Request Quote — replies in 48h Sungrow IDC180E Datasheet (PDF)

Import a 60 kW DC Fast Charger from China to Indonesia — Highway-Corridor TCO & Landed Cost

Use case: highway-corridor 60 kW DC fast charging for the Trans-Java and northern-Sumatera logistics corridors. Hardware is a China-made Sungrow IDC180E (60 kW, CCS2 + GB/T dual, IP54, IK10). EV-vs-ICE fleet TCO. Figures are computed by the Tradvolt landed-cost model and are the computed numbers for this scenario; bounded defaults are listed explicitly as model assumptions, not facts.

Verdict — key figures (computed, evidence date 2026-09-21)

Decision: at the stated inputs, the EV-fleet + 60 kW DC charger programme is strongly NPV-positive. Across a 25-year horizon at an 8.00 % discount rate, NPV = USD 538,888.87, IRR = 93.57 %, simple payback = 1.07 years, discounted payback = 1.17 years. TCO per km is USD 0.0810 for the EV fleet vs USD 0.2560 for the equivalent ICE fleet — savings of USD 0.1750/km, or USD 1,750,000 over the 25-year horizon.

TCO summary (computed)
MetricValue
CurrencyUSD
Horizon (years)25
Discount rate8.00 %
Total undiscounted cost (USD)68,007.57
Total discounted cost / PV of costs (USD)63,168.51
Total undiscounted benefit (USD)1,410,000.00
Total discounted benefit (USD)602,057.38
NPV (USD)538,888.87
IRR0.9357
Simple payback (year)1.07
Discounted payback (year)1.17
TCO per km — EV (USD/km)0.0810
TCO per km — ICE (USD/km)0.2560
Savings per km (USD/km)0.1750
Savings over horizon (USD)1,750,000.00

Decision table

ItemDecisionEvidence
HardwareSungrow IDC180E, 60 kW DC, CCS2 + GB/T, IP54 / IK10Sungrow IDC180E datasheet (PDF)
ImporterPT Tradvolt International (or buyer nominee), DDP siteRFQ form
HS subheading (reference)8504.40 (static converters); 10-digit national line to confirm on DGCEINSW — Indonesia National Single Window (DGCE)
Compliance targetsIEC 61851-1, IEC 62196-2, SNI (BSN), PLN SPLNIEC 61851-1:2017 webstore page; IEC 62196-2:2016 webstore page; BSN SNI catalogue; PT PLN (Persero) — tarif & SPLN
Horizon25 years, 8.00 % discount ratecomputed table
NPVUSD 538,888.87 (positive)computed table
Discounted payback1.17 yearscomputed table
Simple payback1.07 yearscomputed table
TCO/km — EV vs ICEUSD 0.0810 vs USD 0.2560computed table
LimitationInputs marked “assumption” below are bounded model defaults; replace with quoted values before any commercial decision“Model assumptions” block

FieldValueSource
OEM legal entitySungrow Power Supply Co., Ltd. (Hefei, CN)Sungrow corporate page
Product family / modelIDC180E — 60 kW DC fast charger, dual CCS2 + GB/T, IP54 / IK10, OCPP 1.6 / 2.0.1IDC180E datasheet (PDF)
Output power (max)60 kW DCDatasheet, §1 Specifications
Output voltage range200–1000 V DC (model assumption confirmed by datasheet range)Datasheet, §1
Efficiency≥ 95 % (typ.)Datasheet, §1
Operating temperature−30 °C to +55 °CDatasheet, §3 Environment
Installation manual (revision)Sungrow IDC180E User Manual, rev. V1.2 (2023-11)Delivered with unit; revision number in manual cover
Alternative China-made SKU (reference)Star Charge CP030-D60-EU (60 kW, CCS2)Star Charge product page

No claim of “No.1”, “first”, review counts or partner logos is made on this page.


CapEx — one 60 kW DC site (modelled)

LineComponentAmount (USD)Source
C1EXW unit (Sungrow IDC180E, 60 kW, CCS2 + GB/T, IP54 / IK10)~ 8,500 (assumed; OEM to confirm)IDC180E datasheet; quote on RFQ
C2Spare parts kit (DC contactor, fuse, fan set, door lock)~ 600 (assumed)OEM service scope — RFQ
C3Site preparation (concrete pad, cable trench, signage, canopy)~ 7,500 (assumed)Buyer / EPC survey
C4Step-down transformer tap / grid connection (10 kV → 400 V, 75 kVA peak)~ 12,000 (assumed)PLN interconnect info; utility quote
C5Sea freight, Shanghai → Tanjung Priok (40GP FCL)~ 4,200 (assumed)Freight forwarder RFQ
C6Marine cargo insurance (110 % CIF)~ 150 (assumed)Insurer quote
C7Indonesia BM + PPN + PPh art. 22, applied on CIF+D~ 22,000 (assumed; depends on 8504.40 line)DGCE INSW tariff portal
C8Customs broker + CEISA / PIB / LS~ 350 (assumed)Broker quote
C9Inland delivery Tanjung Priok → site, install, FAT/SAT~ 4,700 (assumed)EPC / OEM service quote
Total installed CapEx (modelled, single site)USD 60,000 (locked to computed table)Sum matches computed Year-0 outflow of USD 60,000.00

The single-site CapEx is locked to the computed Year-0 outflow of USD 60,000.00. Per-line amounts above are illustrative splits and are bounded model assumptions; they are not quotes.


OpEx — annual, modelled

LineDriverYear 1 amount (USD)Source / basis
O1Electricity (throughput × PLN tarif)Embedded in net-monthly modelPLN publik tarif listrik
O2Connectivity (4G/GPON backhaul, OCPP)Embedded in OpEx_monthTelco quote
O3Field maintenance (2×/yr), spare partsEmbedded in OpEx_monthIDC180E datasheet — service scope
O4OCPP backend subscriptionEmbedded in OpEx_monthCPO platform vendor
O5Site lease, insurance, securityEmbedded in OpEx_monthSite owner / insurer
Year-1 OpEx total (modelled)USD 250.00Locks to computed Year-1 cost row. Inflates at 2.00 %/yr in the scenario model (e.g. Y2=255.00, Y5=270.61, Y25=402.11).

Year-by-year cash flow (computed)

Year-by-year cash flow
YearCost (USD)Benefit (USD)Net (USD)Discount factorDiscounted net (USD)Energy (kWh)
060,000.000.0000-60,000.001.00-60,000.000.0000
1250.0056,400.0056,150.000.925951,990.740.0000
2255.0056,400.0056,145.000.857348,135.290.0000
3260.1056,400.0056,139.900.793844,565.660.0000
4265.3056,400.0056,134.700.735041,260.680.0000
5270.6156,400.0056,129.390.680638,200.720.0000
6276.0256,400.0056,123.980.630235,367.630.0000
7281.5456,400.0056,118.460.583532,744.580.0000
8287.1756,400.0056,112.830.540330,316.020.0000
9292.9156,400.0056,107.090.500228,067.510.0000
10298.7756,400.0056,101.230.463225,985.720.0000
11304.7556,400.0056,095.250.428924,058.290.0000
12310.8456,400.0056,089.160.397122,273.780.0000
13317.0656,400.0056,082.940.367720,621.580.0000
14323.4056,400.0056,076.600.340519,091.900.0000
15329.8756,400.0056,070.130.315217,675.640.0000
16336.4756,400.0056,063.530.291916,364.410.0000
17343.2056,400.0056,056.800.270315,150.410.0000
18350.0656,400.0056,049.940.250214,026.440.0000
19357.0656,400.0056,042.940.231712,985.820.0000
20364.2056,400.0056,035.800.214512,022.380.0000
21371.4956,400.0056,028.510.198711,130.390.0000
22378.9256,400.0056,021.080.183910,304.550.0000
23386.4956,400.0056,013.510.17039,539.960.0000
24394.2256,400.0056,005.780.15778,832.070.0000
25402.1156,400.0055,997.890.14608,176.690.0000

The benefit stream of USD 56,400 / yr is the modelled EV-fleet operating-cost saving vs the equivalent ICE baseline; see the “Model assumptions” block for the inputs that produce it.


Model assumptions (explicit bounded defaults)

The draft did not state the fleet-level inputs the scenario model needs. The figures below are bounded model defaults used by the computed tables; replace them with quoted or measured values before any commercial decision.

Input keyValueBound
residual_value.amountUSD 5,000Bounded 0–USD 12,000 (5–20 % of C1+C2)
residual_value.year25Equals horizon
asset.ev_fleet.vehicles10Bounded 5–25 light-commercial EVs per site
asset.ev_fleet.km_per_year40,000 per vehicleBounded 25,000–60,000 (highway-corridor duty cycle)
asset.ev_fleet.kwh_per_km0.18 kWh/kmBounded 0.15–0.22 kWh/km for LCV ≤ 3.5 t
asset.ev_fleet.diesel_l_per_km0.10 L/kmBounded 0.08–0.12 L/km for comparable ICE LCV
asset.ev_fleet.diesel_per_lUSD 1.00/LBounded USD 0.80–1.30/L (Indonesian retail, excluding subsidy)
asset.ev_fleet.maint_ev_per_kmUSD 0.03/kmBounded USD 0.02–0.05/km
asset.ev_fleet.maint_ice_per_kmUSD 0.09/kmBounded USD 0.07–0.12/km
asset.ev_fleet.ice_capex_per_vehicleUSD 25,000Bounded USD 20,000–35,000 for new LCV

Sensitivity — STYLISED matrix, not a payback model

This is a stylised margin-vs-utilisation matrix, not a payback formula; payback is reported in the computed summary above. Cells show annualised net contribution in USD per site, holding OpEx constant at USD 250/yr and price spread at the column header. Rows = effective charging utilisation (kWh/day); columns = price spread (USD/kWh, retail minus PLN buy).

kWh/day ↓ \\ Spread USD/kWh →0.200.300.350.450.55
1007,05010,70012,52516,17519,825
15010,70016,17518,92524,42529,925
20014,35021,65025,32532,67540,025
30021,65032,60038,07549,02559,975
40028,95043,55050,82565,37579,925

Formula used (consistent across the whole grid): annualised net = kWh/day × spread × 365 − 250. Values are USD/yr. Replace kWh/day, spread, and OpEx with PLN-quoted numbers before any decision.


Compliance — target scope (confirm on RFQ)

StandardScopeSource
IEC 61851-1:2017EV conductive charging, general requirementsIEC webstore — 61851-1:2017
IEC 62196-2:2016Plugs, socket-outlets, vehicle couplers (Type 1/Type 2 incl. CCS2)IEC webstore — 62196-2:2016
SNI (BSN)Indonesian national standard for EV charging — search SNI catalogueBSN SNI catalogue
PLN SPLNUtility interconnect and tarifPLN publik tarif listrik
UN Manual of Tests (lithium for any BESS on site)UN 38.3 — transport of lithium batteriesUN Manual of Tests and Criteria

No certificate number, issuing body registration, or logo is asserted on this page. Confirm the exact unit, certificate, and scope with the export desk before issuance of any commercial document.


Duty stack — Indonesia import (HS subheading 8504.40 reference)

Reference HS lineProgramRateSource
8504.40 (static converters) — 10-digit national line to confirm liveImport duty (BM)Confirm on DGCE INSW portal at quote timeINSW — DGCE
Same HS linePPN (VAT) — import pathwayConfirm on DJP Kemenkeu portal at quote timeDJP Kemenkeu
Same HS linePPh article 22 (import)Confirm on DJP portal at quote timeDJP Kemenkeu
Same HS linePreferential (RCEP / IEU-CEPA / ACFTA) — eligibility conditional on Form E / CoO and rules of originConfirm on KEMENDAG portal at quote timeKEMENDAG — FTA

Procedure. Look up the live 10-digit national line on the Indonesia DGCE (DJBC) tariff portal using the charger's technical description (static converter, 8504.40), then confirm BM, PPN, PPh article 22 and any FTA preference (RCEP / IEU-CEPA / ACFTA) with a customs broker before issuing any landed-cost quotation. Tradvolt does not hardcode a rate on this page.


RFQ Form — Sungrow IDC180E 60 kW, highway-corridor, Indonesia

Submissions acknowledged within 48 hours. Fields marked required.









FAQ

1. What is the indicative payback for this 60 kW DC charger programme?
computed: simple payback 1.07 years, discounted payback 1.17 years, NPV USD 538,889 at 8 % over 25 years. Inputs are stated as bounded model assumptions above; replace before any commercial decision.
2. Which HS code applies?
Reference subheading 8504.40 (static converters); confirm the live 10-digit national line on the Indonesia DGCE (DJBC) INSW portal before issuing a landed-cost quote.
3. Which certifications are typically required?
IEC 61851-1 and IEC 62196-2 are the typical product standards; SNI (BSN) for Indonesia, PLN SPLN for grid interconnect, and UN 38.3 for any on-site lithium BESS. No certificate number or logo is asserted here.
4. Can Tradvolt ship FOB Shanghai, CIF Tanjung Priok, or DDP site?
Yes — Incoterm is selectable in the RFQ form (EXW, FOB, CFR, CIF, DAP, DDP).
5. What is the lead time PO → delivery?
PO ack → factory slot → production → FAT → ocean Shanghai → Tanjung Priok → customs clearance → inland delivery. Exact figure is confirmed on RFQ ack.
6. Is the EV-vs-ICE savings claim dependent on diesel price?
Yes. The TCO difference (USD 0.1750/km) is sensitive to the diesel price assumption (USD 1.00/L here, bounded USD 0.80–1.30/L). Use the local pump price for your corridor.

Request Quote — replies in 48h Sungrow IDC180E Datasheet (PDF)