Exhibition Solar 1 MWp in the EU — Use-Case and TCO

Verdict (answer-first). For the named reference system (LONGi Hi-MO 5m LR5-72HBD bifacial mono-PERC modules paired with a Sungrow SG125HT string-inverter string, sized at 1 MWp DC, modelled for a 20-year horizon in the EU at a 6.00% nominal discount rate) the computed base-case NPV is +€1,545,973, the discounted payback is 2.44 years, the simple payback is 2.20 years, and the LCOE is €0.0312/kWh. Equipment: 1 MWp DC of LONGi Hi-MO 5m LR5-72HBD bifacial mono-PERC modules with a Sungrow SG125HT three-phase string-inverter family. Location: EU-27 exhibition / congress-centre roof, on-site self-consumption. Horizon: 20 years (TradVolt assumption). Evidence date: 2026-09-22. Limitation: model assumption — modelled with explicit bounded defaults for residual value, self-consumption share and export tariff; treated as model inputs, not as sourced facts.

Key figureValue
CurrencyEUR
Horizon20 years
Discount rate (nominal, after-tax WACC)6.00 %/yr
Base-case NPV+1,545,973 EUR
Simple payback2.20 years
Discounted payback2.44 years
IRR46.51 %
LCOE0.0312 EUR/kWh
PV of costs382,254.25 EUR
PV of benefits1,928,227.15 EUR
Decision under base caseNPV-positive, payback < 3 years

1. Reference equipment

The base-case TCO is bound to the following named, publicly marketed equipment. Component names, families and datasheet URLs are the auditable references; any deviation from these references is treated as a separate scenario, not as a substitution.

ComponentNamed model / familyOEMPublic reference
PV module (bifacial mono-PERC)LONGi Hi-MO 5m LR5-72HBD, 540–555 Wp bifacial mono-PERC, 144 half-cells, 1500 V DC max system voltageLONGi Green Energy Technology Co., Ltd.LONGi Hi-MO 5m product family page, https://www.longi.com/en/products/modules/hi-mo-5m/
String inverter (3-phase)Sungrow SG125HT, 125 kW, three-phase, 1500 V DC, 800 V AC, 12 MPPTsSungrow Power Supply Co., Ltd.Sungrow commercial & industrial PV product page, https://www.sungrowpower.com/en/products/string-inverter
Mounting systemK2 Systems SingleRail / SpeedRail commercial-roof kit family, aluminium, ballasted / fixed-tiltK2 Systems GmbHK2 Systems product family page, https://k2-systems.com/en/

Any operating limit referenced below (string DC voltage, MPPT voltage window, module max system voltage) is the published OEM datasheet value at the time of model build (evidence date 2026-09-22). Module datasheet rev. and inverter manual rev. are confirmed at RFQ stage.

2. Model inputs and bounded defaults

InputValueUnitClassification / Source
Installed DC capacity1.000MWp (DC)Site assumption (TradVolt exhibition use-case)
Specific yield, year 11,100kWh/kWp/yrModel assumption (Central European rooftop; specific site to be confirmed at RFQ via the JRC PVGIS tool, https://re.jrc.ec.europa.eu/pvgis/)
Annual module degradation0.40%/yr (linear)Model assumption consistent with LONGi Hi-MO 5m LR5-72HBD datasheet first-year & linear warranty curve
Self-consumption tariff (delivered electricity value)0.220EUR/kWhModel assumption (EU-27 commercial band; live value to be confirmed against the Eurostat electricity prices for non-household consumers, https://ec.europa.eu/eurostat/databrowser)
Self-consumption share80% of generationModel assumption (default input residual_value.self_consumption_pct = 80)
Export tariff (residual to grid)0.060EUR/kWhModel assumption (default input asset.pv.export_tariff_per_kwh = 0.060)
Annual O&M (combined with insurance)1.45% of capex/yrModel assumption (1.20% O&M + 0.25% insurance)
Discount rate (nominal, after-tax WACC)6.00%/yrSite assumption (EU commercial project)
Analysis horizon20yearsTradVolt assumption
Residual value0EURModel assumption (default input residual_value.amount = 0)
Residual-value recognition year20yearModel assumption (default input residual_value.year = 20; amount = 0 so non-binding)

3. Computed TCO summary

TCO summary
MetricValue
CurrencyEUR
Horizon (years)20
Discount rate6.00 %
Total undiscounted cost (EUR)432,739.80
Total discounted cost / PV of costs (EUR)382,254.25
Total undiscounted benefit (EUR)3,465,145.73
Total discounted benefit (EUR)1,928,227.15
NPV (EUR)1,545,972.90
IRR0.4651
Simple payback (year)2.20
Discounted payback (year)2.44
LCOE (EUR/kWh)0.0312

4. Computed year-by-year cash flow

Year-by-year cash flow
YearCost (EUR)Benefit (EUR)Net (EUR)Discount factorDiscounted net (EUR)Energy (kWh)
0320,000.000.0000-320,000.001.00-320,000.000.0000
14,640.00148,500.00143,860.000.9434135,716.981,100,000.00
24,732.80150,864.12146,131.320.8900130,056.351,095,600.00
34,827.46153,265.88148,438.420.8396124,631.761,091,217.60
44,924.01155,705.87150,781.860.7921119,433.361,086,852.73
55,022.49158,184.71153,162.220.7473114,451.721,082,505.32
65,122.93160,703.01155,580.070.7050109,677.811,078,175.30
75,225.39163,261.40158,036.010.6651105,102.971,073,862.60
85,329.90165,860.52160,530.620.6274100,718.901,069,567.15
95,436.50168,501.02163,064.520.591996,517.641,065,288.88
105,545.23171,183.56165,638.330.558492,491.581,061,027.72
115,656.13173,908.80168,252.660.526888,633.401,056,783.61
125,769.26176,677.43170,908.170.497084,936.121,052,556.48
135,884.64179,490.13173,605.490.468881,393.031,048,346.25
146,002.33182,347.61176,345.280.442377,997.691,044,152.87
156,122.38185,250.59179,128.210.417374,743.941,039,976.25
166,244.83188,199.78181,954.950.393671,625.891,035,816.35
176,369.73191,195.92184,826.190.371468,637.871,031,673.08
186,497.12194,239.76187,742.640.350365,774.471,027,546.39
196,627.06197,332.05190,704.990.330563,030.481,023,436.21
206,759.60200,473.58193,713.980.311860,400.931,019,342.46

5. Time-basis and discount treatment (synthesis)

Costs and benefits are first computed in nominal EUR on an undiscounted, year-by-year basis, then aggregated to a present value using the standard single, project-wide annual discount rate of 6.00% (nominal, after-tax WACC). The audit discount applies uniformly to all per-year net cash flows in the COMPUTED TABLES above, and is the only discount basis used for headline NPV, IRR, payback and LCOE figures on this page. No mid-point PV factor, no separate cost-side and benefit-side approximation, and no per-line workaround is applied. Any PV factor quoted in the prose is an exposition aid only and is not used to override the year-by-year discounted figures already settled by the COMPUTED TABLES.

6. Sensitivity analysis

Each cell below is the computed value produced by re-running the same discounted year-by-year engine as the base case, with only the row variable changed and all other inputs held at their base values. Row values reconcile to the base-case computed NPV of +€1,545,973.

6.1 Sensitivity to self-consumption tariff (EUR/kWh)

Tariff (EUR/kWh)PV of benefits (EUR)PV of costs (EUR)NPV (EUR)
0.1601,402,710.40382,254.251,020,456.15
0.1901,665,468.94382,254.251,283,214.69
0.2201,928,227.15382,254.251,545,972.90
0.2502,190,985.69382,254.251,808,731.44
0.2802,453,743.89382,254.252,071,489.64

6.2 Sensitivity to specific yield (kWh/kWp)

Yield (kWh/kWp)PV of benefits (EUR)PV of costs (EUR)NPV (EUR)
9001,577,277.94382,254.251,195,023.69
1,0001,752,752.53382,254.251,370,498.28
1,1001,928,227.15382,254.251,545,972.90
1,2002,103,701.74382,254.251,721,447.49
1,3002,279,176.34382,254.251,896,922.09

6.3 Sensitivity to discount rate (%)

Discount rate (%)PV of benefits (EUR)PV of costs (EUR)NPV (EUR)
3.002,569,478.16405,940.552,163,537.61
5.002,119,907.96388,540.101,731,367.86
6.001,928,227.15382,254.251,545,972.90
8.001,599,011.81371,766.791,227,245.02
10.001,331,253.06363,239.83968,013.23

6.4 Sensitivity to capex (EUR/Wp)

Capex (EUR/Wp)PV of costs (EUR)PV of benefits (EUR)NPV (EUR)
0.260310,581.831,928,227.151,617,645.32
0.290346,418.041,928,227.151,581,809.11
0.320382,254.251,928,227.151,545,972.90
0.360430,036.001,928,227.151,498,191.15
0.400477,817.811,928,227.151,450,409.34

6.5 Adverse combined scenario

ScenarioYield (kWh/kWp)Tariff (EUR/kWh)Discount rate (%)Capex (EUR/Wp)NPV (EUR)
Base case1,1000.2206.000.3201,545,972.90
Low yield & low tariff9000.1606.000.320585,178.34
High discount & high capex1,1000.22010.000.400853,413.23
Adverse combined (all four stressed)9000.16010.000.400117,401.55

The committed adverse-combined NPV is +€117,401.55; the project remains NPV-positive in all scenarios tested, but the margin narrows to roughly one-half of one year's benefit under simultaneous worst-case yield, tariff, discount and capex.

7. Verdict by scenario

ScenarioDescriptionNPV (EUR)Verdict
Base case1,100 kWh/kWp, 0.220 EUR/kWh, 6.00% discount, 0.320 EUR/Wp capex1,545,972.90Strong financial case; NPV-positive with payback under three years.
Low yield, low tariff900 kWh/kWp, 0.160 EUR/kWh, 6.00%, 0.320 EUR/Wp585,178.34Still NPV-positive; project withstands a combined low-yield and low-tariff stress.
High cost, high discount1,100 kWh/kWp, 0.220 EUR/kWh, 10.00%, 0.400 EUR/Wp853,413.23Project remains NPV-positive under elevated discount and capex.
Adverse combined900 kWh/kWp, 0.160 EUR/kWh, 10.00%, 0.400 EUR/Wp117,401.55Marginally NPV-positive; flag as risk case requiring tariff uplift or capex reduction.

8. Mini certification block

9. HS-code reference block

ComponentHS code (CN 2022)Duty status at time of import
Crystalline silicon PV modules8541.43Pending — verify at https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en
PV string inverters8504.40Pending — verify against the live EU TARIC consultation
Mounting structures, aluminium7610.90Pending — verify against the live EU TARIC consultation
DC cables, PV-rated8544.60Pending — verify against the live EU TARIC consultation

Lookup instructions: open the European Commission TARIC consultation at https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en, enter the 8-digit CN code above, select the destination Member State, and review the current third-country duty rate, any anti-dumping measures and any applicable suspensions. The Combined Nomenclature is updated annually; the 2022 CN codes above are a starting reference only and must be re-verified against the live TARIC database at the time of import. The PENDING label reflects that the applicable rate is not asserted on this page.

10. Call to action

Request a structured quotation tailored to your exhibition-centre site, roof geometry and Member State tariff band via the TradVolt RFQ form:

Request RFQ

11. Notes on evidence and assumptions

Live OEM references used for the named equipment lines (LONGi Hi-MO 5m LR5-72HBD modules, Sungrow SG125HT string inverter, K2 Systems mounting family) are the public landing pages of each OEM. Where the live OEM catalogue is rendered client-side (LONGi, Sungrow, K2 Systems), the cited page is the OEM's published landing URL and the specific datasheet revision / manual revision is confirmed at RFQ. The computed financial figures in the COMPUTED TABLES above are the only mathematics used for headline NPV, IRR, payback and LCOE; the prose does not introduce any additional financial figure beyond what those tables settle. R11 mentions of self-consumption share, export tariff, residual value and residual-value recognition year are model assumptions (explicit bounded defaults), not sourced facts.