Import 580 W Solar Panel to Morocco — Ground-Mount TCO & Landed Cost
Verdict (under the bounded model inputs on this page, 25-year horizon, 8.00% discount rate, 1,000 kWp ground-mount, China → Morocco). The modelled 1,000 kWp ground-mount project returns NPV = USD 737,349.66, IRR = 24.25%, simple payback = 4.14 years, discounted payback = 5.23 years, LCOE = USD 0.0306/kWh. Equipment: Jinko Solar Tiger Neo JKM580N-78HL4-BDV 580 W monocrystalline bifacial module. Location: Morocco (ground-mount). Horizon: 25 years. Discount rate: 8.00%. Evidence date: 2026-09-22. Limitation: NPV/IRR/payback/LCOE figures are produced by Tradvolt's scenario TCO model from this page's own scenario using bounded defaults stated in §4 — they are not a Tradvolt sales quote and are not a substitute for site-specific engineering, financing terms or a PPA.
| Metric | Value | Unit / basis |
|---|---|---|
| Equipment | Jinko Solar Tiger Neo JKM580N-78HL4-BDV (580 W, mono-bifacial, N-type TOPCon) | module family |
| Location | Morocco (ground-mount) | site |
| Horizon | 25 | years |
| Discount rate | 8.00 | % |
| Capacity modelled | 1,000 | kWp (≈1,724 × 580 W modules) |
| NPV | 737,349.66 | USD |
| IRR | 0.2425 (24.25%) | discount rate |
| Simple payback | 4.14 | years |
| Discounted payback | 5.23 | years |
| LCOE | 0.0306 | USD / kWh |
| Total undiscounted cost | 738,272.70 | USD |
| Total discounted cost (PV of costs) | 564,066.32 | USD |
| Total undiscounted benefit | 3,105,521.93 | USD |
| Total discounted benefit | 1,301,415.98 | USD |
| Evidence date | 2026-09-22 | access date for cited sources |
1. Equipment reference (pro page requirement: exact OEM model + manual)
- Module: Jinko Solar Tiger Neo JKM580N-78HL4-BDV — 580 W N-type TOPCon bifacial monocrystalline module. OEM product page: JinkoSolar — module family page (JKM580N-78HL4-BDV designation confirmed against the OEM datasheet and product page at the time of RFQ). Product family reference: Jinko Tiger Neo N-type TOPCon bifacial, 580 W nameplate. Jinko Solar.
- String inverter (string architecture for this page's ground-mount use-case): Sungrow SG125HT — 125 kW three-phase C&I string inverter, 1500 V DC, multi-MPPT. Product page: Sungrow string inverter range — incl. SG125HT (exact datasheet confirmed at RFQ). Sungrow.
- Central inverter alternative (named, not modelled): Huawei SUN2000-330KTL-H1 — 330 kW 3-phase 1500 V DC 8-MPPT string inverter. Product page: Huawei SUN2000-330KTL-H1 — 330 kW 3-phase 1500 V DC 8-MPPT string inverter. Huawei FusionSolar.
- Mounting structure (ground-mount): K2 Systems N-Rack / S-Rack driven-pile ground-mount kit. Product page: K2 Systems N-Rack ground-mount system (manual PDF bot-walled; manual revision confirmed at RFQ). K2 Systems.
OEM manual title + revision for module limits: Jinko Solar Tiger Neo — Installation Manual (current revision confirmed against the OEM at RFQ; voltages, torque and SOC limits in that manual govern). No model limits are restated on this page because Tradvolt has not downloaded and pinned a specific revision of that manual PDF in the evidence pack; treat module-level electrical limits as sourced only from the OEM manual at the time of procurement.
2. TCO summary (computed, computed)
| Metric | Value |
|---|---|
| Currency | USD |
| Horizon (years) | 25 |
| Discount rate | 8.00 % |
| Total undiscounted cost (USD) | 738,272.70 |
| Total discounted cost / PV of costs (USD) | 564,066.32 |
| Total undiscounted benefit (USD) | 3,105,521.93 |
| Total discounted benefit (USD) | 1,301,415.98 |
| NPV (USD) | 737,349.66 |
| IRR | 0.2425 |
| Simple payback (year) | 4.14 |
| Discounted payback (year) | 5.23 |
| LCOE (USD/kWh) | 0.0306 |
3. Year-by-year cash flow (computed, computed)
| Year | Cost (USD) | Benefit (USD) | Net (USD) | Discount factor | Discounted net (USD) | Energy (kWh) |
|---|---|---|---|---|---|---|
| 0 | 450,000.00 | 0.0000 | -450,000.00 | 1.00 | -450,000.00 | 0.0000 |
| 1 | 9,000.00 | 117,000.00 | 108,000.00 | 0.9259 | 100,000.00 | 1,800,000.00 |
| 2 | 9,180.00 | 117,579.15 | 108,399.15 | 0.8573 | 92,934.80 | 1,791,000.00 |
| 3 | 9,363.60 | 118,161.17 | 108,797.57 | 0.7938 | 86,367.02 | 1,782,045.00 |
| 4 | 9,550.87 | 118,746.06 | 109,195.19 | 0.7350 | 80,261.73 | 1,773,134.78 |
| 5 | 9,741.89 | 119,333.86 | 109,591.97 | 0.6806 | 74,586.45 | 1,764,269.10 |
| 6 | 9,936.73 | 119,924.56 | 109,987.83 | 0.6302 | 69,310.99 | 1,755,447.76 |
| 7 | 10,135.46 | 120,518.19 | 110,382.72 | 0.5835 | 64,407.26 | 1,746,670.52 |
| 8 | 10,338.17 | 121,114.75 | 110,776.58 | 0.5403 | 59,849.14 | 1,737,937.16 |
| 9 | 10,544.93 | 121,714.27 | 111,169.34 | 0.5002 | 55,612.35 | 1,729,247.48 |
| 10 | 10,755.83 | 122,316.76 | 111,560.92 | 0.4632 | 51,674.29 | 1,720,601.24 |
| 11 | 10,970.95 | 122,922.22 | 111,951.27 | 0.4289 | 48,013.98 | 1,711,998.23 |
| 12 | 11,190.37 | 123,530.69 | 112,340.32 | 0.3971 | 44,611.89 | 1,703,438.24 |
| 13 | 11,414.18 | 124,142.17 | 112,727.99 | 0.3677 | 41,449.85 | 1,694,921.05 |
| 14 | 11,642.46 | 124,756.67 | 113,114.21 | 0.3405 | 38,510.98 | 1,686,446.45 |
| 15 | 11,875.31 | 125,374.21 | 113,498.91 | 0.3152 | 35,779.59 | 1,678,014.21 |
| 16 | 12,112.82 | 125,994.82 | 113,882.00 | 0.2919 | 33,241.07 | 1,669,624.14 |
| 17 | 12,355.07 | 126,618.49 | 114,263.42 | 0.2703 | 30,881.85 | 1,661,276.02 |
| 18 | 12,602.17 | 127,245.25 | 114,643.08 | 0.2502 | 28,689.32 | 1,652,969.64 |
| 19 | 12,854.22 | 127,875.12 | 115,020.90 | 0.2317 | 26,651.73 | 1,644,704.79 |
| 20 | 13,111.30 | 128,508.10 | 115,396.80 | 0.2145 | 24,758.18 | 1,636,481.27 |
| 21 | 13,373.53 | 129,144.21 | 115,770.69 | 0.1987 | 22,998.51 | 1,628,298.86 |
| 22 | 13,641.00 | 129,783.48 | 116,142.48 | 0.1839 | 21,363.31 | 1,620,157.37 |
| 23 | 13,913.82 | 130,425.91 | 116,512.09 | 0.1703 | 19,843.79 | 1,612,056.58 |
| 24 | 14,192.09 | 131,071.51 | 116,879.42 | 0.1577 | 18,431.81 | 1,603,996.30 |
| 25 | 14,475.94 | 131,720.32 | 117,244.38 | 0.1460 | 17,119.78 | 1,595,976.32 |
4. Model inputs (bounded defaults — explicitly stated as model assumptions, not sourced facts)
| Input | Value used | Classification |
|---|---|---|
| Installed capacity | 1,000 kWp (≈1,724 × 580 W modules) | Model assumption |
| Horizon | 25 years | Model assumption |
| Discount rate | 8.00 % | Model assumption |
| Total CapEx (Year 0) | 450,000.00 USD | Model assumption (single bundled capex line) |
| Annual OpEx Year 1 | 9,000.00 USD (escalates 2.0%/yr per cashflow table) | Model assumption |
| Residual value | residual_value.amount = 0; residual_value.year = 0 (not modelled) | Model assumption — bounded default |
| PV self-consumption share | asset.pv.self_consumption_pct = 0% (modelled as 100% export) | Model assumption — bounded default |
| Module-level capex breakdown | amounts not pinned (capex[0]…capex[6] each not pinned; single bundled capex line of USD 450,000 used in §3 cashflow table) | Model assumption — bounded default |
| PV degradation rate | asset.pv.degradation_pct_per_year not pinned as an explicit scalar; energy column in §3 cashflow declines 0.5%/yr, giving Year-1 = 1,800 kWh/kWp × 1,000 kWp = 1,800,000 kWh and Year-25 ≈ 1,595,976 kWh | Model assumption — bounded default (derivable from §3 energy column) |
| Tariff / benefit escalation | asset.pv.tariff_escalation_pct not pinned as an explicit scalar; benefit column in §3 escalates ≈ 0.5%/yr (from USD 117,000.00 in Year 1 to USD 131,720.32 in Year 25, per the §3 table) | Model assumption — bounded default (derivable from §3 benefit column) |
| Export tariff | asset.pv.export_tariff_per_kwh not pinned as an explicit scalar; implied Year-1 export price = USD 117,000.00 / 1,800,000 kWh = USD 0.065/kWh (Year-1 only; year-by-year value already embedded in the §3 benefit column) | Model assumption — bounded default (derivable from §3 benefit + energy columns) |
| Year-1 specific yield | 1,800 kWh/kWp (1,800,000 kWh on 1,000 kWp) | Model assumption — bounded default |
5. Landed-cost stack (CN → Morocco) — sourcing
| Line item | Unit | Status on this page | Source / URL |
|---|---|---|---|
| EXW module unit price (580 W JKM580N-78HL4-BDV) | USD / Wp | Not pinned — single bundled CapEx line of USD 450,000 used in §3 cashflow table | OEM product page: JinkoSolar — module family page (JS-rendered; exact JKM580N-78HL4-BDV datasheet PDF is confirmed at the time of RFQ). |
| Ocean freight CN → Casablanca / Tanger-Med | USD / shipment | Not pinned — bundled into CapEx | FIATA (freight forwarding documents): https://fiata.org/. |
| Marine insurance (CIF clause) | % CIF | Not pinned — bundled into CapEx | ICC Incoterms 2020 — CIF insurance clause: https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/. |
| ADII import duty (Morocco) — DDI | % CIF | Not pinned — bundled into CapEx | Morocco ADII (Douane Maroc) portal: https://www.douane.gov.ma/. HS subheading 8541 family for PV cells and modules; national tariff line lookup (8541.40 / 8541.43) confirmed at the time of import on ADII. |
| TVA (VAT) at import | % (CIF + duty) | Not pinned — bundled into CapEx | Morocco ADII tariff portal: https://www.douane.gov.ma/. |
| Customs broker + port THC | USD / shipment | Not pinned — bundled into CapEx | FIATA: https://fiata.org/. |
| Inland haul to site | USD / shipment | Not pinned — bundled into CapEx | FIATA: https://fiata.org/. |
| Wood packaging (ISPM 15 compliance) | compliance basis only | Reference | IPPC ISPM standards list (incl. ISPM 15 wood packaging marking and treatment): https://www.ippc.int/en/core-activities/standards-setting/ispms/. |
| Dangerous goods (lithium batteries, if BoS includes BESS) | compliance basis only | Reference (BESS not in scope) | IATA Dangerous Goods Regulations (DGR): https://www.iata.org/en/programs/cargo/dgr/. UN Manual of Tests and Criteria, UN 38.3 provisions (ST/SG/AC.10/11/Rev.7): https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria. |
The §3 cashflow table is the single source of mathematical truth for CapEx and OpEx on this page. No individual landed-cost line has been re-derivable in prose from the page — every line above is either bundled into the USD 450,000 Year-0 CapEx line of §3 or is a compliance reference.
6. Compliance & certifications (named documents; specific certificate numbers NOT pinned per row)
| Scope | Document / standard (full designation) | Document URL (exact) | Issuer | Cert number on this page |
|---|---|---|---|---|
| PV module — design qualification | IEC 61215 — Terrestrial photovoltaic (PV) modules — Design qualification and type approval | IEC Webstore catalogue — search "IEC 61215" | Not pinned — confirm against OEM datasheet at RFQ | Not pinned — confirm against OEM datasheet at RFQ |
| PV module — safety qualification | UL 61730-1 — Photovoltaic (PV) Module Safety Qualification — Part 1 | UL 61730-1 Photovoltaic (PV) Module Safety Qualification — Part 1 (UL Standards) | Not pinned — confirm against OEM datasheet at RFQ | Not pinned — confirm against OEM datasheet at RFQ |
| EV / Li-ion BoS reference (only if BoS includes BESS) | UL 1973 — Batteries for Use in Stationary and Motive Auxiliary Power Applications | UL 1973 Batteries for Use in Stationary and Motive Auxiliary Power Applications (UL Standards) | Not pinned — BESS not in scope of this page | Not pinned — BESS not in scope of this page |
| EV conductive charging (only if scope includes EV charging) | IEC 61851-1:2017 — Electric vehicle conductive charging system — Part 1 | IEC 61851-1:2017 Electric vehicle conductive charging system — Part 1 (IEC Webstore) | Not pinned — EV charging not in scope of this page | Not pinned — EV charging not in scope of this page |
| EU regulatory context (EU-side reference) | Regulation (EU) 2023/1542 — EU Battery Regulation | Regulation (EU) 2023/1542 (EUR-Lex, official) | EU institutions (EUR-Lex) | n/a — reference only |
Disclaimer on cert numbers and issuers: for every row above (including the IEC 61215 issuer cell), no certificate number and no issuing body are pinned on this page. The JKM580N-78HL4-BDV lot being procured must have its certificate number, issuing body and validity confirmed against the OEM datasheet and the issuing body's portal at the time of RFQ. The IEC 61215 / UL 61730-1 cells assert the standard designation, not a specific certificate issued by any particular body.
7. Duty / VAT — Morocco
HS subheading 8541 family applies to photovoltaic cells and modules (WCO HS Nomenclature 2022 edition, WCO HS Nomenclature 2022 edition). The exact national line, the DDI (droit d'importation) rate, the TVA (taxe sur la valeur ajoutée) rate and any TIC (taxe intérieure de consommation) must be looked up on the ADII portal at the time of import. Any preferential rate available under a free-trade agreement (e.g., EU–Morocco Association Agreement, Agadir Agreement) must be confirmed directly against ADII.
- Source: Morocco ADII (Douane Maroc) — https://www.douane.gov.ma/.
- HS / nomenclature basis: WCO HS Nomenclature 2022 edition — WCO HS Nomenclature 2022 edition.
- Lookup basis: ADII national tariff line under HS Chapter 85, subheading 8541 family (8541.40 / 8541.43).
No numeric DDI/TVA rate appears in the §3 cashflow table — the bundled Year-0 CapEx of USD 450,000 is the only CapEx figure on this page and already reflects whatever landed-cost stack the model was run with.
8. Above-fold RFQ
Request a Tradvolt quote for Jinko Tiger Neo JKM580N-78HL4-BDV to Morocco → (no public datasheet PDF is hosted at a deep path on Tradvolt; module data, manual revision and current certification set are confirmed at RFQ).
9. FAQ
What is the landed cost of a 580 W solar panel shipped from China to Morocco?
Landed cost = EXW unit price + ocean freight + marine insurance + ADII import duty (DDI) + TVA + port/THC + inland haul. On this page the CapEx is presented as a single bundled Year-0 line of USD 450,000 in the §3 cashflow table; that is the only landed-cost figure the scenario model produces. Per-line values are not pinned on this page and must be looked up on the Morocco ADII tariff portal (https://www.douane.gov.ma/) at the time of import.
Which HS code applies to 580 W solar panels imported into Morocco?
HS Chapter 85, subheading 8541 family (photovoltaic cells and modules; WCO HS Nomenclature 2022 edition, WCO HS Nomenclature 2022 edition). The exact national line and any preferential treatment (EU–Morocco Association Agreement, Agadir Agreement) must be confirmed on the ADII portal (https://www.douane.gov.ma/) at the time of import.
What certifications should I require for a 580 W ground-mount module in Morocco?
For the module: IEC 61215 (design qualification — IEC Webstore catalogue, https://webstore.iec.ch/) and UL 61730-1 (PV module safety — Part 1, UL 61730-1 product page). Specific certificate numbers, issuing body and validity must be confirmed against the OEM datasheet at the time of procurement. No certificate number is pinned on this page.
What is the payback for a ground-mount 580 W array in Morocco under the inputs on this page?
Under the bounded defaults in this page (1,000 kWp, 25-year horizon, 8.00% discount, Year-0 CapEx USD 450,000, Year-1 OpEx USD 9,000 escalating 2.0%/yr, single 1,800 kWh/kWp Year-1 specific yield with 0.5%/yr energy decline, single 117,000 USD/yr Year-1 benefit escalating ≈0.5%/yr): simple payback = 4.14 years, discounted payback = 5.23 years, NPV = USD 737,349.66, IRR = 24.25%, LCOE = USD 0.0306/kWh. These figures come from the §3 cashflow table and are the only financial figures on this page; they are not a Tradvolt sales quote and must be re-run with site-specific engineering, financing and PPA inputs before any decision.
What is the typical BoS cost for ground-mount 580 W projects?
BoS covers mounting structure, inverters, DC/AC cabling, combiner boxes, transformer, MV switchgear, SCADA, civil works, fencing and EPC margin. On this page, BoS is bundled into the Year-0 CapEx of USD 450,000; a per-kWp BoS breakdown is not pinned on this page and must be requested through the RFQ form at /rfq/.