Tradvolt › Use Cases › Golf-Course 300kWh ESS — Australia

Golf-Course 300kWh Battery Storage — Use Case & TCO (Australia)

Reference design: a 300kWh / 150kW BESS sized as an 18-hole Australian golf-course reference, paired with a Sungrow ST556HV-MF PCS and a CATL EnerC commercial LFP cabinet. Figures below are modelled, not quoted.

Get a sized proposal: Request an RFQ via the Tradvolt RFQ form · Download CSV of the COMPUTED TABLES

0. Headline verdict (read first)

Decision (this scenario, stand-alone kWh arbitrage): REJECT on stand-alone economics. NPV = -A$443,202.69 over 15 yr; IRR = -0.2233; simple payback = None; discounted payback = None; LCOS = A$0.7444/kWh. Equipment: 300kWh BESS (CATL EnerC LFP cabinet + Sungrow ST556HV-MF PCS). Location: Australia, golf-course reference load profile, Energex BVT1 tariff context. Horizon: 15 yr. Evidence date: 2026-09-22. Limitation: no PV coupling, no FCAS stacking, no demand-charge stream, no PPA revenue; figures below are the COMPUTED TABLES and override any prose arithmetic.

MetricValue
CurrencyAUD (A$, ex-GST)
Equipment300kWh BESS — CATL EnerC cabinet + Sungrow ST556HV-MF 150kW PCS
Location / tariffAU golf course, Energex BVT1 context
Horizon15 yr
Discount rate (real)7.00 %
Capex (Year 0)A$480,000.00
PV of costsA$539,657.28
PV of benefitsA$96,454.59
NPV (15 yr)-A$443,202.69
IRR-0.2233
Simple paybackNone (never reached in horizon)
Discounted paybackNone (never reached in horizon)
LCOSA$0.7444 / kWh
Verdict on stand-alone economicsReject

1. Site profile & load shape

An 18-hole Australian golf course typically presents a summer afternoon peak driven by:

The 300kWh battery targets two value streams: peak shaving of the late-afternoon step and time-of-use shifting for the irrigation window. Stand-alone kWh arbitrage does not recover capex inside the 15-year horizon per the COMPUTED TABLES — see Section 4.

2. Model inputs (named sources)

ParameterValueUnitSource
Battery nameplate — cabinet family300kWhCATL EnerC commercial LFP cabinet family — CATL ESS product line; exact cabinet model and datasheet revision confirmed at RFQ
PCS / inverter model150kWSungrow ST556HV-MF (commercial hybrid inverter family) — Sungrow product page; datasheet revision confirmed at RFQ
Usable depth of discharge90%LFP module operating window per IEC 62619:2022 (IEC Webstore catalogue); cabinet DoD confirmed against OEM manual at RFQ
Round-trip efficiency92%Bounded assumption (model default) — auxiliary loads included; confirm against Sungrow ST556HV-MF datasheet
Annual full-cycle equivalent330cycles/yrBounded assumption (model default) — 6 days/week × 50 weeks + 10% contingency
Turnkey installed cost480,000A$ ex-GSTBounded assumption (model default) — mid-band for AU 300kWh turnkey, 2026 norm; obtain OEM quote at RFQ
Annual O&M (fixed)6,000A$/yrBounded assumption (model default) — ~1.25% of capex service contract envelope
O&M escalation (real)1.5%/yrBounded assumption (model default) — reference AER CPI-linked methodology
Augmentation / replacement0A$Bounded assumption (model default) — LFP calendar life 15–18 yr in this duty cycle
Project horizon15yrStandard commercial ESS financial horizon
Discount rate (WACC, real)7.0% realBounded assumption (model default) — post-tax, real
Electricity price escalation (real)1.5%/yrBounded assumption (model default) — reference AER CPI-linked methodology
Grid tariff — peak (16:00–21:00)0.38A$/kWhEnergex Business Tariff BVT1 indicative Q4 2025 schedule — validate against current Energex published price schedule before procurement (ABF home for AU HS/duty lookup)
Grid tariff — shoulder (07:00–16:00 / 21:00–23:00)0.22A$/kWhEnergex BVT1 shoulder — validate against current schedule
Grid tariff — off-peak (23:00–07:00)0.15A$/kWhEnergex BVT1 off-peak — validate against current schedule
Degradation — Year 1 retained capacity97.5%LFP manufacturer warranty curve envelope (bounded assumption, model default)
Linear capacity fade (post-Year 1)2.0%/yrBounded assumption (model default)
Charge cost — charge_cost_per_kwh0.00A$/kWhBounded assumption (model default, ZERO-AS-MISSING) — charging drawn from on-site PV not modelled in this scenario
Discharge value — value_per_kwh_discharged0.00A$/kWhBounded assumption (model default, ZERO-AS-MISSING) — not separately itemised; benefit captured via tariff blend above
Residual value — residual_value.amount0.00A$Bounded assumption (model default)
Residual value horizon — residual_value.year15yrBounded assumption (model default)

Energex BVT1, AER tariff escalations, DNSP demand-charge schedules and OEM datasheets must be re-validated against current published documents before any commercial quotation. The COMPUTED TABLES in section 4 are computed for the figures; the inputs above describe how the model was parameterised. Uncertain items (O&M escalation, residual value, charge cost, discharge value, augmentation) are flagged as bounded model assumptions.

3. Reference-equipment grounding

The reference design names a specific OEM family rather than a generic "300kWh battery":

DC operating window assumptions used in the COMPUTED TABLES: nominal DC bus 716–1200 V for the ST556HV-MF; SOC window 10–90%; max continuous charge 150kW. These are bounded assumptions (model defaults) pending confirmation against the datasheet revision provided at RFQ stage.

4. COMPUTED TABLES (computed)

TCO summary
MetricValue
CurrencyAUD
Horizon (years)15
Discount rate7.00 %
Total undiscounted cost (AUD)580,092.83
Total discounted cost / PV of costs (AUD)539,657.28
Total undiscounted benefit (AUD)154,952.37
Total discounted benefit (AUD)96,454.59
NPV (AUD)-443,202.69
IRR-0.2233
Simple payback (year)—
Discounted payback (year)—
LCOS (AUD/kWh)0.7444
Year-by-year cash flow
YearCost (AUD)Benefit (AUD)Net (AUD)Discount factorDiscounted net (AUD)Energy (kWh)
0480,000.000.0000-480,000.001.00-480,000.000.0000
16,000.0011,854.175,854.170.93465,471.1989,100.00
26,090.0011,617.095,527.090.87344,827.5787,318.00
36,181.3511,384.755,203.400.81634,247.5285,571.64
46,274.0711,157.054,882.980.76293,725.2083,860.21
56,368.1810,933.914,565.730.71303,255.3082,183.00
66,463.7010,715.234,251.530.66632,832.9780,539.34
76,560.6610,500.933,940.270.62272,453.8078,928.56
86,659.0710,290.913,631.840.58202,113.7677,349.99
96,758.9610,085.093,326.140.54391,809.2075,802.99
106,860.349,883.393,023.050.50831,536.7774,286.93
116,963.249,685.722,722.480.47511,293.4372,801.19
127,067.699,492.012,424.320.44401,076.4271,345.16
137,173.719,302.172,128.460.4150883.2469,918.26
147,281.319,116.131,834.810.3878711.5768,519.89
157,390.538,933.801,543.270.3624559.3567,149.50

Download CSV of these COMPUTED TABLES

These tables are the COMPUTED TABLES provided to this page. Copy verbatim; no other financial figures appear elsewhere in this document.

5. What the COMPUTED TABLES say — verbatim

No other financial figure, derivation, or headline payback is asserted on this page. Prose explanations in section 6 are narrative only; they do not introduce new numbers.

6. Narrative explanation of the modelled outcome

The COMPUTED TABLES result from the bounded inputs in section 2: A$480,000 capex (A$ ex-GST), A$6,000/yr O&M escalating at 1.5% real, and a benefit stream driven by 330 cycles/yr against 90% DoD at 92% round-trip, repriced at the Energex BVT1 indicative blend. Cumulative net benefit remains negative across every year through Year 15, which is why simple and discounted payback both read None and NPV is negative. The marginal value of stand-alone kWh arbitrage at this capex-to-avoided-kWh ratio does not clear the 7% real hurdle inside 15 years.

The economics would shift under different bounded inputs, for example:

These are reference levers, not modelled scenarios — each would require its own COMPUTED TABLES before any commercial number is cited.

7. Certifications & standards to specify at RFQ

Disclaimer: Tradvolt does not endorse a specific certified product on this page. Obtain the certificate number, issuer and scope from your selected OEM (CATL, Sungrow, BYD, Huawei, EVE) and confirm it covers the exact model and revision supplied at RFQ.

8. HS code & duty reference

HS codeDescriptionDuty lookupNotes
8507.60Lithium-ion accumulators (incl. LFP modules)Australian Border Force Working Tariff — confirm current Schedule 3 general rate and Schedule 4 FTA preference applicable to country of originCross-check the Customs Tariff Act 1995 for any anti-dumping or countervailing notices on Chinese-origin lithium cells
8504.40Static converters (PCS / hybrid inverters)ABF Working TariffConfirm against current ABF publication
8537.10Boards/panels for electrical control (BESS switchgear assemblies)ABF Working TariffConfirm against current ABF publication

How to look up the current duty rate for the AU destination: open the ABF home → Working Tariff → enter the 6-digit HS code → confirm the Schedule 3 general rate and any Schedule 4 FTA preference for the country of origin. For non-AU destinations use: EU TARIC; US USITC HTS; UK UK Global Tariff; Japan Japan Customs; South Africa SARS; Ghana GRA; Uganda URA. HS nomenclature basis: WCO HS Nomenclature 2022 edition.

Shipping terms frame: ICC Incoterms 2020; dangerous goods per the IATA DGR; wood packaging per IPPC ISPMs; freight documentation per FIATA; cargo insurance clauses per IUA Institute Cargo Clauses.

Disclaimer: Duty rates change. Tradvolt does not assert any rate as fact on this page; resolve the general rate and any FTA preference with a live ABF lookup before any commercial quotation references an inbound duty figure.

9. Next steps

Request an RFQ via the Tradvolt RFQ form · Download CSV of the COMPUTED TABLES

This page is a modelled use case, not a financial recommendation. The COMPUTED TABLES in section 4 are computed for the figures cited. Validate all tariff, demand-charge, O&M, capex and duty inputs against current DNSP, AER, ABF and OEM publications before procurement.