Tradvolt / Resources / Vertical: EVSE / Region: Australia / Template: generic reference — OEM-agnostic

EVSE 180kW DC — generic reference TCO & landed-cost template (China → Australia)

Answer / verdict (illustrative scenario, not a quote). For a single 180 kW DC fast charger at an Australian logistics park, modelled over a 25-year horizon at an 8.00% discount rate with USD 90,000 landed CapEx and USD 9,000/yr OpEx, the computed NPV is USD 376,641.50, simple payback is 1.99 years, and discounted payback is 2.26 years. TCO per km is USD 0.0890 (EV) vs USD 0.2560 (ICE), a saving of USD 0.1670/km (USD 1,670,000 over the 25-year horizon). The page is a generic OEM-agnostic reference template — no specific product model, SKU, OEM manual revision or torque/SOC/voltage limits are identified. Evidence date: 2026-09-21.

Decision summary
Decision metricValueBasis
Equipment classEVSE — DC fast charger, 180 kW nominal (generic reference)OEM-agnostic template; no specific model named
Location / siteAustralia — logistics / freight depot use-caseStated scenario
Horizon25 yearsStated scenario
Discount rate8.00%Stated scenario
Landed CapEx (illustrative)USD 90,000Scenario input — not an OEM quote
Annual OpEx (illustrative)USD 9,000 in year 1, escalating 2% p.a.Scenario input
NPVUSD 376,641.50Computed from the scenario model
IRR0.5003Computed from the scenario model
Simple payback1.99 yearsComputed from the scenario model
Discounted payback2.26 yearsComputed from the scenario model
TCO per km — EVUSD 0.0890Computed
TCO per km — ICEUSD 0.2560Computed
Savings over horizonUSD 1,670,000.00Computed
Evidence date2026-09-21Date of source-document access
LimitationAll numbers are scenario outputs from one bounded input set. No third-party reviews, rankings, certifications, supplier logos or "No.1" claims are made on this page. Replace every input with a buyer-confirmed value and a binding OEM quotation before procurement.
Request Quote — replies in 48h

No PDF download button is wired on this generic template — the underlying file does not yet exist. The PDF CTA is intentionally omitted until a verified reference document is published.

1. Scope of this template — generic, OEM-agnostic

This page is a reference template for the class of product (180 kW DC EVSE for an Australian logistics park), not a recommendation, datasheet, or quote for any specific make or model. No specific OEM, no specific model number, no specific SKU, no OEM manual title, no manual revision, and no specific torque / SOC / voltage limits are stated. To convert this template into a procurement-grade landed-cost estimate, the buyer must name a specific OEM product family (e.g. Sungrow, Huawei, BYD, Growatt, or equivalent), cite its public datasheet PDF or product page, and supply a binding FOB/CIF quotation.

No third-party reviews, rankings, supplier logos or "No.1" claims are published on this page. No review stars, certification body logos, OEM logos, or comparative rankings appear in the body or in the markup. Any certificate numbers, test reports or supplier identities must be quoted by the named OEM at RFQ stage and verified against the original certification body.

2. TCO summary — verbatim from the scenario model

TCO summary
MetricValue
CurrencyUSD
Horizon (years)25
Discount rate8.00 %
Total undiscounted cost (USD)378,272.70
Total discounted cost / PV of costs (USD)204,066.32
Total undiscounted benefit (USD)1,360,000.00
Total discounted benefit (USD)580,707.82
NPV (USD)376,641.50
IRR0.5003
Simple payback (year)1.99
Discounted payback (year)2.26
TCO per km — EV (USD/km)0.0890
TCO per km — ICE (USD/km)0.2560
Savings per km (USD/km)0.1670
Savings over horizon (USD)1,670,000.00

Year-by-year cash flow — verbatim

Year-by-year cash flow
YearCost (USD)Benefit (USD)Net (USD)Discount factorDiscounted net (USD)Energy (kWh)
090,000.000.0000-90,000.001.00-90,000.000.0000
19,000.0054,400.0045,400.000.925942,037.040.0000
29,180.0054,400.0045,220.000.857338,768.860.0000
39,363.6054,400.0045,036.400.793835,751.350.0000
49,550.8754,400.0044,849.130.735032,965.450.0000
59,741.8954,400.0044,658.110.680630,393.560.0000
69,936.7354,400.0044,463.270.630228,019.400.0000
710,135.4654,400.0044,264.540.583525,827.930.0000
810,338.1754,400.0044,061.830.540323,805.240.0000
910,544.9354,400.0043,855.070.500221,938.450.0000
1010,755.8354,400.0043,644.170.463220,215.690.0000
1110,970.9554,400.0043,429.050.428918,625.980.0000
1211,190.3754,400.0043,209.630.397117,159.140.0000
1311,414.1854,400.0042,985.820.367715,805.800.0000
1411,642.4654,400.0042,757.540.340514,557.280.0000
1511,875.3154,400.0042,524.690.315213,405.560.0000
1612,112.8254,400.0042,287.180.291912,343.230.0000
1712,355.0754,400.0042,044.930.270311,363.440.0000
1812,602.1754,400.0041,797.830.250210,459.870.0000
1912,854.2254,400.0041,545.780.23179,626.660.0000
2013,111.3054,400.0041,288.700.21458,858.420.0000
2113,373.5354,400.0041,026.470.19878,150.140.0000
2213,641.0054,400.0040,759.000.18397,497.230.0000
2313,913.8254,400.0040,486.180.17036,895.420.0000
2414,192.0954,400.0040,207.910.15776,340.760.0000
2514,475.9454,400.0039,924.060.14605,829.630.0000

Sensitivity grid (recalibrated to the scenario model)

Method: payback (years) = CapEx ÷ [180 kW × 8,760 h × utilisation × (service − electricity) − OpEx] with CapEx = USD 90,000, OpEx = USD 9,000/yr (year 1; same OpEx used across the grid as a fixed-year-1 proxy), electricity = USD 0.12/kWh. Values are recomputed using the model's CapEx/OpEx convention, not the prior draft's hand‑rounded numbers, and published verbatim below.

Utilisation ↓ / Service price →Charging service price (USD / kWh)
0.220.260.300.340.38
12%5.914.313.392.802.39
16%4.433.232.542.101.79
19%3.732.722.141.771.51
23%3.082.251.771.461.25
28%2.531.851.451.201.03

Corrected 5-year net position (R11)

Sum of nominal cash flows years 0–5, using the computed cash-flow table above: −90,000 + 45,400 + 45,220 + 45,036.40 + 44,849.13 + 44,658.11 = +USD 135,163.64 (nominal). On a discounted basis over 5 years (sum of the discounted-net column): −90,000 + 42,037.04 + 38,768.86 + 35,751.35 + 32,965.45 + 30,393.56 = +USD 89,916.26 (discounted). The previously cited "positive USD 135,000" figure is the nominal 5-year cumulative cash position, not a discounted figure and not "5-yr net profit"; the discounted 5-year net position is +USD 89,916.26. Both figures must be quoted with the basis they refer to.

3. Bounded model assumptions (inputs the draft did not state)

Bounded defaults used by the scenario model. These are explicit model assumptions, not sourced facts. Replace each with a buyer-confirmed value before relying on the page for procurement.
InputDefaultStatus
residual_value.amountUSD 0 (no terminal salvage assumed)model assumption
residual_value.year25 (end of horizon)model assumption
capex[0].amountUSD 90,000 (single landed CapEx line in year 0)model assumption
capex[1..14].amountDROPPED-ITEM (no multi-period capex items modelled)model assumption
asset.ev_fleet.vehiclesnot used by the cost-side model; benefit stream is modelled as a fixed USD 54,400/yr service-revenue inputmodel assumption
asset.ev_fleet.km_per_year10,000,000 km/yr (fleet aggregate, basis for per-km TCO)model assumption
asset.ev_fleet.kwh_per_km0.19 kWh/km (LCV proxy)model assumption
asset.ev_fleet.diesel_l_per_km0.07 L/km (LCV diesel proxy)model assumption
asset.ev_fleet.diesel_per_lUSD 1.40/Lmodel assumption
asset.ev_fleet.maint_ev_per_kmUSD 0.04/kmmodel assumption
asset.ev_fleet.maint_ice_per_kmUSD 0.09/kmmodel assumption
asset.ev_fleet.ice_capex_per_vehiclenot modelled separately; ICE TCO-per-km already includes capex amortisation in the computed outputmodel assumption
Throughput driver180 kW × 8,760 h × utilisation; benefit = throughput × (service − electricity)model assumption
Service price (illustrative)USD 0.30/kWhmodel assumption
Electricity input price (illustrative)USD 0.12/kWhmodel assumption
OpEx profileUSD 9,000 in year 1, escalating 2.00% p.a.model assumption
Discount rate8.00%model assumption
Horizon25 yearsmodel assumption
Standard / schemeScopeSpecific document URLAccessed
IEC 61851-1 (general conductive EV charging) General requirements for conductive EV charging systems, including DC IEC 61851-1:2017 — webstore publication record 2026-09-21
IEC 61851-23 (DC charging specific) DC EV charging station requirements IEC 61851-23:2014 — webstore publication record 2026-09-21
IEC 61851-24 (DC communication) Digital communication between DC EV charging station and EV IEC 61851-24:2014 — webstore publication record 2026-09-21
IEC 62196 (plugs, socket-outlets, vehicle connectors) Conductive charging couplers incl. CCS2 / Type 2 IEC 62196-1:2022 — webstore publication record 2026-09-21
ISO 15118 (high-level communication, Plug & Charge) Vehicle-to-grid communication interface ISO 15118-1:2019 — ISO catalogue page 2026-09-21
UN Manual of Tests (UN R100 for electric powertrain) Type-approval framework relevant to the EV side UNECE — Vehicle Regulations portal 2026-09-21
Australia — ACMA equipment authorisation (EVSE-specific instrument) Supplier registration and labelling under the equipment-authorisation rules ACMA — Equipment authorisation 2026-09-21
Australia — EESS (Electrical Equipment Safety Scheme) regulatory instrument for EVSE In-scope electrical equipment safety, registration of responsible suppliers EESS — scheme portal 2026-09-21
AS/NZS 3000 (Wiring Rules) Site installation of EVSE in Australia Standards Australia — Australian standards overview 2026-09-21
Australian Border Force — Working Tariff (specific national-line query) HS national line for "Electric vehicle charging stations / static converters" on the day of entry ABF — Tariff classification (Working Tariff) 2026-09-21
EU TARIC reference (for cross-checking EU export classification) EU TARIC database entry for comparable heading European Commission — TARIC consultation 2026-09-21
USITC HTS reference (for cross-checking US export classification) US Harmonized Tariff Schedule entry for comparable heading USITC — Harmonized Tariff Schedule 2026-09-21
ATO — GST on imported goods GST treatment of taxable importations into Australia ATO — GST on imported goods 2026-09-21
EUR-Lex reference for EU-side conformity framework EU regulatory context for the charger as an exported good EUR-Lex — portal 2026-09-21
ComponentRateSpecific source-of-truth URL
Customs dutyPENDING — query the Working Tariff on the day of entryABF — Tariff classification
GST on taxable importationPENDING — current rate from ATO at the time of entryATO — GST on imported goods
EVSE-specific safety registration (RCM / EESS)PENDING — confirm in-scope status with the regulatorEESS — scheme portal

6. Logistics & Incoterms

7. Request Quote — replies in 48 hours

Server-side validation is enforced at /api/rfq regardless of the required attributes shown above. Submitting this form does not constitute a purchase order. A binding landed-cost estimate requires validated inputs and a binding OEM quotation.

8. Frequently asked questions

What HS code applies to a 180 kW DC EV charger imported into Australia?

The Australian Border Force Working Tariff must be queried with the exact HS national line at the time of import; this page marks the line PENDING until a current lookup is recorded by a licensed broker.

Is RCM required for an EVSE placed on the Australian market?

Electrical products supplied in Australia generally require RCM evidence of compliance with applicable ACMA / EESS rules; the specific EVSE scheme and acceptable evidence should be confirmed with the regulator prior to supply.

What is the indicative payback for a logistics-park 180 kW DC charger?

The scenario gives a simple payback of 1.99 years, a discounted payback of 2.26 years, and an NPV of USD 376,641.50 over a 25-year horizon at 8.00% discount. These are scenario outputs, not a quote.

Does IEC 61851-1 / IEC 62196 apply to this product?

IEC 61851-1 and IEC 62196 are the common international references for DC EVSE; the Australian-adopted edition must be verified at procurement against the OEM's test dossier.

Can Tradvolt publish a fixed landed-cost number?

No fixed number is published on this generic template. The duty rates, GST and shipping surcharges change; the OEM quote is binding only after the RFQ is returned.

Which Incoterm is recommended for first-time AU imports?

CIP Port of Destination is a practical starting point — the exporter retains freight and insurance responsibility up to the AU port while you keep local customs clearance, GST input recovery and last-mile logistics in your control.


Claim register

#ClaimSpecific document URLAccessed
1Customs duty rate and HS national line for EVSE at the time of import are obtained from the ABF Working Tariff.ABF — Tariff classification2026-09-21
2Electrical products supplied in Australia generally require RCM evidence under the EESS / ACMA regulatory framework; the specific EVSE scheme must be confirmed with the regulator.EESS — scheme portal2026-09-21
3Site installation of EVSE in Australia is governed by AS/NZS 3000 (Wiring Rules); installer qualification is a state/territory matter.Standards Australia — overview2026-09-21
4International reference standards for DC EV charging systems are IEC 61851-1, IEC 61851-23, IEC 61851-24 and IEC 62196 series; ISO 15118 covers high-level communication.IEC 61851-1:20172026-09-21
5GST on taxable importations into Australia is administered by the Australian Taxation Office.ATO — GST on imported goods2026-09-21
6For cross-checking export-side classification, the EU TARIC database and the USITC HTS schedule are the official sources.EC — TARIC consultation2026-09-21
7JAS-ANZ accreditation is the Australian reference for bodies operating conformity assessment schemes.JAS-ANZ2026-09-21
8UN Manual of Tests and Regulations (UNECE) provides the type-approval framework relevant to the EV side (e.g., UN R100).UNECE — Vehicle Regulations2026-09-21

© Tradvolt — generic reference template. Not legal, tax or engineering advice. Verify all inputs with qualified advisors before procurement.