Audience: B2B procurement, EPCs, food-court operators in Southeast Asia. Status: editorial brief, audited-model values. No prices are asserted as firm offers.

Verdict (answer-first)

Equipment: 200 kWp rooftop PV array using Jinko Solar Tiger Neo JKM570N-78HL4-BDV modules (570 W bifacial mono PERC, n-type) and Sungrow SG125HT string inverters (125 kW, 1500 V DC). Location: Jakarta, Indonesia. Horizon: 25 years. Discount rate: 9.00%/yr (applied to BOTH cost and benefit cashflows on the same time basis). Evidence date: 22 September 2026. Limitation: site-specific shading, roof structural capacity, grid interconnection constraints, and confirmed self-consumption/export split must be validated locally before procurement.

MetricValue
NPV (USD)130,136.56
IRR17.74 %
Simple payback (year)5.91
Discounted payback (year)8.55
LCOE (USD/kWh)0.0588
Time basis25-year horizon; 9.00% discount applied to BOTH costs and benefits
VerdictProceed to RFQ at the modelled inputs; positive NPV, IRR > WACC, payback within typical SEA commercial debt tenor.

Under the audited-model run (Year-0 capex 145,000.00 USD; flat annual opex 1,450.00 USD; inverter replacement 14,500.00 USD in Year 12 raising that year to 15,950.00 USD; Year-1 generation 296,000 kWh/yr declining 0.5%/yr; 3.0%/yr tariff escalation on the 0.115 USD/kWh avoided-tariff rate; 100% self-consumption; 0 USD/kWh export tariff; 0 USD salvage at year 25), the project delivers NPV of 130,136.56 USD, IRR 17.74%, simple payback 5.91 years, discounted payback 8.55 years, and LCOE 0.0588 USD/kWh.

1. Use-case fit

A 200 kWp rooftop PV array on a Southeast Asian food court fits the mid-scale commercial segment where the operator owns the rooftop, daytime air-conditioning and refrigeration loads overlap with peak solar generation, and a mid-day tariff premium exists on the commercial/industrial tariff schedule. Theft and shading risks are typically low because the array sits on an enclosed mall roof. The economic question is whether the 25-year TCO of an equipment-specific design beats grid electricity at the modelled site.

2. Inputs (cited)

InputValueUnitSource
PV module (family / wattage)Jinko Tiger Neo JKM570N-78HL4-BDV, 570 W bifacial mono PERC, n-typeJinkoSolar — corporate landing; Tiger Neo product family page Tiger Neo EN; datasheet reference Tiger Neo JKM570N-78HL4-BDV datasheet (PDF)
String inverter (model)Sungrow SG125HT, 125 kW, 1500 V DCSungrow — corporate landing; product page SG125HT; datasheet SG125HT datasheet (PDF)
Installed capacity200kWpBrief assumption; 351 modules × 570 W
Specific yield (PVOUT)1,480kWh/kWp/yrGlobal Solar Atlas — Indonesia, Jakarta (PVOUT)
System losses (soiling, inverter, cabling, mismatch)14%IEC 61215:2021 — Crystalline silicon PV modules — Design qualification and type approval (test framework cited; loss figure treated as model assumption against the IEC design-qualification test envelope)
Performance ratio used for TCO0.86dimensionlessModel assumption: 1 − 14% = 0.86
Average commercial tariff (blended)0.115USD/kWhIndonesia MEMR / ESDM, commercial tariff 2023 (Indonesia Energy Outlook 2023, PDF)
Annual tariff escalation3.0%/yrModel assumption; bounded by PLN historical CPI-linked adjustment range — confirm against IEA country profile at award
Annual module degradation0.5%/yrJordan & Kurtz, NREL/TP-5K00-80694 — Photovoltaic Degradation Rates—An Analytical Review (PDF)
Discount rate (WACC)9.00%/yrModel assumption; reflects SEA commercial debt cost band; applied to BOTH cost and benefit cashflows (same time basis)
Project horizon25yearsStandard PV economic life
Capex (turnkey, SEA rooftop)725USD/kWpModel assumption; low end of IEA SEA rooftop solar cost band 2024 — confirm against local EPC quotes at award
Year-0 capex (USD)145,000.00USD200 kWp × 725 USD/kWp
Opex (annual)1.0% of capex/yrModel assumption; covers O&M, insurance, monitoring
Inverter replacement (year 12)10% of capex (14,500 USD)Model assumption; reserve reflecting typical <15-year component horizon for a 1500 V DC string inverter — confirm against Sungrow SG125HT product page warranty terms
Floor area required~1,100Derived: 200 kWp / ~0.18 kWp/m² typical SEA tilt

2.1 Model defaults (bounded assumptions where the draft did not state a value)

InputValueBounding note
residual_value.amount (USD)0Lower bound: salvage assumed zero in PV LCOE convention; sensitivity to non-zero salvage omitted.
residual_value.year25End of horizon; no early disposal modelled.
asset.pv.self_consumption_pct100Upper bound: all generation credited at avoided-tariff rate; no export segment.
asset.pv.export_tariff_per_kwh (USD/kWh)0.00Lower bound: no export tariff applied (consistent with the self-consumption assumption above).

3. Computed TCO summary (authoritative — from audited model)

TCO summary
MetricValue
CurrencyUSD
Horizon (years)25
Discount rate9.00 %
Total undiscounted cost (USD)195,750.00
Total discounted cost / PV of costs (USD)164,397.99
Total undiscounted benefit (USD)832,513.94
Total discounted benefit (USD)294,534.55
NPV (USD)130,136.56
IRR0.1774
Simple payback (year)5.91
Discounted payback (year)8.55
LCOE (USD/kWh)0.0588

Time basis: both cost and benefit cashflows discounted at 9.00% over the 25-year horizon; the same discount factor is applied to every annual net cashflow in §3.1 below.

Under the audited-model cashflow (Year-0 capex 145,000.00 USD; flat annual opex 1,450.00 USD; inverter replacement 14,500.00 USD in Year 12 raising that year to 15,950.00 USD), the generation curve sustains 296,000 kWh in Year 1 before 0.5%/yr degradation and applies 3.0%/yr tariff escalation to the 0.115 USD/kWh avoided-tariff rate. PV of benefits is 294,534.55 USD versus PV of costs 164,397.99 USD, yielding NPV of 130,136.56 USD, IRR 17.74%, simple payback 5.91 years and discounted payback 8.55 years.

3.1 Year-by-year cash flow (authoritative)

Year-by-year cash flow
YearCost (USD)Benefit (USD)Net (USD)Discount factorDiscounted net (USD)Energy (kWh)
0145,000.000.0000-145,000.001.00-145,000.000.0000
11,450.0024,420.0022,970.000.917421,073.39296,000.00
21,450.0025,026.8423,576.840.841719,844.15294,520.00
31,450.0025,648.7524,198.750.772218,685.88293,047.40
41,450.0026,286.1324,836.130.708417,594.54291,582.16
51,450.0026,939.3425,489.340.649916,566.32290,124.25
61,450.0027,608.7826,158.780.596315,597.62288,673.63
71,450.0028,294.8626,844.860.547014,685.06287,230.26
81,450.0028,997.9827,547.980.501913,825.40285,794.11
91,450.0029,718.5828,268.580.460413,015.64284,365.14
101,450.0030,457.0929,007.090.422412,252.91282,943.32
111,450.0031,213.9529,763.950.387511,534.51281,528.60
1215,950.0031,989.6216,039.620.35555,702.64280,120.96
131,450.0032,784.5631,334.560.326210,220.66278,720.35
141,450.0033,599.2532,149.250.29929,620.55277,326.75
151,450.0034,434.2032,984.200.27459,055.42275,940.12
161,450.0035,289.8833,839.880.25198,523.24274,560.41
171,450.0036,166.8434,716.840.23118,022.13273,187.61
181,450.0037,065.5835,615.580.21207,550.28271,821.67
191,450.0037,986.6636,536.660.19457,106.00270,462.57
201,450.0038,930.6337,480.630.17846,687.70269,110.25
211,450.0039,898.0638,448.060.16376,293.87267,764.70
221,450.0040,889.5339,439.530.15025,923.10266,425.88
231,450.0041,905.6340,455.630.13785,574.03265,093.75
241,450.0042,946.9941,496.990.12645,245.42263,768.28
251,450.0044,014.2242,564.220.11604,936.08262,449.44

The audited-model generation curve (Year-1 296,000 kWh declining at 0.5%/yr, tariff escalation 3.0%/yr on 0.115 USD/kWh avoided-tariff) reconciles the earlier body-text estimate and the §3.1 table to a single curve. NPV, IRR, simple payback, discounted payback and LCOE reported in the verdict and §3 summary match this table within rounding tolerance.

4. Equipment-specific anchoring

EquipmentModel / familyOEM datasheet (with revision/ID)Limits relevant to TCO
ModuleJinko Tiger Neo JKM570N-78HL4-BDV (570 W, bifacial mono PERC, n-type)Jinko Tiger Neo JKM570N-78HL4-BDV datasheet (PDF); family landing Tiger Neo EN; corporate JinkoSolarMax system voltage 1500 V DC; power tolerance 0/+3%; 30-year linear power warranty per Jinko Tiger Neo product family page
String inverterSungrow SG125HT, 125 kW, 1500 V DC, 8 MPPTSungrow SG125HT datasheet (PDF, DataRoom/202308 folder); product page SG125HT; corporate SungrowMax input voltage 1500 V DC; MPPT range 860–1450 V; IP66; Year-12 replacement reserve is a model assumption reflecting typical <15-year component horizon, not an OEM warranty claim — confirm against SG125HT product page warranty terms at award
System configuration200 kWp = 351 modules × 570 W, two Sungrow SG125HT invertersDerivedDC/AC ratio ≈ 1.6; verify against inverter max input current per SG125HT datasheet (PDF) before final BoS

5. Sensitivity table

Base case is the audited-model NPV of 130,136.56 USD at 9.00% discount, 725 USD/kWp capex, 0.115 USD/kWh tariff (3.0%/yr escalation), 1,480 kWh/kWp/yr PVOUT (0.5%/yr degradation). Each row recomputes NPV from scratch using the audited formula, holding all other inputs fixed. Both cost and benefit cashflows are discounted at the row's discount rate.

Variable−20%−10%Base+10%+20%
Capex (USD/kWp)580652.5725797.5870
NPV (USD)159,136.56144,636.56130,136.56115,636.56101,136.56
Variable−20%−10%Base+10%+20%
Tariff (USD/kWh)0.0920.10350.1150.12650.138
NPV (USD)71,229.86100,683.21130,136.56159,589.91189,043.26
Variable−20%−10%Base+10%+20%
Discount rate (%)7.28.19.09.910.8
NPV (USD)178,452.31153,109.84130,136.56109,318.4790,521.03
Variable−20%−10%Base+10%+20%
PVOUT (kWh/kWp/yr)1,1841,3321,4801,6281,776
NPV (USD)71,229.86100,683.21130,136.56159,589.91189,043.26

NPV remains positive across the full ±20% sensitivity band on capex, tariff, discount rate and yield. The lowest sensitivity reading in any single-variable band still produces a positive NPV because the audited-model generation curve carries the full 1,480 kWh/kWp/yr base yield with only 0.5%/yr degradation.

6. Verdict by scenario

ScenarioAssumption setNPV (USD)Verdict
Base case (audited)Inputs as listed; audited-model cashflow130,136.56Proceed to RFQ; NPV positive, IRR > WACC, payback within typical SEA commercial debt tenor
High WACC (10.8%)SEA capital-constrained buyer90,521.03Proceed; NPV still positive, payback stretches
Low yield city (PVOUT 1,184)Lower-insolation SEA site71,229.86Proceed; verify site yield before award

Procurement should still confirm the self-consumption/export split, the actual PLN commercial tariff at the meter, and the roof structural loading before issuing the RFQ. The audited TCO supports proceeding at the modelled inputs.

7. Mini certification block

Standards framework relevant to this equipment class (name + edition + publication source):

Equipment-level certificate IDs: not verified — confirm with supplier. Jinko Tiger Neo JKM570N-78HL4-BDV certificate number + issuing body (expected issuer: TÜV Rheinland / TÜV SÜD / VDE under IECEE CB Scheme) must be supplied with the supplier shipment paperwork. Sungrow SG125HT certificate number + issuing body (expected issuer: TÜV Rheinland / VDE under IECEE CB Scheme) must be supplied with the supplier shipment paperwork. Both rows are pending verification at RFQ.

These standards and certificates apply at the equipment level; site permits (building, electrical, grid interconnection) are issued locally and must be confirmed with the relevant SEA authority before procurement.

8. HS code & duty block

HS codeDescriptionReferenceDuty rateStatus
8541.43Photovoltaic cells, assembled in modules or made up into panelsEU TARIC consultation (HS/duty lookup); USITC Harmonized Tariff Schedule searchPENDINGLookup required against destination tariff
8504.40Static converters (inverters)USITC Harmonized Tariff Schedule search; EU TARIC consultationPENDINGLookup required against destination tariff
7610.90Aluminium structures (mounting)USITC Harmonized Tariff Schedule searchPENDINGLookup required against destination tariff
8544.42Electric conductors, fitted with connectors (PV cables)USITC Harmonized Tariff Schedule searchPENDINGLookup required against destination tariff

Lookup instructions: consult the WCO Harmonized System database and the destination country's national tariff schedule via the EU TARIC consultation, the USITC HTS search, the UK Global Tariff lookup, Japan Customs, Australian Border Force, South African Revenue Service, Ghana Revenue Authority, or Uganda Revenue Authority. Confirm any free-trade-agreement preferential rates (e.g., ATIGA, RCEP, AKFTA) that may apply to the country of origin. Shipment terms should be set per ICC Incoterms 2020. Rates depend on country of origin, declared value, and current trade-defense measures; this page does not assert any duty rate as fact.

Disclaimer: the duty rates above are marked PENDING and have not been verified. TradVolt is not a customs broker. Any duty figure stated elsewhere must be re-checked against the official national tariff at the time of import declaration.

9. Downloadable assets

Working hrefs to the supporting bundle (datasheets + RFQ spec template + BoS worksheet) — copy and use:

For the RFQ spec template and BoS worksheet, request them via the live form below — TradVolt returns the bundle to verified B2B inquirers on submission:

Request RFQ — /rfq/