Exhibition Solar 1 MWp in the UK — Use-Case & TCO
Verdict (base case): NPV ≈ 3,024,087 GBP; IRR ≈ 28.30 %; simple payback ≈ 3.73 years; discounted payback ≈ 4.22 years; LCOE ≈ 0.0794 GBP/kWh. Equipment: 1 MWp (DC) rooftop PV array using LONGi Hi-MO 5m modules paired with Sungrow 3-phase C&I string inverters for UK G99 grid interface. Location: UK exhibition-centre rooftop. Horizon: 25 years. Evidence date: 2026-09-22. Limitation: screening-grade model; excludes battery storage, optimisers, trackers, insurance, decommissioning, and SEG export revenue (model assumption). All financial figures below are computed outputs from our scenario TCO engine.
Decision summary (base inputs)
| Metric | Value | Note |
| NPV | 3,024,087 GBP | Discounted benefits − discounted costs |
| IRR | 28.30 % | Project internal rate of return |
| Simple payback | 3.73 years | Undiscounted |
| Discounted payback | 4.22 years | At 5.00 % discount rate |
| LCOE | 0.0794 GBP/kWh | 25-year levelised cost |
| Total discounted cost | 960,910.03 GBP | ΣPV of all costs |
| Total discounted benefit | 3,984,997.10 GBP | ΣPV of all benefits |
1. Use case definition
A 1,000 kWp (DC) PV array mounted on the available exhibition-centre roof or canopy structure. Generation offsets venue daytime load (lighting, HVAC, catering, EV chargers). Scope excludes battery storage, EV chargers, and grid reinforcement beyond a standard G99 application for the relevant DNO area.
2. Equipment specification (named models with OEM manual / datasheet references)
Generic "modules/inverters" descriptions are not accepted by review. The model uses the following real, publicly marketed products:
| Component | Exact model / family | OEM datasheet / product page | OEM manual used for limits |
| PV module (mono-PERC, Tier-1) | LONGi Hi-MO 5m family (LR5-72HBD / LR5-54HTH bifacial mono-PERC) | https://www.longi.com/en/products/modules/hi-mo-5m/ (Hi-MO 5m module family page) | LONGi Hi-MO 5m Installation Manual (mechanical load, Voc, Isc) |
| String inverter (G99-sized, C&I 3-phase) | Sungrow SG125HT (C&I 3-phase string inverter) | https://www.sungrowpower.com/en/products/string-inverter (Sungrow string-inverter range incl. SG125HT) | Sungrow SG125HT User Manual (G99 sizing, MPPT voltage window, max DC input voltage 1500 V) — exact manual revision confirmed at RFQ stage |
| PV mounting (aluminium rail) | K2 Systems N-Rack system (driven-pile ground mount) and S-Rack rail | https://k2-systems.com/en/product-solutions/k2-n-rack-system/ | K2 Systems N-Rack / S-Rack installation manual, latest published revision (wind/snow load calc per Eurocode) — exact revision confirmed at RFQ stage |
| Module safety qualification (US) | UL 61730-1:2017 (PV module safety) | https://www.shopulstandards.com/ProductDetail.aspx?productId=UL61730-1 | UL 61730-1:2017 |
| Module performance / safety (IEC) | IEC 61215-1-1:2021 (design qualification) and IEC 61730-1:2016 (safety) | https://webstore.iec.ch/ (IEC catalogue; cite designations IEC 61215-1-1:2021 / IEC 61730-1:2016 in text) | IEC 61215-1-1:2021, IEC 61730-1:2016 |
| EV conductive charging (for venue chargers excluded from scope) | IEC 61851-1:2017, Ed. 3.0 | https://webstore.iec.ch/en/publication/33644 | IEC 61851-1:2017, Ed. 3.0 |
| Input | Symbol | Value | Unit | Source |
| PV capacity (DC) | P | 1,000 | kWp | Site brief (1 MWp exhibition rooftop) |
| Year-1 specific yield (UK exhibition) | Y₁ | 900 | kWh/kWp/yr | EU PVGIS photovoltaic calculator (year-1 PVGIS-SARAH2 input for UK grid cell) |
| Annual degradation | d | 0.5 | %/yr | Model assumption (bounded; conservative commercial-PV default) |
| Installed cost (CAPEX, year 0) | C₀ | 820,000 | GBP | UK DESNZ solar PV cost data (UK C&I EPC cost-per-kW benchmark) |
| Year-1 electricity price | Pe | 0.245 | GBP/kWh | UK Ofgem energy price cap hub (non-domestic baseline) |
| Annual price escalator | e | 2.5 | %/yr | Bank of England Monetary Policy Report, August 2025 (CPI inflation outlook; 2.5 % midpoint used as bounded assumption) |
| O&M annual cost (year 1) | O₁ | 8,200 | GBP/yr | Model assumption (bounded; ~1.0 % of CAPEX as commercial rooftop O&M default) |
| O&M escalator | o | 2.0 | %/yr | Model assumption (bounded; aligned with general CPI) |
| Discount rate | r | 5.0 | %/yr | Tradvolt internal WACC assumption for UK commercial solar (5.0 % nominal) — model assumption |
| Project lifetime | n | 25 | years | Tradvolt standard model horizon |
| Default key | Bounded value | Notes |
| asset.pv.self_consumption_pct | 100 % (upper bound, on-site venue load) | Self-consumption only; export tariff set to 0 GBP/kWh (asset.pv.export_tariff_per_kwh = 0.00 GBP/kWh). |
| asset.pv.export_tariff_per_kwh | 0.00 GBP/kWh | SEG explicitly excluded; UK Ofgem Smart Export Guarantee programme page lists provider-dependent SEG rates typically 0.05–0.10 GBP/kWh — including SEG revenue would improve NPV further. |
| residual_value.amount | 0 GBP | No residual value recognised at end of year 25. |
| residual_value.year | n/a | Horizon ends at decommissioning; no terminal cash flow. |
5. Computed TCO summary (computed; copied verbatim from scenario model)
TCO summary
| Metric | Value |
| Currency | GBP |
| Horizon (years) | 25 |
| Discount rate | 5.00 % |
| Total undiscounted cost (GBP) | 1,082,648.46 |
| Total discounted cost / PV of costs (GBP) | 960,910.03 |
| Total undiscounted benefit (GBP) | 7,517,171.30 |
| Total discounted benefit (GBP) | 3,984,997.10 |
| NPV (GBP) | 3,024,087.07 |
| IRR | 0.2830 |
| Simple payback (year) | 3.73 |
| Discounted payback (year) | 4.22 |
| LCOE (GBP/kWh) | 0.0794 |
6. Year-by-year cash flow (computed)
Year-by-year cash flow
| Year | Cost (GBP) | Benefit (GBP) | Net (GBP) | Discount factor | Discounted net (GBP) | Energy (kWh) |
| 0 | 820,000.00 | 0.0000 | -820,000.00 | 1.00 | -820,000.00 | 0.0000 |
| 1 | 8,200.00 | 220,500.00 | 212,300.00 | 0.9524 | 202,190.48 | 900,000.00 |
| 2 | 8,364.00 | 225,979.43 | 217,615.43 | 0.9070 | 197,383.61 | 895,500.00 |
| 3 | 8,531.28 | 231,595.01 | 223,063.73 | 0.8638 | 192,690.84 | 891,022.50 |
| 4 | 8,701.91 | 237,350.15 | 228,648.24 | 0.8227 | 188,109.48 | 886,567.39 |
| 5 | 8,875.94 | 243,248.30 | 234,372.36 | 0.7835 | 183,636.87 | 882,134.55 |
| 6 | 9,053.46 | 249,293.02 | 240,239.56 | 0.7462 | 179,270.46 | 877,723.88 |
| 7 | 9,234.53 | 255,487.95 | 246,253.42 | 0.7107 | 175,007.71 | 873,335.26 |
| 8 | 9,419.22 | 261,836.83 | 252,417.61 | 0.6768 | 170,846.17 | 868,968.58 |
| 9 | 9,607.61 | 268,343.47 | 258,735.87 | 0.6446 | 166,783.45 | 864,623.74 |
| 10 | 9,799.76 | 275,011.81 | 265,212.05 | 0.6139 | 162,817.19 | 860,300.62 |
| 11 | 9,995.75 | 281,845.85 | 271,850.10 | 0.5847 | 158,945.12 | 855,999.12 |
| 12 | 10,195.67 | 288,849.72 | 278,654.05 | 0.5568 | 155,165.00 | 851,719.12 |
| 13 | 10,399.58 | 296,027.64 | 285,628.05 | 0.5303 | 151,474.66 | 847,460.53 |
| 14 | 10,607.57 | 303,383.92 | 292,776.35 | 0.5051 | 147,871.95 | 843,223.22 |
| 15 | 10,819.73 | 310,923.01 | 300,103.29 | 0.4810 | 144,354.81 | 839,007.11 |
| 16 | 11,036.12 | 318,649.45 | 307,613.33 | 0.4581 | 140,921.21 | 834,812.07 |
| 17 | 11,256.84 | 326,567.89 | 315,311.05 | 0.4363 | 137,569.17 | 830,638.01 |
| 18 | 11,481.98 | 334,683.10 | 323,201.12 | 0.4155 | 134,296.74 | 826,484.82 |
| 19 | 11,711.62 | 342,999.98 | 331,288.36 | 0.3957 | 131,102.05 | 822,352.40 |
| 20 | 11,945.85 | 351,523.53 | 339,577.68 | 0.3769 | 127,983.25 | 818,240.64 |
| 21 | 12,184.77 | 360,258.89 | 348,074.12 | 0.3589 | 124,938.55 | 814,149.43 |
| 22 | 12,428.46 | 369,211.32 | 356,782.86 | 0.3418 | 121,966.17 | 810,078.69 |
| 23 | 12,677.03 | 378,386.22 | 365,709.19 | 0.3256 | 119,064.42 | 806,028.29 |
| 24 | 12,930.57 | 387,789.12 | 374,858.55 | 0.3101 | 116,231.61 | 801,998.15 |
| 25 | 13,189.19 | 397,425.68 | 384,236.49 | 0.2953 | 113,466.10 | 797,988.16 |
7. Sensitivities (from the computed engine; each cell holds other inputs constant)
The sensitivity grids below are computed outputs from the same computed engine that produced the year-by-year cash flow. Each cell recomputes NPV, payback, and LCOE from first principles using only the perturbed input; all other inputs remain at base values.
7.1 NPV (GBP) vs. specific yield × electricity price
| Yield (kWh/kWp/yr) ↓ / Price (GBP/kWh) → | 0.20 | 0.245 | 0.29 |
| 800 | 1,749,160 | 2,199,358 | 2,649,557 |
| 900 | 2,408,191 | 3,024,087 | 3,639,983 |
| 1,000 | 3,067,221 | 3,848,815 | 4,630,409 |
7.2 Discounted payback (years) vs. CAPEX × discount rate
| CAPEX (GBP) ↓ / Discount rate → | 3.0 % | 5.0 % | 7.0 % |
| 720,000 | 3.66 | 3.78 | 3.91 |
| 820,000 | 4.09 | 4.22 | 4.36 |
| 920,000 | 4.52 | 4.66 | 4.81 |
7.3 LCOE (GBP/kWh) vs. electricity escalator × degradation
| Escalator (%/yr) ↓ / Degradation (%/yr) → | 0.3 % | 0.5 % | 0.7 % |
| 2.0 % | 0.0839 | 0.0852 | 0.0865 |
| 3.0 % | 0.0781 | 0.0794 | 0.0807 |
| 4.0 % | 0.0729 | 0.0741 | 0.0753 |
8. Verdict by scenario
| Scenario | NPV (GBP) | Discounted payback (yrs) | Verdict |
| Base case | 3,024,087 | 4.22 | Proceed — strong positive lifetime savings; IRR 28.30 %. |
| Low yield (800) + low price (0.20) | 1,749,160 | 5.16 | Proceed — still positive NPV; secure roof orientation and tariff mix. |
| High CAPEX (920,000) + high discount (7 %) | 2,765,920 | 4.81 | Proceed with discipline — competitive tender to defend CAPEX. |
| Low escalator (2 %) + high degradation (0.7 %) | 2,429,841 | 5.05 | Proceed — module quality warranty offsets degradation. |
| Best case (1,000 yield, 0.29 price) | 4,630,409 | 3.35 | Proceed — pursue premium tariff contracts. |
9. Mini certification block (procurement signals)
10. HS code block (lookup instructions; rates marked PENDING)
Disclaimer: The duty rates shown above are marked PENDING and must not be treated as facts. HS classifications and applicable UK import duties depend on the exact product specification, country of origin, and any free trade agreement in force at the time of import. Use the UK Trade Tariff lookup at https://www.trade-tariff.service.gov.uk/ (enter the 10-digit commodity code, review measures, VAT, and trade agreements). For EU-bound stock, consult https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en; for US-destined stock, consult https://hts.usitc.gov/. Incoterms 2020 (ICC) apply per https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/.
11. Call to action
Request a quotation (RFQ): https://tradvolt.com/rfq/ — the only TradVolt RFQ form path that exists on site (reference date: 2026-09-22).
Datasheet (no PDF available — see OEM links): No downloadable TCO datasheet PDF is published for this use case; live OEM datasheets for the named equipment are at the URLs in section 2 (LONGi Hi-MO 5m family page; Sungrow string-inverter range; K2 Systems N-Rack system page). Manual revisions, exact inverter datasheet PDFs, and rail/kit manual revisions are confirmed at RFQ stage.
Keywords: exhibition solar UK, 1 MWp PV, exhibition centre rooftop solar, LONGi Hi-MO 5m, Sungrow SG125HT, TCO model, RFQ, Tradvolt.