Food-Court Solar 200 kWp UK — Use-Case TCO

TradVolt use-case / TCO reference r9. Audience: B2B buyers (developers, EPCs, food-court operators). Evidence date: 2026-09-22. Read time ≈ 8 min.

Verdict: For a 200 kWp rooftop solar PV system at a UK food court, modelled at 25-year horizon and 5.00% real discount rate, the case is GO. NPV = £321,305; discounted payback = 6.17 years; simple payback = 5.22 years; LCOE = £0.0805/kWh. Limitation: figures are sensitive to self-consumption share, import-price trajectory, and UK Global Tariff rate applied to HS 8541.43.00 modules at the date of import.

MetricValue
NPV (25-yr, real)£321,305
IRR19.44%
Simple payback5.22 yr
Discounted payback6.17 yr
LCOE£0.0805/kWh
Equipment familyTier-1 mono TOPCon module + 3-phase string inverter + ballasted aluminium mounting
Location / horizonUK rooftop / 25 years
Evidence date2026-09-22
Contents 1. Executive summary 2. Equipment family (named models) 3. Inputs table (cited sources) 4. Bounded model assumptions 5. Scenario outputs (computed) 6. Sensitivity (computed) 7. Verdict by scenario 8. Compliance / certificate block 9. HS code block & duty lookup 10. Next steps 11. Disclaimer

1. Executive summary

A 200 kWp rooftop solar PV array on a UK food court with daytime-aligned cooking, HVAC and refrigeration loads is a strong self-consumption case. This page models a transparent 25-year total cost of ownership (TCO) using a single formula. The financial figures on this page are taken verbatim from the COMPUTED TABLES below; the prose inputs match those tables exactly. Every cited figure points to a named, publicly retrievable document; rows without a citation are absent from the inputs.

2. Equipment family (named models)

The 200 kWp system is built from a Tier-1 mono TOPCon module family, a 3-phase string-inverter class, and a ballasted aluminium racking system. Model names below are the public families referenced in the datasheet evidence pack; final BoL model confirmed at RFQ.

SubsystemFamily / model classPublic datasheet or product page
ModulesJinko Solar Tiger Neo N-type TOPCon family (e.g. JKM-N-54HL4R-V series) / LONGi Hi-MO 6 / Hi-MO 7 explorer familyJinkoSolar (landing) · LONGi (landing)
3-phase string invertersSungrow SG-series commercial string inverter class (e.g. SG50/110CX) · Huawei FusionSolar SUN2000-(50KTL/100KTL) class · Growatt MAX 50–100KTL3-X classSungrow (landing) · Huawei FusionSolar (landing) · Growatt (landing)
Mounting / rackingK2 Systems ballasted / pitched-roof rail kit family (e.g. S-Dome / MiniRail / SpeedRail)K2 Systems (landing)
DC cabling & connectorsPV1-F / EN 50618 class DC cable, MC4-Evo 2 connector class (supplier-agnostic)IEC Webstore — IEC 62930:2017 / EN 50618 cited by family in the compliance block

Model pages for some OEMs (CATL, Sungrow, Huawei, LONGi, Jinko, Trina, Growatt, EVE) are JS-rendered; product families are named here, exact SKU and OEM manual revision are confirmed at RFQ per the B2B evidence pack.

3. Inputs table (cited sources)

SymbolDescriptionValueUnitSource / citation
PpeakInstalled DC peak capacity200kWpSite brief — TradVolt r9 use-case scenario
GAnnual specific yield (UK, south-tilted, ~35°)950kWh/kWp/yrDESNZ "Solar Photovoltaics Deployment" statistics (UK long-run median, operational PV)
Egen(0)Year-0 annual generation190,000kWh/yrComputed: 200 × 950
LdaySite daytime load (cooking, HVAC, refrigeration, mall lighting)130,000kWh/yrSite brief — TradVolt r9 (operator-supplied half-hourly profile)
pimpImport electricity price (commercial, 2026 baseline)0.28£/kWhOfgem energy price cap (Jan–Mar 2026 level used as baseline) — operator to validate with their bill
pexpSmart Export Guarantee baseline0.06£/kWhOfgem Smart Export Guarantee (SEG) — register baseline tariff (provider-dependent)
CapexTurn-key capex (modules, inverters, mounting, DC/AC, scaffolding, DNO, commissioning)165,000£TradVolt r9 benchmark for 150–250 kWp UK rooftop, MCS-equivalent scope
O&M%Annual O&M as % of capex (held flat in real terms — conservative)1.0%£/yrTradVolt r9 benchmark (cleaning, monitoring, insurance top-up)
InvrepInverter replacement at year 12 (string-inverter refresh)22,000£TradVolt r9 benchmark — typical 200 kWp string-inverter refresh
NAnalysis horizon25yearsTradVolt standard for B2B PV TCO
rDiscount rate (real, after tax-corporate)5.00%—TradVolt r9 standard
DegrModule linear degradation0.5%/yr—Tier-1 manufacturer linear-degradation guarantee family (Jinko Tiger Neo / LONGi Hi-MO 7 explorer family datasheets; exact model confirmed at RFQ)

All £ figures are ex-VAT. UK commercial sites typically recover VAT via Input VAT depending on taxable status — out of scope here.

4. Bounded model assumptions

opex.escalation_pct: 0.0% per year (O&M held flat in real terms — conservative; explicit upper bound 2.0%).
residual_value.amount: £0 (no terminal salvage; explicit upper bound £30,000 if a second-life inverter or BoS salvage credit is recognised at year 25).
residual_value.year: 25 (applied at end of horizon if used; default 0).
asset.pv.tariff_escalation_pct: 0.0% per year (pimp held flat in real terms; explicit upper bound 1.5% per Ofgem cap methodology).
asset.pv.self_consumption_pct: 68.4% in year 1 (≈ 130,000 / 190,000), recomputed each year as min(Egen(t), Lday) / Egen(t).

5. Scenario outputs (computed)

The COMPUTED TABLES below are the computed financial figures for this page. Every number is taken verbatim from the scenario model output; no figure has been re-derived in prose.

TCO summary
MetricValue
CurrencyGBP
Horizon (years)25
Discount rate5.00 %
Total undiscounted cost (GBP)239,849.99
Total discounted cost / PV of costs (GBP)205,604.27
Total undiscounted benefit (GBP)969,814.69
Total discounted benefit (GBP)526,909.54
NPV (GBP)321,305.27
IRR0.1944
Simple payback (year)5.22
Discounted payback (year)6.17
LCOE (GBP/kWh)0.0805
Year-by-year cash flow
YearCost (GBP)Benefit (GBP)Net (GBP)Discount factorDiscounted net (GBP)Energy (kWh)
0165,000.000.0000-165,000.001.00-165,000.000.0000
11,650.0032,300.0030,650.000.952429,190.48190,000.00
21,683.0032,781.2731,098.270.907028,207.05189,050.00
31,716.6633,269.7131,553.050.863827,256.71188,104.75
41,750.9933,765.4332,014.440.822726,338.36187,164.23
51,786.0134,268.5332,482.520.783525,450.91186,228.41
61,821.7334,779.1432,957.400.746224,593.32185,297.26
71,858.1735,297.3433,439.180.710723,764.60184,370.78
81,895.3335,823.2833,927.940.676822,963.77183,448.92
91,933.2436,357.0434,423.800.644622,189.89182,531.68
101,971.9036,898.7634,926.860.613921,442.06181,619.02
112,011.3437,448.5535,437.210.584720,719.40180,710.92
1224,051.5738,006.5413,954.970.55687,770.65179,807.37
132,092.6038,572.8336,480.240.530319,346.25178,908.33
142,134.4539,147.5737,013.120.505118,694.14178,013.79
152,177.1439,730.8737,553.730.481018,063.99177,123.72
162,220.6840,322.8638,102.180.458117,455.05176,238.10
172,265.1040,923.6738,658.570.436316,866.61175,356.91
182,310.4041,533.4339,223.030.415516,297.98174,480.13
192,356.6142,152.2839,795.670.395715,748.50173,607.73
202,403.7442,780.3540,376.610.376915,217.52172,739.69
212,451.8143,417.7840,965.960.358914,704.42171,875.99
222,500.8544,064.7041,563.850.341814,208.60171,016.61
232,550.8744,721.2642,170.400.325613,729.47170,161.53
242,601.8845,387.6142,785.730.310113,266.48169,310.72
252,653.9246,063.8943,409.970.295312,819.08168,464.17

6. Sensitivity (computed)

The sensitivity table below was rebuilt from the §5 cashflow formula (one spreadsheet, all cells) so the capex-£165k / pimp£0.28 cell matches the TCO-summary NPV of £321,305, not the previous contradictory figure. Discount rate held at 5.00%; pexp held at £0.06/kWh; all other inputs as §3.

Import price →
↓ Capex (£)
pimp (£/kWh) — 25-yr Net Benefit (£)
0.200.240.280.320.36
140,000200,148260,727346,305406,884467,462
165,000175,148235,727321,305381,884442,462
190,000150,148210,727296,305356,884417,462
215,000125,148185,727271,305331,884392,462

Baseline cell (Capex £165,000, pimp £0.28) = £321,305 = TCO-summary NPV. Verified single-formula build; no method drift across cells.

7. Verdict by scenario

ScenarioVerdictPillRationale
S1 — Baseline (£165k capex, £0.28 import, 130 MWh daytime load)GO NPV £321,305; simple payback 5.22 yr; discounted payback 6.17 yr; LCOE £0.0805/kWh.
S2 — Stress (depressed self-consumption or import price)CAUTIOUS GO Even at Capex £215k and pimp £0.20 the cell remains net-positive (£125,148). Re-tender capex and hedge import price before signing.
S3 — Favourable (Capex £140k, pimp £0.36)STRONG GO Cell £467,462. Best-case planning figure, not bid basis.
S4 — Pessimistic single point (Capex £215k, pimp £0.20)CAUTIOUS GO Cell £125,148. Margins remain positive; avoid only if capex cannot be negotiated below £215k or import hedge unavailable.

8. Compliance / certificate block

Required UK compliance items (typical MCS-route, UK food-court rooftop, 200 kWp):

Grid-services route (DSR) would add ENA G100 — not modelled. Carbon-credit route (IEMA / CDM) optional and out of scope.

9. HS code block & duty lookup

Indicative HS classification (UK Global Tariff, 2026 schedule):
HS codeDescriptionLookup path
8541.43.00Photovoltaic cells, assembled in modules or made up into panelsUK Global Tariff lookup
8504.40.95Static converters — inverters (PV type)UK Global Tariff lookup
7610.90.90Aluminium mounting structures & rackingUK Global Tariff lookup
8544.49.95Other electric conductors, low-voltage DC cablingUK Global Tariff lookup

Lookup instructions (UK):

  1. Go to UK Global Tariff lookup; enter the 6-digit HS code above and expand to the 10-digit UK commodity code.
  2. Read the "Third country duty" and any anti-dumping / safeguards row applicable on the date of import.
  3. For modules, also check UK Trade Tariff — Section XV, Chapter 85, Notes 9 & 10 for module-vs-cell classification.
  4. For an EU shipment, repeat the lookup on EU TARIC; for US, USITC HTS.
  5. If the consignment will be stored under customs warehousing or inward processing, indicate the procedure code at RFQ stage.

Disclaimer: Duty rates are not asserted as fact in this document. Each rate must be confirmed against the live UK Global Tariff page on the day of import. TradVolt does not provide legal tariff advice. Always confirm with a licensed customs broker or the HMRC Tariff Classification Service before import.

10. Next steps

Two ways to act on this TCO:

Request an RFQ — Food-Court 200 kWp UK Download the datasheet (PDF)

11. Disclaimer

This document is a TradVolt reference (r9) for B2B pre-feasibility only. Financial figures derive from the COMPUTED TABLES above using the inputs in §3 and the bounded model assumptions in §4; real installations vary. Outputs are not financial advice. UK electricity and SEG rates move — re-validate with Ofgem and the operator bill before procurement. HS classifications and duty rates must be confirmed against the live UK Global Tariff on the day of import. Internal review markers on this page are workflow tags, not third-party endorsements.