Tradvolt | CN → World Green-Tech Export | Vertical: EVSE

Import 60 kW DC EVSE from China to Panama — Highway-Corridor-60kW TCO & Landed Cost

Answer-first verdict: NPV = −USD 280,396 over a 25-year horizon at an 8.00% discount rate. Simple payback = none within the horizon; discounted payback = none within the horizon. TCO per km — EV = USD 0.287 vs ICE = USD 0.232 (savings per km = −USD 0.055; savings over horizon = −USD 13,750). At baseline bounded assumptions, the EV TCO per km is higher than ICE, not lower.

Equipment: Starcharge i60 60 kW DC fast charger (OEM datasheet cited below; certificate pack PENDING).

Location: Highway-corridor site, Republic of Panama.

Horizon: 25 years (financial model); fleet TCO comparison = 10,000 km/yr/vehicle (bounded assumption).

Evidence date: 2026-09-22.

Limitation: Illustrative — NOT A QUOTE. Panama DAI/ITBM rates, ocean freight and OEM unit price are marked PENDING — lookup and must be confirmed via the RFQ workflow.

Decision snapshot (illustrative baseline, from COMPUTED tables)
Decision metricValue
NPV (USD)-280,396.10
IRRn/a
Simple payback (years)—
Discounted payback (years)—
TCO per km — EV (USD/km)0.2870
TCO per km — ICE (USD/km)0.2320
Savings per km (USD/km)-0.0550
Savings over horizon (USD)-13,750.00
Tariff / VAT status (Panama DAI + ITBM)PENDING — lookup (Panama ANA)
Request Quote — replies in 48h

1. Use-Case Scope

Use-case: highway-corridor-60kw. One Starcharge i60 60 kW DC fast charger deployed at a service-area or rest-stop site along a Panamanian highway corridor, supporting CCS2-equipped light-duty EVs with intermittent utilization between long-distance trips. The fleet TCO comparison (EV vs ICE) is a separate bounded model assumption (see §3 and §10) and is not derived from charger utilisation alone.

2. Equipment Reference (OEM-Specific)

ItemValue
OEM brandStarcharge (Star Charge / Nanjing Star Charge Technology Co., Ltd.)
Product modelStarcharge i60 (PENDING — direct product-page URL not publicly indexable on OEM site as of publication; name verbatim from OEM catalog)
Equipment familyi Series — 60 kW DC fast charger
Rated DC output power60 kW
Output voltage range200–1000 V DC (PENDING — verify at RFQ against OEM datasheet)
Output current (max)≤ 200 A DC (PENDING — verify at RFQ against OEM datasheet)
ConnectorCCS2 (PENDING — verify at RFQ against OEM datasheet)
OEM datasheet / manual titleStarcharge i60 — Datasheet and User Manual (revision PENDING — confirm at RFQ)
Standards cited by OEMIEC 61851-1:2017, IEC 61851-23:2014/AMD1:2023, OCPP 1.6J / 2.0.1
Public datasheet / product pagehttps://www.starcharge.com/en/ (OEM root — direct product-page URL PENDING; deep JS-rendered links confirm exact revision at RFQ)
[Claim: OEM root for Starcharge product catalog (incl. i60) | Src: Starcharge / Star Charge | URL: https://www.starcharge.com/en/ | accessed 2026-09-22 | direct i60 product PDF PENDING — not publicly indexable as of publication]

OEM datasheet revision, exact output-voltage window and connector configuration are model assumptions pending confirmation at RFQ against the OEM manual. Tradvolt does not warrant any specific Starcharge i60 revision until the buyer receives the OEM certificate pack.

3. TCO Summary (COMPUTED — computed)

TCO summary
MetricValue
CurrencyUSD
Horizon (years)25
Discount rate8.00 %
Total undiscounted cost (USD)647,560.54
Total discounted cost / PV of costs (USD)289,469.66
Total undiscounted benefit (USD)21,250.00
Total discounted benefit (USD)9,073.56
NPV (USD)-280,396.10
IRRn/a
Simple payback (year)—
Discounted payback (year)—
TCO per km — EV (USD/km)0.2870
TCO per km — ICE (USD/km)0.2320
Savings per km (USD/km)-0.0550
Savings over horizon (USD)-13,750.00
[Claim: Total undiscounted cost 647,560.54 USD | Src: Tradvolt scenario TCO model — COMPUTED TABLE §3 (verbatim) | matched inputs: CapEx 55,000 + Σ(yr 1–25 opex 18,500×(1.02)^(t−1))]
[Claim: PV of costs 289,469.66 USD at 8% | Src: Tradvolt scenario TCO model — COMPUTED TABLE §3 (verbatim) | matched inputs: discount rate 8.00%, horizon 25 yr]
[Claim: Total undiscounted benefit 21,250.00 USD | Src: Tradvolt scenario TCO model — COMPUTED TABLE §3 (verbatim) | matched inputs: 850 USD × 25 yr]
[Claim: PV of benefits 9,073.56 USD at 8% | Src: Tradvolt scenario TCO model — COMPUTED TABLE §3 (verbatim) | matched inputs: discount rate 8.00%, horizon 25 yr]
[Claim: NPV −280,396.10 USD | Src: Tradvolt scenario TCO model — COMPUTED TABLE §3 (verbatim) | basis: PV(benefits) − PV(costs)]
[Claim: TCO per km — EV 0.2870 USD/km | Src: Tradvolt scenario TCO model — COMPUTED TABLE §3 (verbatim) | basis: total lifetime cost / (10,000 km × 25 yr × 1 vehicle)]
[Claim: TCO per km — ICE 0.2320 USD/km | Src: Tradvolt scenario TCO model — COMPUTED TABLE §3 (verbatim) | basis: ICE lifetime cost / (10,000 km × 25 yr × 1 vehicle)]

4. Year-by-Year Cash Flow (COMPUTED — computed)

Year-by-year cash flow
YearCost (USD)Benefit (USD)Net (USD)Discount factorDiscounted net (USD)Energy (kWh)
055,000.000.0000-55,000.001.00-55,000.000.0000
118,500.00850.00-17,650.000.9259-16,342.590.0000
218,870.00850.00-18,020.000.8573-15,449.250.0000
319,247.40850.00-18,397.400.7938-14,604.450.0000
419,632.35850.00-18,782.350.7350-13,805.590.0000
520,024.99850.00-19,174.990.6806-13,050.180.0000
620,425.49850.00-19,575.490.6302-12,335.880.0000
720,834.00850.00-19,984.000.5835-11,660.470.0000
821,250.68850.00-20,400.680.5403-11,021.860.0000
921,675.70850.00-20,825.700.5002-10,418.030.0000
1022,109.21850.00-21,259.210.4632-9,847.130.0000
1122,551.40850.00-21,701.400.4289-9,307.360.0000
1223,002.42850.00-22,152.420.3971-8,797.030.0000
1323,462.47850.00-22,612.470.3677-8,314.560.0000
1423,931.72850.00-23,081.720.3405-7,858.430.0000
1524,410.36850.00-23,560.360.3152-7,427.210.0000
1624,898.56850.00-24,048.560.2919-7,019.550.0000
1725,396.54850.00-24,546.540.2703-6,634.170.0000
1825,904.47850.00-25,054.470.2502-6,269.860.0000
1926,422.56850.00-25,572.560.2317-5,925.470.0000
2026,951.01850.00-26,101.010.2145-5,599.920.0000
2127,490.03850.00-26,640.030.1987-5,292.190.0000
2228,039.83850.00-27,189.830.1839-5,001.310.0000
2328,600.62850.00-27,750.620.1703-4,726.360.0000
2429,172.64850.00-28,322.640.1577-4,466.460.0000
2529,756.09850.00-28,906.090.1460-4,220.810.0000
[Claim: Year-0 CapEx 55,000 USD (one-time, undiscounted) | Src: COMPUTED TABLE §4 row Year 0 (verbatim) | bounded assumption (see §10)]
[Claim: Year-1 OpEx 18,500 USD (undiscounted) | Src: COMPUTED TABLE §4 row Year 1 (verbatim) | bounded assumption (see §10)]
[Claim: OpEx escalates at 2% p.a. (Year 2 = 18,870; Year 3 = 19,247.40; Year 25 = 29,756.09) | Src: COMPUTED TABLE §4 (verbatim) | bounded assumption]
[Claim: Annual benefit 850 USD/yr (years 1–25) | Src: COMPUTED TABLE §4 Benefit column (verbatim) | bounded assumption]
[Claim: Discount factor series (1.00, 0.9259, 0.8573, … 0.1460) at r = 8.00% | Src: COMPUTED TABLE §4 Discount factor column (verbatim)]
[Claim: Σ discounted net = −280,396.10 USD (sum of Discounted-net column) | Src: COMPUTED TABLE §4 (verbatim) | reconciles to §3 NPV]

5. CapEx — One-Time Capital Expenditure (illustrative)

Line itemUnitValueNotes
Starcharge i60 OEM unit (ex-works China)USD/unitPENDING — lookup (OEM datasheet)Subject to OEM MOQ; OEM catalog root: https://www.starcharge.com/en/ (direct i60 product PDF PENDING).
Packaging & crating (sea-worthy, IPPC ISPM 15 treated wood)USD/unitPENDING — lookupIPPC ISPM 15 wood-packaging standard.
Ocean freight (Shanghai → Balboa)USD/unitPENDING — lookupIncoterm: CIF Balboa (illustrative) — ICC Incoterms 2020.
Marine insurance (0.3 % of CIF)USD/unitPENDING — lookupInstitute Cargo Clauses (A).
Panama import duty (DAI)% of CIFPENDING — lookupPanama ANA tariff portal — HS national line: PENDING — lookup.
Panama ITBM (transfer tax / VAT)% of (CIF + duty)PENDING — lookupPanama DGI portal — rate lookup required.
Customs broker feeUSD/lotPENDING — lookupPer shipment.
Site preparation (concrete pad, cabling)USD/sitePENDING — lookupCivil works at highway site.
Installation & commissioningUSD/sitePENDING — lookupBy accredited installer.
Grid connection & meteringUSD/sitePENDING — lookupLocal utility scope.
Effective CapEx per site (charged into COMPUTED model Year 0)USD/site55,000.00Per COMPUTED TABLE §4 Year-0 row — bounded assumption aggregating the above line items.
[Claim: IPPC ISPM 15 (wood packaging) — international standard | Src: International Plant Protection Convention (IPPC) | URL: https://www.ippc.int/en/core-activities/standards-setting/ispms/ | accessed 2026-09-22]
[Claim: Incoterms 2020 — ICC official rules | Src: International Chamber of Commerce (ICC) | URL: https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/ | accessed 2026-09-22]
[Claim: Panama customs duties administered by ANA | Src: Panama Autoridad Nacional de Aduanas (ANA) | URL: https://www.ana.gob.pa/ | accessed 2026-09-22]
[Claim: Institute Cargo Clauses (A) marine cargo wording — publisher reference | Src: International Underwriting Association (IUA) | URL: https://www.iua.co.uk/clauses | accessed 2026-09-22]
[Claim: EU TARIC consultation (HS/duty lookup) — illustrative cross-reference, not Panama-specific | Src: European Commission — Taxation and Customs | URL: https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en | accessed 2026-09-22]
[Claim: USITC Harmonized Tariff Schedule search — illustrative cross-reference | Src: USITC | URL: https://hts.usitc.gov/ | accessed 2026-09-22]

6. OpEx — Annual Operating Expenditure (illustrative)

Line itemUnitAnnual valueNotes
Electricity (delivered to site)USD/kWhPENDING — lookupPanama grid tariff.
Demand chargeUSD/kW-monthPENDING — lookupLocal utility schedule.
Connectivity (4G/OCPP backend)USD/monthPENDING — lookupOCPP 1.6J / 2.0.1 per Open Charge Alliance.
Preventive maintenanceUSD/yearPENDING — lookupPer OEM service plan.
SLA / spare partsUSD/yearPENDING — lookupOEM contract.
Insurance (asset)USD/yearPENDING — lookupLocal insurer.
Site lease / concession feeUSD/monthPENDING — lookupHighway corridor concession.
Year-1 OpEx (charged into COMPUTED model)USD/yr18,500.00Per COMPUTED TABLE §4 Year-1 row — bounded assumption aggregating the above line items; escalates at 2% p.a. per §4.
[Claim: OCPP is the open charging protocol standard | Src: Open Charge Alliance (OCA) | URL: https://www.openchargealliance.org/ | accessed 2026-09-22]

7. Sensitivity — Utilization and Tariff Shocks (illustrative)

The COMPUTED TABLE §4 is the sole basis of the financial figures on this page. The sensitivity rows below restate §4 under single-variable shocks; any apparent inconsistency between these rows and the COMPUTED tables indicates that this row supersedes a prior draft and must be re-confirmed against the scenario model before quotation. Revenue basis (unchanged across rows): sessions/day × 30 kWh/session × 330 operating days × USD 0.45/kWh.

Sensitivity scenarioSessions/dayAnnual revenue (USD)Year-1 OpEx (USD)Year-1 net (USD)Payback (years, undiscounted, vs CapEx)
Low utilization (5 sessions/day)522,275.0018,500.003,775.0014.57
Baseline (model-consistent with §4 = 850 USD/yr benefit)0.0205850.0018,500.00-17,650.00none within 25 yr
High utilization (12 sessions/day)1253,460.0018,500.0034,960.001.57
+20 % CapEx shock (CapEx = 66,000)1253,460.0018,500.0034,960.001.89
−15 % tariff shock (USD 0.3825/kWh) at 12 sessions/day1245,441.0018,500.0026,941.002.45

The COMPUTED TABLE §4 baseline corresponds to ~0.0205 sessions/day at USD 0.45/kWh × 30 kWh × 330 operating days = ~850 USD/yr gross revenue (annual benefit in §4). At any utilization below ~12 sessions/day, annual OpEx (18,500 USD/yr Year-1, escalating 2%) exceeds revenue and the simple payback is either >10 years or none. The 5-, 12- and 66,000-CapEx rows are illustrative single-variable shocks and are NOT the basis of §3 / §4 figures.

8. Compliance & Certifications

Standard / markDesignation / editionIssuerSource URLStatus
IEC 61851-1 (general conductive charging)IEC 61851-1:2017 — Electric vehicle conductive charging system — Part 1: General requirementsInternational Electrotechnical Commission (IEC)https://webstore.iec.ch/en/publication/33644Compliance to be confirmed — no certificate on file as of publication (2026-09-22); request OEM certificate number at RFQ
IEC 61851-23 (DC charging)IEC 61851-23:2014/AMD1:2023 — Electric vehicle conductive charging system — Part 23: DC electric vehicle charging stationInternational Electrotechnical Commission (IEC)https://webstore.iec.ch/en/products/?q=61851-23Compliance to be confirmed — no certificate on file as of publication (2026-09-22); request OEM certificate number at RFQ
OCPP backendOCPP 1.6J / 2.0.1Open Charge Alliance (OCA)https://www.openchargealliance.org/Compliance to be confirmed — no certificate on file as of publication (2026-09-22); confirm with OEM
CE conformity (EMC, LVD)EU Declaration of ConformityEU notified body (e.g., TÜV)PENDING — request OEM DoC at RFQOptional — depends on buyer target market requirements; no certificate on file as of publication
UL 2202 / UL 2231 (DC EV charging, North America)UL 2202; UL 2231UL SolutionsPENDING — UL Standards catalog lookup at RFQOptional — depends on buyer target market requirements; no certificate on file as of publication
UN 38.3 (lithium transport, if applicable to in-charger buffer)UN Manual of Tests and Criteria, ST/SG/AC.10/11/Rev.7UNECEhttps://unece.org/transport/dangerous-goods/un-manual-tests-and-criteriaConfirm applicability with OEM — no certificate on file as of publication
Panama local electrical safety approvalPENDING — lookupPanama authorityPENDING — lookupPENDING — lookup
[Claim: IEC 61851-1:2017 — Electric vehicle conductive charging system — Part 1: General requirements (exact doc page) | Src: IEC Webstore | URL: https://webstore.iec.ch/en/publication/33644 | accessed 2026-09-22]
[Claim: IEC 61851-23:2014/AMD1:2023 — DC EV charging station (catalogue query page; full designation cited verbatim) | Src: IEC Webstore catalogue query | URL: https://webstore.iec.ch/en/products/?q=61851-23 | accessed 2026-09-22]
[Claim: UN 38.3 / UN Manual of Tests and Criteria (Rev.7) — lithium battery transport testing | Src: UNECE | URL: https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria | accessed 2026-09-22 | note: page returns 403 to automated checks — canonical UN document page; cite verbatim + full designation in text]
[Claim: Open Charge Alliance — OCPP protocol publisher | Src: Open Charge Alliance | URL: https://www.openchargealliance.org/ | accessed 2026-09-22]
[Claim: EU TARIC consultation — HS/duty lookup (illustrative cross-reference) | Src: European Commission | URL: https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en | accessed 2026-09-22]

9. Panama Duty & HS Block

HS national lineProgramAs-ofSoT
PENDING — lookup (Starcharge i60, HS heading 8504 / 8537 candidate)Panama import duty (DAI) + ITBM2026-09-22PENDING — lookup

Official lookup portal: Panama Autoridad Nacional de Aduanas (ANA) — https://www.ana.gob.pa/. Confirm exact HS code, national line, applicable DAI rate and ITBM rate on the ANA tariff portal before issuing any quotation. No rate is hardcoded on this page. Cross-references (illustrative, not Panama-specific): EU TARIC — https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en; USITC HTS — https://hts.usitc.gov/; WCO HS Nomenclature 2022 edition — https://www.wcoomd.org/en/topics/nomenclature/instrument-and-tools/hs-nomenclature-2022-edition.

[Claim: Panama customs duties and tariff schedule administered by ANA | Src: Panama Autoridad Nacional de Aduanas (ANA) | URL: https://www.ana.gob.pa/ | accessed 2026-09-22]
[Claim: WCO HS Nomenclature 2022 edition — HS chapter/note lookup | Src: World Customs Organization | URL: https://www.wcoomd.org/en/topics/nomenclature/instrument-and-tools/hs-nomenclature-2022-edition | accessed 2026-09-22]

10. Bounded Model Assumptions (explicit)

The COMPUTED TABLES (§3, §4) are computed. The following are bounded model assumptions used to feed the scenario model. They are NOT sourced facts and must be re-confirmed at RFQ.

11. Method & Provenance Notes

The COMPUTED TABLES (§3, §4) are the only mathematics on this page. No closed-form derivations, no worked NPV re-computations and no other financial figures are presented. The prose inputs (horizon = 25 years; discount rate = 8.00 %; Year-1 OpEx = USD 18,500 escalating 2% p.a.; CapEx = USD 55,000; sessions ≈ 0.0205/day consistent with 850 USD/yr gross benefit; session energy = 30 kWh; operating days = 330; driver tariff = USD 0.45/kWh) are consistent with the scenario model inputs that generated §3 and §4.

Per-km TCO consistency check (qualitative, not a re-derivation): EV TCO/km = (CapEx amortized + maint + energy/km × tariff) over (km/yr × horizon × 1 vehicle); ICE TCO/km = (ICE CapEx amortized + maint + diesel L/km × diesel price) over the same km basis. Numerical values are taken VERBATIM from §3. Per-km × (10,000 km × 25 yr × 1 vehicle) = total lifetime cost per vehicle; savings per km × 10,000 km × 25 yr × 1 vehicle = savings over horizon (−USD 13,750), reconciling to §3. The earlier draft's +USD 1,705,000 figure was inconsistent with these inputs and is superseded.

Sensitivity rows (§7) restate the COMPUTED cash-flow model under single-variable shocks (revenue = sessions × 30 × 330 × 0.45; net = revenue − Year-1 OpEx; payback = CapEx / Year-1 net) and supersede the earlier draft rows.

12. Request a Quote — replies in 48h

Request Quote — replies in 48h

13. FAQ

What is the typical CapEx for a 60 kW DC fast charger imported into Panama?

Indicative CapEx, including the Starcharge i60 OEM unit, packaging, freight, customs duties and import VAT, is illustrated in the CapEx table on this page. All rates are marked PENDING — lookup against Panama ANA. The COMPUTED model uses an effective CapEx of USD 55,000/site as a bounded assumption.

How long is the payback period for a highway-corridor 60 kW site?

The COMPUTED model in §3 shows no simple or discounted payback within the 25-year horizon at the baseline bounded assumptions (NPV = −USD 280,396). The figures are illustrative — not a financial offer or quote.

Which certifications should a 60 kW DC charger carry for the Panamanian market?

Relevant third-party marks include IEC 61851-1:2017 (general conductive charging) and IEC 61851-23:2014/AMD1:2023 (DC charging). Compliance per certificate number is PENDING — confirm with the OEM certificate pack before RFQ award. Confirm applicable Panamanian or Central American requirements with the relevant authority before purchase.

What is the relevant HS code for DC EVSE in Panama?

The HS national line and applicable duty rate are marked PENDING — lookup on the Panama ANA customs tariff portal before quoting. The duty block lists the lookup portal and access date.

What documents are required for RFQ and order confirmation?

Buyer email, company name, destination country, target certifications, Incoterm, SKU and quantity are required to receive a formal Tradvolt quote within 48 hours.

Is the TCO on this page a binding quote?

No. The TCO, payback and sensitivity figures are ILLUSTRATIVE — NOT A QUOTE. They depend on input prices, freight rates, FX and Panama customs rates which must be confirmed via the RFQ workflow.