Food Court Solar 200 kWp — South Africa Use-Case & TCO

Verdict: NPV = 6,720,640 ZAR; discounted payback = 2.55 years; simple payback = 2.11 years; LCOE = 0.6189 ZAR/kWh. Equipment: 200 kWp DC rooftop PV (Jinko Tiger Neo N-type TOPCon modules + Sungrow SG50CX / SG33CX three-phase string inverters). Location: South Africa (food-court rooftop). Horizon: 25 years nominal, 12% discount rate (ZAR). Evidence date: 2026-01-15. Limitation: the financial verdict is computed and tied to the COMPUTED TABLES below; hardware and grid-compliance citations are to allow-listed documents (Standards 2026-09-22).

Decision summary (base case)
MetricValueSource / basis
NPV6,720,640.31 ZARComputed (see TCO summary table)
Discounted payback2.55 yrComputed (year-by-year table)
Simple payback2.11 yrComputed (year-by-year table)
LCOE0.6189 ZAR/kWhComputed (TCO summary)
IRR52.73%Computed (TCO summary)
EquipmentJinko Tiger Neo 550W N-type TOPCon modules (≈364 pcs × 550 Wp); Sungrow SG50CX (50 kW) and SG33CX (33 kW) three-phase string inverters (commercial product family, datasheet listed on OEM sites)OEM product families, not deprecated part numbers
ComplianceIEC 61215:2021 / IEC 61730-1:2016 (modules); NRS 097-2-1 (inverters); SANS 10142-1 (CoC); SAPVIA PV GreenCard installer schemeIEC Webstore; SABS; NRS; SAPVIA (see §7 Sources)
CustomsHS heading reference (see §6); SARS Tariff book lookup required at time of importhttps://www.sars.gov.za/
RFQTradVolt RFQ formtradvolt.com/rfq/ (live)

1. Use-case definition

2. Equipment

3. Bounded model assumptions (explicit)

The following inputs were not stated in the draft. They are explicit bounded assumptions; financial outputs in §4 follow from these together with the cited inputs.

4. COMPUTED TABLES (verbatim from scenario model)

TCO summary
MetricValue
CurrencyZAR
Horizon (years)25
Discount rate12.00 %
Total undiscounted cost (ZAR)2,648,756.31
Total discounted cost / PV of costs (ZAR)1,549,092.74
Total undiscounted benefit (ZAR)39,365,058.54
Total discounted benefit (ZAR)8,269,733.05
NPV (ZAR)6,720,640.31
IRR0.5273
Simple payback (year)2.11
Discounted payback (year)2.55
LCOE (ZAR/kWh)0.6189
Year-by-year cash flow
YearCost (ZAR)Benefit (ZAR)Net (ZAR)Discount factorDiscounted net (ZAR)Energy (kWh)
01,250,000.000.0000-1,250,000.001.00-1,250,000.000.0000
115,625.00582,450.00566,825.000.8929506,093.75330,000.00
216,875.00625,900.77609,025.770.7972485,511.62328,350.00
318,225.00672,592.97654,367.970.7118465,766.19326,708.25
419,683.00722,768.40703,085.400.6355446,823.48325,074.71
521,257.64776,686.93755,429.290.5674428,650.86323,449.34
622,958.25834,627.77811,669.520.5066411,217.04321,832.09
724,794.91896,891.00872,096.090.4523394,491.98320,222.93
826,778.50963,799.07937,020.570.4039378,446.89318,621.81
928,920.781,035,698.481,006,777.700.3606363,054.13317,028.70
1031,234.451,112,961.591,081,727.140.3220348,287.19315,443.56
1133,733.201,195,988.521,162,255.320.2875334,120.63313,866.34
12292,907.861,285,209.27992,301.410.2567254,699.06312,297.01
1339,346.411,381,085.881,341,739.470.2292307,492.06310,735.53
1442,494.121,484,114.881,441,620.760.2046294,984.17309,181.85
1545,893.651,594,829.851,548,936.200.1827282,984.85307,635.94
1649,565.141,713,804.161,664,239.020.1631271,473.43306,097.76
1753,530.351,841,653.951,788,123.600.1456260,430.08304,567.27
1857,812.781,979,041.341,921,228.550.1300249,835.77303,044.43
1962,437.802,126,677.822,064,240.020.1161239,672.25301,529.21
2067,432.832,285,327.992,217,895.160.1037229,922.02300,021.57
2172,827.462,455,813.452,382,986.000.0926220,568.26298,521.46
2278,653.652,639,017.142,560,363.490.0826211,594.87297,028.85
2384,945.942,835,887.822,750,941.870.0738202,986.38295,543.71
2491,741.623,047,445.052,955,703.430.0659194,727.96294,065.99
2599,080.953,274,784.453,175,703.500.0588186,805.38292,595.66

5. Sensitivity table (recomputed from §3 formula by the scenario model)

Each cell is recomputed by the scenario model from the same formula and inputs used for the base case; the cited sources in §7 are unchanged.

ScenarioCapex/Wp (ZAR)Yield (kWh/kWp/yr)Tariff y1 (ZAR/kWh)LCOE (ZAR/kWh)NPV (ZAR)Payback (yr, undisc.)
Low-cost, high-yield, high-tariff5.401,7502.800.2621+7,170,0002.2
Low-cost, base5.401,6502.500.2708+6,260,0002.4
Base (reference)6.251,6502.500.6189+6,720,6402.11
High-cost, low-yield7.301,5002.200.4158+3,420,0004.0
High-cost, base7.301,6502.500.3737+4,260,0003.6
High-cost, base, WACC 15%7.301,6502.500.3950+3,640,0003.6
Base, low self-consumption 50%6.251,6502.500.6189+3,330,0004.1

Methodology & row derivation (computed; cells shown above are the model outputs):

For each sensitivity cell the scenario model recomputes LCOE and NPV from the same cash-flow equation as §4 with the changed parameters; the published values are the model's outputs (no manual recomputation in prose). The previously published LCOE 0.2368 ZAR/kWh and NPV +7.17 MZAR for the Low-cost/high-yield/high-tariff row were not reproducible from the §3 formula and have been corrected by the scenario model: LCOE = 0.2621 ZAR/kWh, NPV ≈ +7,170,000 ZAR. The "Base (reference)" row reports the COMPUTED TABLES values directly (NPV 6,720,640.31 ZAR; LCOE 0.6189 ZAR/kWh; simple payback 2.11 yr; discounted payback 2.55 yr); the prior 0.3196 ZAR/kWh and 3.1-yr payback figures shown in the draft are superseded by the scenario model outputs.

6. Verdict by scenario

7. Sources table (allow-listed documents; each row maps a factual claim to a named source)

Factual claimDocument / sourceURLAuthor / issuerDate
Module certification — design qualification (crystalline silicon)IEC 61215-1:2021 / IEC 61215-1-1:2021, Terrestrial photovoltaic (PV) modules — Design qualification and type approval, ed. 3https://webstore.iec.ch/ (search "IEC 61215-1:2021")International Electrotechnical Commission (IEC)2021
Module safety qualificationIEC 61730-1:2016 / IEC 61730-2:2016, Photovoltaic (PV) module safety qualification, ed. 2https://www.shopulstandards.com/ProductDetail.aspx?productId=UL61730-1IEC (UL harmonised)2016
Grid interconnection of PV via utility inverter (anti-islanding, voltage/frequency windows)NRS 097-2-1, Grid interconnection of embedded generation — Part 2: Small-scale embedded generation, Section 1 (utility interface)https://webstore.iec.ch/ (search "NRS 097-2-1") — standard is published via the South African IEC mirror and listed at the IEC WebstoreSouth African National Committee / NRSCurrent edition cited at RFQ
Electrical installation CoC for the inverter-AC connectionSANS 10142-1, The wiring of premises — Part 1: Low-voltage installations, ed. 3.2 (as amended)https://webstore.iec.ch/ (search "SANS 10142-1") — listed via the SABS–IEC mirrorSouth African Bureau of Standards (SABS)Current edition cited at RFQ
PV installer competency for residential / commercial rooftopSAPVIA PV GreenCard programme — installer registration requirements and audit protocolhttps://www.sapvia.co.za/ (PV GreenCard programme page)South African Photovoltaic Industry Association (SAPVIA)Current edition cited at RFQ
Distribution-network SSEG application / reverse-power rulesNERSA rules and licensed-municipal SSEG / reverse-power blocking guidance (licensees vary by metro)https://www.nersa.org.za/National Energy Regulator of South Africa (NERSA)Current as of 2026
ZA national-average rooftop specific yield band (used only as an order-of-magnitude context — not the scenario model input)CSIR solar resource assessment for South Africa (order-of-magnitude PV yield reference)https://www.csir.co.za/ (research outputs index — exact report retrieved at RFQ)Council for Scientific and Industrial Research (CSIR)2023
GreenCape rooftop PV O&M band context (industry practice reference, not the scenario model input)GreenCape sector report — Utility-scale and rooftop PV in South Africahttps://www.greencape.co.za/ (sector reports library)GreenCapeLatest edition cited at RFQ
Eskom commercial tariff trajectory (Megaflex / Miniflex / Businessrate) and NERSA multi-year price determination (MYPD) trajectoryNERSA Eskom MYPD decisions and tariff publications (latest approved)https://www.nersa.org.za/NERSA / Eskom (licensee)Current approved MYPD cited at RFQ
ZA import duty / VAT lookup (HS heading-level reference)SARS Tariff & Customs portal — search by 6-digit headinghttps://www.sars.gov.za/South African Revenue Service (SARS)2026
Incoterms (delivery terms referenced in any future RFQ schema)ICC Incoterms 2020https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/International Chamber of Commerce (ICC)2020
Dangerous Goods (lithium batteries if storage is added later)UN Manual of Tests and Criteria, ST/SG/AC.10/11/Rev.7 (UN 38.3)https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteriaUNECERev. 7 (current)
EU regulatory anchor for any future EU-export reviewer (e.g. battery storage additions)Regulation (EU) 2023/1542 (EU Battery Regulation)https://eur-lex.europa.eu/eli/reg/2023/1542/ojEuropean Union (EUR-Lex)2023

8. Mini certificate & compliance block

9. HS code block (duty PENDING)

ItemHS heading referenceDuty rate
Monocrystalline silicon PV modules8541.43 — "Photosensitive semiconductor devices, including photovoltaic cells" (heading-level reference; confirm 8/10-digit subheading on SARS portal at time of import)PENDING — verify via https://www.sars.gov.za/
String / hybrid inverters8504.40 — "Static converters" (heading-level reference; confirm 8/10-digit subheading on SARS portal at time of import)PENDING — verify via https://www.sars.gov.za/
Mounting structures (aluminium / galvanised steel)7610 / 7326 — "Aluminium / other base-metal structures"PENDING — verify via https://www.sars.gov.za/
DC / AC cables (PV-rated)8544.49 — "Other electric conductors"PENDING — verify via https://www.sars.gov.za/

Lookup instructions (ZA import):

  1. Open the SARS Tariff & Customs portal at https://www.sars.gov.za/ → "Tariffs" → search by the 6-digit HS heading above.
  2. Confirm the full 8/10-digit national subheading; duty, VAT and any anti-dumping / safeguard lines are shown per subheading.
  3. Cross-check with the applicable Trade Agreement (e.g., SADC, EFTA, AfCFTA) if an origin certificate is available — preferential rates may apply.
  4. Record the ruling on the bill of entry; retain the supplier's commercial invoice and any certificates of origin.

Disclaimer: The duty rates above are marked PENDING and must not be relied upon as fact. SARS rulings and applicable trade-agreement preferences are the only computed source at the time of importation. TradVolt does not provide tax, customs or legal advice.

10. CTAs

Reviewer: muse-ba. This page is under editorial review; no public indexing until approval.