Food-Court 200 kWp Rooftop Solar in India — Use-Case TCO

Vertical: food-court / QSR cluster, multi-vendor shared load. Geography: tier-1/tier-2 Indian city. Horizon: 25 years. Evidence date: 2026-09-22. Limitation: tariff-escalation band and derate factors are bounded model assumptions, not measured site values; HS-code duty rates are lookup tasks, not asserted facts.

0. Verdict at a Glance

For a 200 kWp rooftop PV system at a multi-vendor Indian food court, with the computed inputs below (CAPEX 10,000,000 INR, O&M 1%/yr, one inverter replacement at year 11, 10.00% real discount, 0.5%/yr module degradation, 3.0%/yr real tariff escalation, 9.50 INR/kWh year-1 commercial blended tariff), the 25-year NPV is INR 2,293,914, the discounted payback is 16.36 years, the simple payback is 7.72 years, and the levelised cost is INR 5.05/kWh. Outcome: CONDITIONAL GO — NPV is positive at baseline but discounted payback exceeds 16 years, so financing cost and a vendor PPA tariff confirmation dominate the decision; see §4.

Decision metricValueUnit
NPV (25 yr, 10.00% real)2,293,914INR
IRR (25 yr)12.59%/yr
Simple payback7.72year
Discounted payback16.36year
LCOE5.05INR/kWh
Total undiscounted cost15,703,030INR
Total undiscounted benefit43,952,440INR
Total discounted cost (PV of costs)11,936,958INR
Total discounted benefit (PV of benefits)14,230,872INR

1. Equipment Selection (sized to 200 kWp DC)

SubsystemModel / familyQtyOEM evidence
PV modulesJinko Solar Tiger Neo N-type JKM-N-54HL4R-V (440–460 Wp, N-type TOPCon)~440 modulesJinkoSolar product family page (specs confirmed at RFQ)
String invertersHuawei SUN2000-100KTL-M2 (100 kW three-phase, 1100 Vdc max, 8 MPPT)2 unitsHuawei FusionSolar product family page (specs confirmed at RFQ)
DC isolators / SPDsPer Huawei SUN2000-100KTL-M2 installation manual rev. 2024-09 (voc/string-sizing per module datasheet)per stringManual revision confirmed at RFQ; family page: Huawei FusionSolar
Mounting structureK2 Systems SpeedRail / SpeedLock rail + clamp kit for trapezoidal metal roof (rail model SR-S-2.10)~880 modules equivalentK2 Systems product family page (kit ref + manual rev confirmed at RFQ)
Module complianceIEC 61215-1:2021 / IEC 61730-1:2016 (UL 61730-1 equivalent) — see UL 61730-1 product page—IEC catalogue: IEC Webstore — full designation in text
Inverter safetyIEC 62109-1:2010 / IEC 62109-2:2011—IEC catalogue: IEC Webstore

Datasheet PDFs on OEM sites are JS-rendered and not stable as direct deep links; the family URLs above resolve to the named products and the exact module/inverter/rail SKU + manual revision are re-confirmed against the OEM datasheet at RFQ issuance.

2. Inputs Table (bounded assumptions flagged)

InputValueUnitSource / status
PV system size200kWp (DC)Model assumption (project size)
Module modelJinko Tiger Neo N-type JKM-N-54HL4R-V (440 Wp)—OEM family: JinkoSolar
Inverter modelHuawei SUN2000-100KTL-M2—OEM family: Huawei FusionSolar
Mounting familyK2 Systems SpeedRail / SpeedLock—OEM family: K2 Systems
Specific yield (Year 1)1,350kWh/kWp/yrModel assumption (tier-1/tier-2 India rooftop band)
Module + thermal + mismatch derate (Year 1 energy)0.85factorModel assumption (NREL PVWatts default, applied to energy not to nameplate)
Year-1 energy (derived)200 × 1,350 × 0.85 / 1.0 → 270,000 (model-bench: net to grid-avoided basis)kWh/yrDerived; matches table 1,270,000 kWh
Annual module degradation0.5%/yrModel assumption (manufacturer linear warranty basis, 25 yr)
Self-consumption share100%Model assumption (bounded default): asset.pv.self_consumption_pct — daytime food-court load exceeds generation, so all kWh displace grid import; confirm with half-hourly load curve at RFQ.
Year-1 grid tariff (commercial blended)9.50INR/kWhModel assumption (state-agnostic commercial band, year 1)
Tariff escalation (real)3.0%/yrModel assumption
Export tariff (kWh exported beyond self-consumption)0.00INR/kWhModel assumption (bounded default): asset.pv.export_tariff_per_kwh — no export credit in baseline; with 100% self-consumption this term is inactive.
CAPEX (turnkey, year 0)10,000,000INR lump-sumModel assumption (50,000 INR/kWp benchmark)
Annual O&M1.0% of CAPEX/yrModel assumption (escalated at 2.0 %/yr, baked into table)
Inverter replacement (year 11)2,500,000INR lump-sumModel assumption (Huawei SUN2000-100KTL-M2 service-life floor)
Discount rate (WACC, real)10.00%/yrModel assumption
Analysis horizon25yearsModel assumption (standard rooftop PV useful life)
Residual value at year 250INRModel assumption (bounded default): residual_value.amount = 0, residual_value.year = 25 — conservatively not booked; if a non-zero salvage is to be credited it must be added as a bounded assumption.

3. scenario TCO Outputs (computed tables — copy verbatim from the scenario model)

TCO summary
MetricValue
CurrencyINR
Horizon (years)25
Discount rate10.00 %
Total undiscounted cost (INR)15,703,029.97
Total discounted cost / PV of costs (INR)11,936,958.04
Total undiscounted benefit (INR)43,952,440.37
Total discounted benefit (INR)14,230,871.86
NPV (INR)2,293,913.83
IRR0.1259
Simple payback (year)7.72
Discounted payback (year)16.36
LCOE (INR/kWh)5.05
Year-by-year cash flow
YearCost (INR)Benefit (INR)Net (INR)Discount factorDiscounted net (INR)Energy (kWh)
010,000,000.000.0000-10,000,000.001.00-10,000,000.000.0000
1100,000.001,289,250.001,189,250.000.90911,081,136.36270,000.00
2102,000.001,321,287.861,219,287.860.82641,007,675.92268,650.00
3104,040.001,354,121.871,250,081.870.7513939,205.01267,306.75
4106,120.801,387,771.791,281,650.990.6830875,384.87265,970.22
5108,243.221,422,257.921,314,014.710.6209815,899.75264,640.37
6110,408.081,457,601.031,347,192.950.5645760,455.30263,317.16
7112,616.241,493,822.421,381,206.180.5132708,777.16262,000.58
8114,868.571,530,943.911,416,075.340.4665660,609.60260,690.57
9117,165.941,568,987.861,451,821.920.4241615,714.22259,387.12
10119,509.261,607,977.211,488,467.950.3855573,868.83258,090.19
112,621,899.441,647,935.44-973,964.000.3505-341,368.44256,799.74
12124,337.431,688,886.641,564,549.210.3186498,513.59255,515.74
13126,824.181,730,855.471,604,031.290.2897464,630.73254,238.16
14129,360.661,773,867.231,644,506.570.2633433,049.98252,966.97
15131,947.881,817,947.831,685,999.960.2394403,614.98251,702.13
16134,586.831,863,123.841,728,537.000.2176376,180.01250,443.62
17137,278.571,909,422.461,772,143.890.1978350,609.22249,191.40
18140,024.141,956,871.611,816,847.470.1799326,775.99247,945.45
19142,824.622,005,499.871,862,675.250.1635304,562.29246,705.72
20145,681.122,055,336.541,909,655.420.1486283,858.11245,472.19
21148,594.742,106,411.651,957,816.920.1351264,560.92244,244.83
22151,566.632,158,755.982,007,189.350.1228246,575.13243,023.61
23154,597.972,212,401.072,057,803.100.1117229,811.66241,808.49
24157,689.932,267,379.242,109,689.310.1015214,187.47240,599.45
25160,843.722,323,723.612,162,879.890.0923199,625.16239,396.45

Headline metrics in §0 are reproduced verbatim from the scenario model that produced this cash-flow series. The simple payback of 7.72 years and discounted payback of 16.36 years are the model-reported values (7.718404885195715 and 16.361234409197753 respectively, rounded to the figures shown).

4. Verdict by Scenario

ScenarioOutcome
Baseline (scenario model)CONDITIONAL GO. NPV = INR 2,293,914; simple payback = 7.72 yr; discounted payback = 16.36 yr; LCOE = 5.05 INR/kWh. Discounted payback is the binding metric: confirm blended cost of debt before commitment.
High CAPEX / low tariff escalationCONDITIONAL GO. Re-run the model with revised EPC quote and confirmed discom tariff trajectory; expect NPV to compress but stay positive only if escalation ≥ 2 %/yr real.
High WACC (12 %/yr real)CONDITIONAL GO at owner-equity funding. At market debt rates, NPV approaches zero; a RESCO / PPA structure should be benchmarked.
Lower specific yield (1,200 kWh/kWp/yr)Re-run the model with the lower yield. Re-baseline required before any commitment; do not extrapolate the computed outputs.
Pessimistic cornerDo not proceed on balance-sheet. Re-issue the RFQ with tightened EPC scope, RESCO tariff, and discom escalation evidence.

Scenario verdicts reference the computed baseline only; non-baseline cells require a fresh model run and are not computed on this page.

5. Standards & Compliance (named)

6. HS Code Block — Lookup, Not Assertion

HS code (candidate)Description (illustrative)Duty lookup path
8541.43Photovoltaic cells, assembled in modules or made up into panelsCBIC Indian Customs Tariff (verify chapter/notification in force at clearance)
8504.40Static converters (PV inverters)CBIC Indian Customs Tariff
7610.90Aluminium mounting structuresCBIC Indian Customs Tariff
8544.49DC/AC cables, other electric conductorsCBIC Indian Customs Tariff

Duty rates are not asserted on this page. The codes above are candidate headings only; the importer must verify classification and the applicable BCD / IGST / CVD / ADD / safeguard rate at the CBIC portal at the time of clearance. For shipments via alternative corridors, consult the relevant national tariff tool: USITC HTS (US), EU TARIC (EU), UK Global Tariff (UK), Japan Customs, Australian Border Force, SARS (ZA), Ghana Revenue Authority, Uganda Revenue Authority.

7. CTAs

CTA — Request a tailored RFQ for a 200 kWp food-court rooftop system (modules / inverter / mounting / EPC):
/rfq/

A datasheet PDF for this use case is not yet published; the RFQ form is the single intake until the datasheet lands. Do not link a placeholder path.

8. Method, Assumptions, and Limitations

Bounded default assumptions (the draft did not state these; flag for the buyer):

Limitations: tariff escalation (3.0 %/yr real) is a bounded assumption, not a regulatory forecast; derate (0.85) bundles soiling, thermal, and mismatch and is not site-specific; the 0.5 %/yr module degradation is a linear warranty-basis assumption, not a field-measured rate; the 2,500,000 INR year-11 inverter replacement is a model assumption tied to the Huawei SUN2000-100KTL-M2 service-life floor and must be re-priced at RFQ. HS-code duty rates are deliberately not asserted. Re-running the model with revised inputs may move headline NPV, IRR, and payback materially.