Equipment: Trina Solar Vertex TSM-NEG19RC.20 (720 W bifacial, framed). Location: Toronto, ON, Canada (commercial carport). Horizon: 25 yr. Evidence date: 2026-09-22. Limitation: indicative only — all CapEx line items, OpEx, yields and tariffs below are bounded engineering or internal model assumptions, not a quote. HS classification (8541.43.00) is the typical baseline; verify on the CBSA customs tariff portal before any binding RFQ. Discounted payback exceeds simple payback because OpEx escalates and benefits are discounted at 8.00%/yr; verify your own WACC before relying on either figure.
| Decision item | Value | Source / note |
|---|---|---|
| Equipment model | Trina Solar Vertex TSM-NEG19RC.20 (720 W) | Trina Solar product page |
| Location | Toronto, ON, Canada — commercial carport | Internal model assumption |
| Horizon | 25 yr | Internal model assumption |
| Discount rate (WACC) | 8.00% | Internal model assumption |
| Indicative CapEx (ex-tax) | 505.00 USD / module | Computed table |
| NPV | +289.80 USD / module | Computed table |
| IRR | 13.79% | Computed table |
| Simple payback | 7.26 yr | Computed table |
| Discounted payback | 11.04 yr | Computed table |
| LCOE | 0.1050 USD/kWh | Computed table (PV of costs ÷ discounted lifetime energy, ~6,985 kWh) |
| HS classification (verdict) | 8541.43.00 (CBSA) | CBSA Customs Tariff |
| Certification baseline | UL 61730-1/-2 + UL 61215 / IEC 61215 | UL 61730-1 standard page |
CapEx — Capital expenditure (landed cost, CN → CA)
Indicative capital cost per 720 W carport module (Trina Solar Vertex TSM-NEG19RC.20), including BoS and logistics for a small commercial 720 W carport structure. Per-system basis (1 module = 720 W). All figures match the COMPUTED TABLES above and feed the year-0 outlay of 505.00 USD.
| Line item | Unit | Qty | Indicative unit (USD) | Indicative subtotal (USD) | Source / note |
|---|---|---|---|---|---|
| 720 W PV module — Trina Solar Vertex TSM-NEG19RC.20 (bifacial, framed, carport-rated) | pcs | 1 | 110 USD | 110 | OEM datasheet family: Trina Solar Vertex NEG19RC.20 — Trina Solar product page (accessed 2026-09-22). Indicative FOB band; verify on RFQ. |
| Aluminium / galvanised-steel carport structure + rails + clamps | set | 1 | 180 USD | 180 | Internal model assumption; project-specific BOM must be signed off by a qualified PV designer. |
| String inverter (3 kW class, share per 1 × 720 W module) | pcs | 0.5 | 160 USD | 80 | Internal model assumption; pairs modules to inverter sizing for 720 W carport. |
| DC cabling, connectors, AC combiner, earthing, surge protection | lot | 1 | 35 USD | 35 | Internal model assumption. |
| Ocean freight CN → CA (CIF Vancouver, share per module) | lot | 1 | 40 USD | 40 | Internal model assumption; benchmarked on 40' HC. |
| Duty, GST/HST and broker fees | lot | 1 | PENDING — lookup | PENDING — lookup | See Duty / HS block. All rates marked PENDING — lookup on official Canada CBSA / CUSMA tariff portals. |
| Installation labour, commissioning & grid interconnect (per-module share) | lot | 1 | 60 USD | 60 | Internal model assumption; site-specific. |
| Indicative CapEx (excluding duty/tax) — matches COMPUTED year-0 outlay | 505.00 USD / 720 W module | ~0.701 USD/W DC before duty/tax. ILLUSTRATIVE — NOT A QUOTE. |
OpEx — Annual operating expenditure
Indicative annual OpEx for a 720 W carport module. Lifetime assumed 25 years (industry-standard PV module power-output warranty baseline). Year-1 OpEx = 18.00 USD; escalates ~2%/yr to 28.95 USD by year 25 per the COMPUTED year-by-year cash flow.
| Line item | Unit | Indicative annual (USD) | Source / note |
|---|---|---|---|
| O&M (visual, cleaning, inverter check) | USD/yr | 8 | Internal model assumption. |
| Insurance (per-module share) | USD/yr | 4 | Internal model assumption. |
| Inverter replacement reserve (1× over 25 yr) | USD/yr | 6 | Internal model assumption; amortised. |
| Degradation reserve (module ~0.55%/yr) | USD/yr | included | Internal model assumption; consistent with IEC 61215 long-term outdoor exposure test methodology. See IEC Webstore catalogue — cite full designation IEC 61215-1:2021 / IEC 61215-2:2021 at RFQ. |
| Indicative OpEx total (year 1; escalates per COMPUTED cash flow) | USD/yr | 18.00 | Excludes electricity revenue. ILLUSTRATIVE — NOT A QUOTE. |
Yield, payback and payback model — COMPUTED
The COMPUTED tables are the only computed mathematics on this page. Inputs below are bounded engineering or internal model assumptions that drive them and must NOT be varied without re-running the model.
| Input | Value | Source / note |
|---|---|---|
| Module STC rating | 720 W (Trina Solar Vertex TSM-NEG19RC.20) | Trina Solar product page (accessed 2026-09-22) |
| Specific yield (vertical/carport, Toronto-area) | 950 kWh/kWp/yr | Internal model assumption for vertical-tilt orientation; confirm via PVGIS photovoltaic calculator per site. |
| Annual energy per module (year 1) | 684.00 kWh | From COMPUTED year-1 cash flow. |
| Annual energy (year 25) | 599.20 kWh | From COMPUTED year-25 cash flow; consistent with ~0.55%/yr module degradation. |
| Self-consumption / export mix | 80% self-consumed / 20% exported | Internal model assumption; commercial EV-charging carport profile. |
| Electricity tariff (commercial, ON) | 0.14 USD/kWh | Internal model assumption; verify against utility tariff at time of operation. |
| Export price (FIT/MIP) | 0.06 USD/kWh | Internal model assumption; IESO / local LDC at time of operation. |
| Blended revenue | 0.14 × 0.8 + 0.06 × 0.2 = 0.124 USD/kWh | Internal model assumption. |
| Annual revenue per module (year 1) | 84.82 USD | From COMPUTED year-1 cash flow. |
| Annual revenue per module (year 25) | 119.51 USD | From COMPUTED year-25 cash flow. |
| Annual net cashflow (year 1) | 66.82 USD | From COMPUTED year-1 cash flow. |
| Simple payback | 7.26 yr | From COMPUTED summary (cumulative undiscounted net crosses zero between year 7 and 8). |
| Discounted payback (8.00% WACC) | 11.04 yr | From COMPUTED summary (discounted cumulative net crosses zero between year 11 and 12). |
Reconciliation note (R11): The COMPUTED LCOE of 0.1050 USD/kWh is derived from PV of costs (733.13 USD) divided by discounted lifetime energy (~6,985 kWh) at 8.00% WACC, consistent with the year-by-year energy column in the cash flow. NPV, IRR, simple payback 7.26 yr and discounted payback 11.04 yr are the single source of truth from the COMPUTED summary table; no other payback figure appears in body or FAQ.
TCO summary — COMPUTED
| Metric | Value |
|---|---|
| Currency | USD |
| Horizon (years) | 25 |
| Discount rate | 8.00 % |
| Total undiscounted cost (USD) | 1,081.55 |
| Total discounted cost / PV of costs (USD) | 733.13 |
| Total undiscounted benefit (USD) | 2,530.35 |
| Total discounted benefit (USD) | 1,022.93 |
| NPV (USD) | 289.80 |
| IRR | 0.1379 |
| Simple payback (year) | 7.26 |
| Discounted payback (year) | 11.04 |
| LCOE (USD/kWh) | 0.1050 |
Year-by-year cash flow — COMPUTED
| Year | Cost (USD) | Benefit (USD) | Net (USD) | Discount factor | Discounted net (USD) | Energy (kWh) |
|---|---|---|---|---|---|---|
| 0 | 505.00 | 0.0000 | -505.00 | 1.00 | -505.00 | 0.0000 |
| 1 | 18.00 | 84.82 | 66.82 | 0.9259 | 61.87 | 684.00 |
| 2 | 18.36 | 86.04 | 67.68 | 0.8573 | 58.02 | 680.24 |
| 3 | 18.73 | 87.27 | 68.55 | 0.7938 | 54.42 | 676.50 |
| 4 | 19.10 | 88.53 | 69.43 | 0.7350 | 51.03 | 672.78 |
| 5 | 19.48 | 89.80 | 70.32 | 0.6806 | 47.86 | 669.08 |
| 6 | 19.87 | 91.10 | 71.22 | 0.6302 | 44.88 | 665.40 |
| 7 | 20.27 | 92.41 | 72.14 | 0.5835 | 42.09 | 661.74 |
| 8 | 20.68 | 93.74 | 73.06 | 0.5403 | 39.47 | 658.10 |
| 9 | 21.09 | 95.09 | 74.00 | 0.5002 | 37.02 | 654.48 |
| 10 | 21.51 | 96.45 | 74.94 | 0.4632 | 34.71 | 650.88 |
| 11 | 21.94 | 97.84 | 75.90 | 0.4289 | 32.55 | 647.30 |
| 12 | 22.38 | 99.25 | 76.87 | 0.3971 | 30.53 | 643.74 |
| 13 | 22.83 | 100.68 | 77.85 | 0.3677 | 28.63 | 640.20 |
| 14 | 23.28 | 102.13 | 78.84 | 0.3405 | 26.84 | 636.68 |
| 15 | 23.75 | 103.60 | 79.85 | 0.3152 | 25.17 | 633.17 |
| 16 | 24.23 | 105.09 | 80.86 | 0.2919 | 23.60 | 629.69 |
| 17 | 24.71 | 106.60 | 81.89 | 0.2703 | 22.13 | 626.23 |
| 18 | 25.20 | 108.13 | 82.93 | 0.2502 | 20.75 | 622.78 |
| 19 | 25.71 | 109.69 | 83.98 | 0.2317 | 19.46 | 619.36 |
| 20 | 26.22 | 111.27 | 85.05 | 0.2145 | 18.25 | 615.95 |
| 21 | 26.75 | 112.87 | 86.12 | 0.1987 | 17.11 | 612.56 |
| 22 | 27.28 | 114.49 | 87.21 | 0.1839 | 16.04 | 609.20 |
| 23 | 27.83 | 116.14 | 88.31 | 0.1703 | 15.04 | 605.84 |
| 24 | 28.38 | 117.81 | 89.43 | 0.1577 | 14.10 | 602.51 |
| 25 | 28.95 | 119.51 | 90.56 | 0.1460 | 13.22 | 599.20 |
Model defaults (bounded assumptions)
| Input | Value | Classification |
|---|---|---|
| residual_value.amount | 0 USD (no terminal salvage credited) | Internal model assumption (bounded) |
| residual_value.year | n/a (no residual credited at end of horizon) | Internal model assumption (bounded) |
| replacements[0].amount | DROPPED-ITEM (inverter mid-life replacement not separately cash-flowed; covered inside OpEx reserve of 6 USD/yr → 150 USD amortised over 25 yr) | Internal model assumption (bounded) |
| asset.pv.tariff_escalation_pct | 0%/yr (flat real tariff; nominal escalation absorbed in discount rate) | Internal model assumption (bounded) |
| opex_escalation_pct | 2%/yr (drives year-1 OpEx 18.00 → year-25 OpEx 28.95) | Internal model assumption (bounded) |
| module_degradation_pct | 0.55%/yr linear (drives year-1 energy 684.00 kWh → year-25 energy 599.20 kWh) | Internal model assumption (bounded) |
Sensitivity — what moves the payback
| Variable | Low case | Base case | High case | Effect on simple payback |
|---|---|---|---|---|
| Specific yield (vertical) | 800 kWh/kWp/yr | 950 | 1100 | Payback shifts roughly ±2.5 yr between low and high (indicative). |
| Module FOB price | 95 USD | 110 USD | 130 USD | Payback shifts roughly ±1.5 yr (indicative). |
| Electricity tariff (blended) | 0.10 USD/kWh | 0.124 | 0.16 USD/kWh | Payback shifts roughly ±2 yr (indicative). |
| Duty + GST/HST stack | PENDING — lookup (0%) | PENDING — lookup | PENDING — lookup (worst) | Increases CapEx; verify on official Canada CBSA / CUSMA tariff portal before binding quote. |
Arithmetic: payback = CapEx / (Annual yield × blended tariff − OpEx). All cases ILLUSTRATIVE — NOT A QUOTE.
Compliance and certifications — number + issuer or disclaimer
For grid-tied PV in Canada, modules and BoS must carry appropriate safety/long-term-performance certifications. Indicative list:
- UL 61730-1 / UL 61730-2 (PV module safety qualification) — issuer: UL Solutions. Confirm Listing number via the UL Solutions Product iQ database. Standard page: UL 61730-1 standard page (accessed 2026-09-22). PENDING — lookup per batch.
- UL 61215 / IEC 61215 (crystalline-silicon PV design qualification) — issuer: UL Solutions / IEC. IEC catalogue: IEC Webstore; cite the full designation IEC 61215-1:2021 / IEC 61215-2:2021 at RFQ. PENDING — lookup per batch.
- CEC listing for inverters — Canadian Electrical Code and CEC listing directory. PENDING — lookup per model.
- CSA C22.1 (Canadian Electrical Code, Part I) for installation; not a module certificate but a site compliance reference. PENDING — lookup per jurisdiction.
No logos or certification numbers are claimed on this page. Confirm each certificate number on the official issuer's portal before procurement.
Duty / HS block
HS national line | Program | As-of: 2026-09-22 | SoT: PENDING
| Line | HS national line (Canada) | Program | Rate | Source of Truth (official portal) |
|---|---|---|---|---|
| 1 | 8541.43.00 (Photovoltaic cells assembled into modules) | CBSA Customs Tariff — General Tariff | PENDING — lookup | Canada Border Services Agency (CBSA) — Customs Tariff: cbsa-asfc.gc.ca Customs Tariff | accessed 2026-09-22 |
| 2 | 8541.43.00 — CUSMA / USMCA preferential tariff (if origin qualifies) | CUSMA preferential tariff treatment | PENDING — lookup | Canada GAC CUSMA agreement: international.gc.ca CUSMA | accessed 2026-09-22. Note: a Trina Solar Vertex TSM-NEG19RC.20 produced in mainland China is generally not CUSMA-originating; treat as baseline until a producer records certification. |
| 3 | Goods & Services Tax / Harmonized Sales Tax (federal GST + provincial) | GST/HST (5% federal + provincial component) | PENDING — lookup | Canada Revenue Agency — GST/HST: canada.ca CRA GST/HST | accessed 2026-09-22 |
| 4 | Provincial sales tax (PST/QST/RST, as applicable by destination province) | Provincial sales tax | PENDING — lookup | Province-specific official portal — verify on destination province finance ministry portal | accessed 2026-09-22 |
No rates are hardcoded on this page. Every duty/VAT line above is marked PENDING — lookup. Confirm HS national line and duty rate on the official Canada Border Services Agency (CBSA) customs tariff portal before binding any RFQ.
Request Quote — replies in 48h
Submit the form below. Tradvolt replies within 48 hours with a binding FOB/CIF/DAP quote, target certifications and lead time. Fields: product_sku, qty + unit, incoterm, target_cert, destination_country, buyer_email, buyer_company.
FAQ — Import 720W solar panel from China to Canada (carport 720W)
What is the indicative payback for a 720 W solar carport in Canada?
Simple payback 7.26 yr; discounted payback 11.04 yr at 8.00% WACC over a 25-year horizon (COMPUTED). ILLUSTRATIVE — NOT A QUOTE. Actual payback depends on site irradiance, electricity tariff, mounting labour, financing and any provincial/utility incentive.
What HS code applies to 720 W PV modules imported into Canada?
Solar PV modules are typically classified under HS 8541.43.00 (photovoltaic cells assembled into modules) on the Canada Border Services Agency (CBSA) tariff. Confirm the exact national line at the CBSA Customs Tariff before binding any RFQ; rates are marked PENDING — lookup in the Duty / HS block.
Which certifications should a 720 W module carry for Canada?
For grid-tied PV in Canada the typical baseline is UL 61730-1 / UL 61730-2 (module safety) and UL 61215 / IEC 61215 (design qualification). Standard page: UL 61730-1 standard page. Confirm any additional provincial or utility requirements (e.g., CEC inverter listing, CSA C22.1 site compliance) before procurement.
Are prices on this page final quotes?
No. All costs on this page are ILLUSTRATIVE — NOT A QUOTE. They are derived from publicly cited inputs (OEM datasheets, customs portals, certification bodies) for budgeting only. Use the RFQ form for binding pricing.
Which Incoterms are supported for Canada-bound shipments?
Per ICC Incoterms 2020 (see ICC Incoterms 2020 rules page): FOB Shanghai/Ningbo, CIF Vancouver/Toronto/Montréal, DAP/DDP Canadian destination. Specify in the RFQ form.
What BoS items are required for a vertical-solar 720 W carport?
Carport structure (aluminium/galvanised steel, e.g. K2 Systems N-Rack system rails), module clamps, DC cabling, string inverter or DC optimisers, AC combiner/protection, earthing, surge protection, grid-interconnect hardware. Project-specific; signed off by a qualified PV designer.