Verdict at a glance

For a 600 kWh LFP-based ESS (CATL EnerC 1P280S-class battery cabinet paired with a Sungrow ST2752UX-class PCS), deployed across a multi-site gym chain in the Middle East and Africa over a 10-year horizon at an 8.00% discount rate, the scenario TCO model returns NPV = -176,810.03 USD (discounted benefit fails to recover discounted cost within the horizon), simple payback = not achieved within 10 years, discounted payback = not achieved within 10 years, and LCOS = 0.3138 USD/kWh (PV of costs 315,953.11 USD divided by lifetime discounted throughput 1,006,210.24 kWh). The project does not recover capex on these inputs. Procurement should be paused pending a tariff review, an opex renegotiation, or a smaller first-site pilot. Limitation: the run is a single-scenario deterministic model; no Monte Carlo or sensitivity sweep is included on this page.

Decision inputValue
Equipment600 kWh LFP ESS (CATL EnerC-class battery cabinet + Sungrow ST2752UX-class PCS)
LocationMiddle East and Africa (MEA), multi-site gym chain
Horizon10 years
Discount rate8.00%
NPV (USD)-176,810.03
Simple payback (years)None within horizon
Discounted payback (years)None within horizon
LCOS (USD/kWh)0.3138
Evidence date2026-09-22
RecommendationDo not procure at scale on these inputs. Re-run after tariff/opex review.

1. Inputs

Only inputs that drive a number on this page are listed. Each is either (a) bounded by the scenario model and copied from the computed tables, or (b) presented as an explicit bounded model assumption where the draft was silent.

InputValueUnitBasis
System size600kWh (usable)Model input (matches tables)
Discount rate8.00%Model input (matches tables)
Capex, turnkey (Year 0)240,000.00USD per siteModel input (matches tables)
Annual opex (Year 1)6,000.00USD per site per yearModel input (matches tables)
Opex inflation2.0% per yearModel input (matches tables: 6,000 → 7,170.56 over 10 years)
End-of-life replacement reserve (Year 8)60,000.00USD per siteModel input (matches tables: Year 8 cost = 66,892.11 = 6,756.97 opex + 60,000 EOL)
Annual energy throughput (Year 1)162,000.00kWhModel input (matches tables)
Throughput degradation2.0% per yearModel input (matches tables: 162,000 → 135,067.14 over 10 years)
Benefit rate (Year 1, undiscounted)0.1382USD/kWh effectiveDerived by the model: 22,386.93 / 162,000.00
Benefit trajectory-2.0% per year (effective yield)Model input (matches tables: 22,386.93 → 18,665.05 over 10 years)
Residual value (terminal)0USDModel assumption (bounded default; not present in original draft)
Residual value applied at year10yearModel assumption (bounded default)
ESS usable percentage (asset.ess.usable_pct)100% of nameplateModel assumption (bounded default; nameplate = usable at this stage)
ESS round-trip efficiency (asset.ess.round_trip_eff)90%Model assumption (bounded default; typical LFP utility-scale value)
Charge cost (asset.ess.charge_cost_per_kwh, ZERO-AS-MISSING)0.00USD/kWhModel assumption (bounded default; off-peak charging is treated as netted inside the benefit rate)
ESS cycles per year270cycles/yearModel assumption (bounded default; 600 kWh × 270 = 162,000 kWh/yr aligns with Year-1 throughput)
ESS degradation2.0% throughput/yearModel assumption (bounded default; matches throughput column)

Items above marked "Model assumption (bounded default)" were not stated in the original draft. They are presented here as explicit bounded assumptions so that the computed numbers can be reproduced; they are not cited sourced facts.

2. Computed TCO summary (computed)

TCO summary
MetricValue
CurrencyUSD
Horizon (years)10
Discount rate8.00 %
Total undiscounted cost (USD)365,698.33
Total discounted cost / PV of costs (USD)315,953.11
Total undiscounted benefit (USD)204,758.89
Total discounted benefit (USD)139,143.08
NPV (USD)-176,810.03
IRR-0.2411
Simple payback (year)—
Discounted payback (year)—
LCOS (USD/kWh)0.3138

LCOS formula used on this page: LCOS = PV of costs ÷ lifetime discounted throughput. PV of costs = 315,953.11 USD. Lifetime discounted throughput = sum of (annual kWh × discount factor) over Years 1–10 = 1,006,210.24 kWh. LCOS = 315,953.11 / 1,006,210.24 = 0.3138 USD/kWh.

3. Computed year-by-year cash flow (computed)

Year-by-year cash flow
YearCost (USD)Benefit (USD)Net (USD)Discount factorDiscounted net (USD)Energy (kWh)
0240,000.000.0000-240,000.001.00-240,000.000.0000
16,000.0022,386.9316,386.930.925915,173.08162,000.00
26,120.0021,939.1915,819.190.857313,562.40158,760.00
36,242.4021,500.4015,258.000.793812,112.30155,584.80
46,367.2521,070.4014,703.150.735010,807.25152,473.10
56,494.5920,648.9914,154.400.68069,633.24149,423.64
66,624.4820,236.0113,611.520.63028,577.57146,435.17
76,756.9719,831.2913,074.310.58357,628.74143,506.47
866,892.1119,434.66-47,457.450.5403-25,639.78140,636.34
97,029.9619,045.9712,016.010.50026,011.00137,823.61
107,170.5618,665.0511,494.500.46325,324.18135,067.14

Reading the table: undiscounted lifetime benefit (204,758.89 USD) is below undiscounted lifetime cost (365,698.33 USD) and never crosses it within the 10-year window, so cumulative undiscounted net remains negative (final year = -160,939.44 USD on a simple sum, consistent with payback = None). Once discounted at 8.00%, benefit falls to 139,143.08 USD against a PV of cost of 315,953.11 USD, producing the negative NPV above. The Year-8 end-of-life replacement reserve (60,000 USD line embedded in the 66,892.11 USD cost) is what locks the undiscounted payback past the horizon.

4. Equipment identification

The 600 kWh ESS in this scenario is treated as an LFP battery cabinet of the CATL EnerC 1P280S class paired with a Sungrow ST2752UX-class PCS. CATL EnerC and Sungrow ST2752UX are real, publicly marketed product families. The exact model number, cabinet count, and PCS rating shown on this page are placeholder-class identifiers and are not asserted as the final shipment configuration; final selection is confirmed against the vendor dossier and the relevant OEM manual revision at the RFQ stage. No limits (torque, SOC window, DC voltage envelope, max charge/discharge current) are asserted on this page.

5. Certifications (procurement checkpoints)

The following standards are procurement checkpoints for the equipment classes named above. Final certificate numbers must be issued per shipment from the vendor dossier before goods are released; this page does not assert that any specific shipment holds any specific certificate.

6. HS / duty lookup pointers

Indicative HS codes are listed below for classification only. National duty rates are NOT asserted on this page; the original draft's "PENDING" markings are retained by policy because rates fluctuate with trade-agreement preferences and must be checked at destination customs. Use the official lookup tools linked below; this page does not assert any specific national duty.

ComponentHS code (lookup only)Indicative duty (MEA)Status
Lithium-ion accumulator, modules and packs8507.60PENDINGVerify at destination customs
Power conversion system (PCS)8504.40PENDINGVerify at destination customs
Battery management system8537.10PENDINGVerify at destination customs
Enclosures, racks, and balance-of-system steel7326.90PENDINGVerify at destination customs

Official lookup tools (cite the home or canonical page; do not invent deep URLs):

Logistics references (cited by programme name; no deep URLs invented): ICC Incoterms 2020 (https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/); IATA Dangerous Goods Regulations (https://www.iata.org/en/programs/cargo/dgr/); IPPC ISPM 15 wood packaging (https://www.ippc.int/en/core-activities/standards-setting/ispms/); FIATA freight documents (https://fiata.org/).

7. Calls to action

Issue the indicative RFQ through the TradVolt RFQ desk:

https://tradvolt.com/rfq/

No datasheet download is offered on this page. Per the output contract, deep /datasheets/ paths and mailto-labelled downloads are not used; datasheet packs are released against a confirmed RFQ.