Fuel Station Solar 80 kWp AU — TCO Use Case

Slug: /use-cases/fuel-station-solar-80kwp-au-r9/ · Region: Australia · Currency: AUD · Audience: B2B green-tech procurement · Evidence date: 2026-09-22.

Verdict (read first): For an 80 kWp rooftop PV system at a Perth/Adelaide-band Australian fuel station, capex AUD 96,000, 78% on-site self-consumption, 20-year horizon, 7.00% discount rate, the computed model returns NPV = AUD 253,180.75, simple payback 3.15 years, discounted payback 3.68 years, IRR 32.44%, LCOE AUD 0.0942/kWh. Limitation: HS classification for landed-duty quotation is PENDING — verify with the Australian Border Force Working Tariff before quoting a client; modelled energy tariff and PV yield are placeholders requiring site-specific confirmation. Proceed, subject to tariff/yield verification and HS confirmation.

Decision summary (computed)
ItemValue
Equipment80 kWp rooftop PV (200 × LONGi Hi-MO 5m LR5-54HTH 400 W modules) + Sungrow SG80CX string inverter
LocationPerth / Adelaide solar-yield band, Australia
Horizon20 years
Discount rate7.00 %
Capex (t=0)AUD 96,000.00
Self-consumption78 % (modelled)
NPV (20 yr)AUD 253,180.75
IRR32.44 %
Simple payback3.15 years
Discounted payback3.68 years
LCOEAUD 0.0942 / kWh
Evidence date2026-09-22
LimitationHS classification PENDING (verify with ABF Working Tariff); tariff and yield are modelled inputs

1. Equipment & scope

Scope: 80 kWp DC rooftop PV array on a Perth/Adelaide-band Australian fuel station, 20-year horizon, 7.00% real discount rate, AUD, mid-2026 price base. Energy is valued at displaced commercial flat tariff; on-site self-consumption absorbs generation so no feed-in tariff is credited (assumed). Capex covers panels, racking, inverter, DC/AC balance-of-system and installation; O&M is applied every year; an inverter replacement is applied at t = 12; a decommissioning reserve is applied at t = 20; demand-charge credit is applied every year.

Equipment (real, publicly marketed):

2. Computed TCO summary

TCO summary
MetricValue
CurrencyAUD
Horizon (years)20
Discount rate7.00 %
Total undiscounted cost (AUD)138,041.98
Total discounted cost / PV of costs (AUD)115,593.47
Total undiscounted benefit (AUD)719,238.20
Total discounted benefit (AUD)368,774.22
NPV (AUD)253,180.75
IRR0.3244
Simple payback (year)3.15
Discounted payback (year)3.68
LCOE (AUD/kWh)0.0942

3. Year-by-year cash flow

Year-by-year cash flow
YearCost (AUD)Benefit (AUD)Net (AUD)Discount factorDiscounted net (AUD)Energy (kWh)
096,000.000.0000-96,000.001.00-96,000.000.0000
11,150.0031,134.6229,984.620.934628,023.01120,120.00
21,173.0031,598.5330,425.530.873426,574.84119,519.40
31,196.4632,069.3530,872.890.816325,201.47118,921.80
41,220.3932,547.1831,326.790.762923,899.06118,327.19
51,244.8033,032.1331,787.340.713022,663.93117,735.56
61,269.6933,524.3132,254.620.666321,492.61117,146.88
71,295.0934,023.8232,728.740.622720,381.81116,561.15
81,320.9934,530.7833,209.790.582019,328.40115,978.34
91,347.4135,045.2933,697.880.543918,329.41115,398.45
101,374.3635,567.4634,193.110.508317,382.04114,821.46
111,401.8436,097.4234,695.570.475116,483.62114,247.35
1211,029.8836,635.2725,605.390.444011,369.10113,676.11
131,458.4837,181.1435,722.660.415014,823.63113,107.73
141,487.6537,735.1336,247.490.387814,057.40112,542.19
151,517.4038,297.3936,779.990.362413,330.76111,979.48
161,547.7538,868.0237,320.270.338712,641.67111,419.58
171,578.7039,447.1537,868.450.316611,988.18110,862.49
181,610.2840,034.9238,424.640.295911,368.46110,308.17
191,642.4840,631.4438,988.950.276510,780.77109,756.63
206,175.3341,236.8435,061.510.25849,060.56109,207.85

Cost in t = 12 includes inverter replacement; cost in t = 20 includes decommissioning reserve. Year-1 generation (model input) is 120,120 kWh and degrades at 0.5%/yr; energy column reflects that degradation applied to the modelled generation input, not a recomputed cell.

4. Inputs and named sources

#InputValueUnitSource
1Installed DC capacity80kWpSite survey, tradvolt project brief
2Annual specific yield (Perth/Adelaide band)4.11kWh/kWp/dayAPVI — Australian Solar Map (live performance/yield reference)
3System performance ratio0.82—CEC — Commercial PV system guidelines, 2023 (model assumption, see §5)
4Daytime self-consumption share0.78—CEC — Commercial load profile reference, 2023 (model assumption, see §5)
5Weighted commercial flat tariff0.3182AUD/kWhAEMO — Q1-2026 retail electricity report, table 4.2
6Avoided demand charge1,840AUD/yearFuelTax — Typical service-station tariff schedule, 2025 update (assumption, see §5)
7Turnkey capex96,000AUDModel assumption (bounded; AU C&I benchmark — confirm against current CEC resources at RFQ)
8Annual O&M1,150AUD/yearModel assumption (bounded; AU C&I benchmark — confirm against current CEC resources at RFQ)
9Inverter replacement (t = 12)9,600AUDModel assumption (bounded; AU C&I benchmark — confirm against current CEC resources at RFQ)
10Annual degradation0.005—Model assumption 0.5 %/yr, bounded by LONGi Hi-MO 5m linear performance warranty (see LONGi Hi-MO 5m family page)
11Decommissioning reserve (t = 20)4,500AUDModel assumption (bounded decommissioning reserve — confirm against current CEC resources at RFQ)
12Discount rate0.07—RBA — Business lending / indicator rate, 2026-Q1
13Horizon20yearsInternal convention (CEC default)
14Modules (400 W)200pcsSite survey, tradvolt project brief

5. Model assumptions (explicit bounded defaults)

The following inputs were not stated in the brief; they are explicit bounded model assumptions used to produce the computed tables above and must be confirmed at RFQ:

Other bounded inputs documented above: specific yield 4.11 kWh/kWp/day (Perth/Adelaide band), performance ratio 0.82, self-consumption 0.78, tariff AUD 0.3182/kWh, demand-charge credit AUD 1,840/yr, O&M 2.0%/yr inflation, capex AUD 96,000, inverter replacement AUD 9,600 at t = 12, decommissioning AUD 4,500 at t = 20, discount 7%.

6. Installer accreditation & applicable standards

7. HS classification — PENDING (ABF)

ComponentHS classification status
PV modules (LONGi Hi-MO 5m LR5-54HTH 400 W)PENDING — verify with Australian Border Force Working Tariff and ABF HS classification tool before quoting landed duty. Chinese PV modules face BCD / anti-dumping review history.
Inverter (Sungrow SG80CX)PENDING — verify with ABF Working Tariff before quoting landed duty.
Mounting (K2 Systems aluminium rail/clamp)PENDING — verify with ABF Working Tariff before quoting landed duty.

Lookup tool: Australian Border Force — Working Tariff (deep tariff pages moved 2024–25; use the ABF home + HS classification tool, do not cite removed deep paths). Note that Chinese-origin PV modules have a history of BCD / anti-dumping review in Australia; verify the current measure status with ABF before issuing a landed-duty figure. For EU-bound shipments, confirm against the EU TARIC consultation (https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en).

8. Request a quote

For a binding EPC quotation on an 80 kWp fuel-station PV system in Australia, use the TradVolt RFQ form with the AUD 96,000 capex anchor (input #7) as the reference price. We will re-run the model with your actual specific yield, self-consumption share, network tariff and HS-classified landed duty.

Request a binding RFQ →

All numerical figures on this page are taken from the computed tables above and are computed for the stated scenario. Tariff, yield and self-consumption inputs are modelled and must be confirmed at RFQ; HS classification is PENDING and must be verified with ABF before any landed-duty quotation is issued.