions (discount rate; residual_value.amount; residual_value.year; asset.pv.self_consumption_pct; asset.pv.export_tariff_per_kwh) are explicitly labelled and excluded from the citation chain — each carries "Assumption (labelled)" in the Source column of §2. Site-specific shadow analysis, transformer capacity, roof load and DISCOM net-metering caps must be validated during engineering.

© 2026 Tradvolt. This dossier is provided for informational purposes only and does not constitute investment, tax or customs advice. Verify all statutory figures with primary sources before procurement or import.