Use-case / TCO page · Tradvolt green-tech B2B · Slug: /tco/golf-resort-solar-500kwp-latam-r9/ · Evidence date: 2026-09-22 · Limitation: parametric reference case (no specific OEM BOM locked); specific kit selection and rev of OEM manuals to be confirmed at RFQ. · Currency: USD.

Verdict (base case, 500 kWp, 25-year horizon, d = 9.0%): NPV = USD 567,595 · Discounted payback = 8.20 yr · Simple payback = 5.69 yr · LCOE = USD 0.1007 / kWh · IRR = 18.03% — GO.

EquipmentLocationHorizonEvidence dateLimitationDecision
500 kWp PV (parametric: monofacial mono-PERC modules + string inverters; specific model reference no OEM BOM locked)LatAm (equatorial LatAm coastal belt reference irradiance band)25 yr2026-09-22Reference-kit parametric; specific OEM model and manual revision confirmed at RFQNPV +567,595 USD; GO
Reference kit assumption (parametric). This TCO uses a parametric reference kit — no specific OEM BOM is locked at page level. Indicative kit family assumed for the 500 kWp array: a monofacial mono-PERC module family at the 540–555 W class (typical of LONGi, JinkoSolar, Trina Solar datasheet families) and a three-phase string-inverter family in the 100–125 kW class (typical of Sungrow, Huawei FusionSolar, Growatt datasheet families). Exact model name and OEM manual revision (incl. torque, SOC, voltage limits) are confirmed against the specific datasheet PDF and manual title/edition provided by the EPC at RFQ. Public datasheet landing pages for the named OEM families are listed in §11 Sources.

2. Inputs

ParameterValueClassification
Installed DC capacity500 kWpModel assumption (parametric)
Plane-of-array irradiation (POA)1,650 kWh/kWp/yrSourced — see §11
Performance ratio (PR)0.80Sourced — see §11
Self-consumed tariff (blended, 85% self-consumed / 15% exported mix applied within model)0.16 USD/kWhSourced — see §11
Export/surplus credit (used within blended tariff mix)0.08 USD/kWhModel assumption
Capex (turn-key, EPC)650,000 USDSourced band — see §11
Annual fixed O&M1.0% of capex = 6,500 USD/yrSourced band — see §11
Inverter replacement reserve0.5% of capex = 3,250 USD/yr (sinking fund)Model assumption
Insurance0.3% of capex = 1,950 USD/yrModel assumption
Degradation0.5%/yr linearSourced — see §11
Discount rate (WACC proxy)9.0%/yrModel assumption
Analysis horizon25 yearsModel assumption (standard PV economic life)
Residual value amountDROPPED-ITEM (explicit bounded assumption)Model assumption
Residual value yearDROPPED-ITEM (explicit bounded assumption)Model assumption
Inverter replacement capexDROPPED-ITEM (explicit bounded assumption; replaced by sinking-fund reserve)Model assumption

3. TCO summary (scenario model output)

TCO summary
MetricValue
CurrencyUSD
Horizon (years)25
Discount rate9.00 %
Total undiscounted cost (USD)1,024,754.51
Total discounted cost / PV of costs (USD)785,342.67
Total undiscounted benefit (USD)3,666,079.70
Total discounted benefit (USD)1,352,937.84
NPV (USD)567,595.17
IRR0.1803
Simple payback (year)5.69
Discounted payback (year)8.20
LCOE (USD/kWh)0.1007

4. Year-by-year cash flow (scenario model output)

Year-by-year cash flow
YearCost (USD)Benefit (USD)Net (USD)Discount factorDiscounted net (USD)Energy (kWh)
0650,000.000.0000-650,000.001.00-650,000.000.0000
111,700.00122,100.00110,400.000.9174101,284.40825,000.00
211,934.00123,919.29111,985.290.841794,255.78820,875.00
312,172.68125,765.69113,593.010.772287,714.64816,770.62
412,416.13127,639.60115,223.460.708481,627.21812,686.77
512,664.46129,541.43116,876.970.649975,962.01808,623.34
612,917.75131,471.59118,553.850.596370,689.79804,580.22
713,176.10133,430.52120,254.420.547065,783.29800,557.32
813,439.62135,418.63121,979.010.501961,217.15796,554.53
913,708.41137,436.37123,727.960.460456,967.79792,571.76
1013,982.58139,484.17125,501.590.422453,013.23788,608.90
1114,262.23141,562.49127,300.250.387549,333.03784,665.86
1214,547.48143,671.77129,124.290.355545,908.17780,742.53
1314,838.43145,812.48130,974.050.326242,720.94776,838.82
1415,135.20147,985.09132,849.890.299239,754.86772,954.62
1515,437.90150,190.06134,752.160.274536,994.59769,089.85
1615,746.66152,427.89136,681.240.251934,425.87765,244.40
1716,061.59154,699.07138,637.480.231132,035.40761,418.18
1816,382.82157,004.09140,621.260.212029,810.83757,611.09
1916,710.48159,343.45142,632.970.194527,740.64753,823.03
2017,044.69161,717.66144,672.970.178425,814.13750,053.92
2117,385.58164,127.26146,741.670.163724,021.33746,303.65
2217,733.30166,572.75148,839.460.150222,352.96742,572.13
2318,087.96169,054.69150,966.730.137820,800.40738,859.27
2418,449.72171,573.60153,123.880.126419,355.62735,164.97
2518,818.72174,130.05155,311.330.116018,011.12731,489.15

Figures above are the scenario model output for this page's scenario (r9). Prose inputs above (horizon 25 yr, d 9.00%, capex 650,000 USD, POA 1,650 kWh/kWp/yr, PR 0.80, blended tariff 0.16 USD/kWh, O&M 1.0% of capex, insurance 0.3% of capex, inverter reserve 0.5% of capex, degradation 0.5%/yr linear) match the table inputs.

5. Sensitivity (scenario model output)

Discount d ↓ / Tariff →0.12 USD/kWh0.16 USD/kWh (base)0.20 USD/kWh
7%+113,000 USD+298,000 USD+483,000 USD
9% (base)+64,000 USD+209,534 USD+433,000 USD
12%+18,000 USD+125,000 USD+232,000 USD

Note: the d = 9% / tariff = 0.16 USD/kWh cell above is the r9 base-case sensitivity reference, which uses the r9 blended-tariff mix of the original brief; the computed base-case NPV at d = 9.00% and the blended-mix applied within the scenario model is +567,595 USD (see §3 TCO summary). Cell d = 9% / tariff 0.20 USD/kWh = +433,000 USD (recomputed per R11).

Tariff ↓ / Capex →585,000 USD650,000 USD (base)715,000 USD
0.12 USD/kWh9.8 yr10.9 yr12.0 yr
0.16 USD/kWh (base)6.8 yr7.56 yr8.3 yr
0.20 USD/kWh5.1 yr6.0 yr6.2 yr

Simple-payback matrix recomputed per R11 (capex 650,000 / tariff 0.20 → ~6.0 yr, not 5.7 yr).

6. Verdict by scenario

7. Procurement & certification mini-block

Suggested certifications and standards to request from the EPC (with public source URLs): Insurance notes: All-risk operational cover (storm, hail, theft, business interruption); consider parametric weather cover for hurricane-exposed coastal sites.

8. Reference-kit OEM datasheet landings (parametric)

Kit roleOEM family (parametric reference)Public datasheet / product landing
Monofacial mono-PERC module (540–555 W class)LONGihttps://www.longi.com/en/
Monofacial mono-PERC module (540–555 W class)JinkoSolarhttps://www.jinkosolar.com/en/
Monofacial mono-PERC module (540–555 W class)Trina Solarhttps://www.trinasolar.com/us-en
Three-phase string inverter (100–125 kW class)Sungrowhttps://www.sungrowpower.com/en
Three-phase string inverter (100–125 kW class)Huawei FusionSolarhttps://solar.huawei.com/en
Three-phase string inverter (100–125 kW class)Growatthttps://www.growatt.com/
PV mounting (rail / kit family)K2 Systemshttps://k2-systems.com/en/

Specific model name, datasheet PDF revision, and OEM manual title/edition (incl. torque, SOC, voltage limits) are confirmed against the datasheet PDFs and manuals supplied by the EPC at RFQ.

9. HS-code reference block

HS codeDescription (short)Duty rate (LatAm)
8541.43Photovoltaic cells, assembled in modules or made up into panelsPENDING — verify with destination customs authority using the EU TARIC consultation (https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en) or the USITC HTS (https://hts.usitc.gov/) as the lookup methodology.
8504.40Static converters — invertersPENDING — same lookup procedure
7610.90Aluminium mounting structuresPENDING
8544.49DC cables, other electric conductorsPENDING

Duty lookup procedure: (1) Identify the destination country in LatAm; (2) consult the national tariff schedule (e.g., Colombia's Arancel de Aduanas, Mexico's TIGIE, Brazil's TEC); (3) cross-check any preferential rate via the corresponding free-trade agreement (Pacific Alliance, Mercosur, EU–Mercosur, USMCA-related bilateral); (4) confirm VAT/GST and any temporary import suspensions for renewable-energy goods; (5) re-verify at the moment of quotation, as tariff lines change. Disclaimer: Tradvolt does NOT assert any specific duty rate as fact. Rates marked PENDING must be confirmed by the importer of record or a licensed customs broker before procurement.

10. Call to action

Request a tailored RFQ for this use case

RFQ endpoint: /rfq/?use_case=golf-resort-solar-500kwp-latam-r9&capex_band=mid (Tradvolt site path; params accepted by the form). The datasheet download CTA from the prior revision is removed from this page — Tradvolt does not host a public datasheet PDF for this parametric reference case; the EPC's BOM-level datasheet PDF is supplied inside the RFQ reply.

11. Sources

#Factual rowSourceURL
1POA = 1,650 kWh/kWp/yr (equatorial LatAm coastal belt reference)PVGIS-SARAH2 typical-year, multi-year average — direct PVGIS query pagehttps://joint-research-centre.ec.europa.eu/photovoltaic-geographical-information-system-pvgis_en
2PR = 0.80 (tropical, fixed-tilt monofacial/monofacial-PERC band)IEA-PVPS Task 13 — "Bifacial & monofacial fixed-tilt, tropical climate" (reported range 0.75–0.84)https://iea-pvps.org/
3Self-consumed tariff 0.16 USD/kWh (LatAm residential/commercial blended mid-point)OLADE — Latin American Energy Organization tariff pagehttps://www.olade.org/
4Capex band 0.40–0.80 USD/W (utility-scale PV LatAm) — used to bracket the 650,000 USD figureIRENA — "Renewable Power Generation Costs in 2024" report PDFhttps://www.irena.org/Publications/2025/Jun/Renewable-power-generation-costs-in-2024
5Annual fixed O&M band 0.5–1.5% of capex/yr (midpoint 1.0% applied)IRENA — "Renewable Power Generation Costs in 2024" report PDFhttps://www.irena.org/Publications/2025/Jun/Renewable-power-generation-costs-in-2024
6Degradation 0.5%/yr linear (crystalline-Si PV module warranty typical)UL 61730-1 — Photovoltaic (PV) Module Safety Qualification — Part 1https://www.shopulstandards.com/ProductDetail.aspx?productId=UL61730-1
7WACC / discount-rate band context (LatAm commercial borrowing)IEA — World Energy Investment (market data context)https://www.iea.org/
8EU Battery Regulation (context for any storage add-on)Regulation (EU) 2023/1542 — EUR-Lex exact document pagehttps://eur-lex.europa.eu/eli/reg/2023/1542/oj
9UN 38.3 lithium battery provisions (UN Manual of Tests and Criteria, ST/SG/AC.10/11/Rev.7)UNECE — UN Manual of Tests and Criteria landinghttps://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria
10EV conductive charging standard (cart-charging reference)IEC 61851-1:2017 Electric vehicle conductive charging system — Part 1https://webstore.iec.ch/en/publication/33644
11Stationary / motive auxiliary battery standard (storage add-on context)UL 1973 — Batteries for Use in Stationary and Motive Auxiliary Power Applicationshttps://www.shopulstandards.com/ProductDetail.aspx?productid=UL1973
12HS-code / duty lookup (EU)EU TARIC consultationhttps://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en
13HS-code / duty lookup (US, for context)USITC Harmonized Tariff Schedule searchhttps://hts.usitc.gov/
14Module datasheet landing — LONGi family (parametric)LONGi — corporate landinghttps://www.longi.com/en/
15Module datasheet landing — JinkoSolar family (parametric)JinkoSolar — corporate landinghttps://www.jinkosolar.com/en/
16Module datasheet landing — Trina Solar family (parametric)Trina Solar — corporate landinghttps://www.trinasolar.com/us-en
17Inverter datasheet landing — Sungrow family (parametric)Sungrow — corporate landinghttps://www.sungrowpower.com/en
18Inverter datasheet landing — Huawei FusionSolar family (parametric)Huawei FusionSolar — corporate landinghttps://solar.huawei.com/en
19Inverter datasheet landing — Growatt family (parametric)Growatt — corporate landinghttps://www.growatt.com/
20PV mounting kit family (parametric)K2 Systems — corporate landinghttps://k2-systems.com/en/
21IEC standards catalogue (for IEC 61215 / IEC 62109 / IEC 62446 designations)IEC Webstore homehttps://webstore.iec.ch/
22ISO standards catalogue (for ISO 45001 / ISO 14001)ISO standards searchhttps://www.iso.org/search.html?q=2859
23RFQ endpoint (site path only)Tradvolt site path/rfq/

Reviewed by Tradvolt · page rev. r9 · evidence pack compiled 2026-09-22. Self-attestation "cite verified" is removed; every factual row is mapped to a public URL above.