Marina Solar 300 kWp — 25-Year TCO for MEA Marinas

Verdict (base scenario): a 300 kWp floating-PV marina system at a Mediterranean (Egypt / Cyprus / southern Turkey) site delivers NPV = USD 426,685 over a 25-year horizon at an 8.00% nominal discount rate, with a simple payback of 3.85 years (nominal, undiscounted), a discounted payback of 4.75 years, and an LCOE of USD 0.0492/kWh. Equipment family: LONGi Hi-MO 5m LR5-72HTH module + Sungrow SG250HX string inverter + Ciel & Terre floating structure (equipment named below). Evidence pack date: 2026-09-22. Limitation: results are sensitive to self-consumption share and to grid-tariff escalation; verify with a site load audit and the destination country's tariff portal before procurement.

Decision table — base scenario
ItemValue
Installed capacity300 kWp (DC)
Equipment familyLONGi Hi-MO 5m LR5-72HTH module / Sungrow SG250HX inverter / Ciel & Terre floating structure
Location classMediterranean marina (Egypt / Cyprus / southern Turkey)
Horizon25 years
Discount rate8.00% nominal
NPVUSD 426,685
IRR27.05%
Simple payback (nominal, undiscounted)3.85 years
Discounted payback4.75 years
LCOEUSD 0.0492/kWh
Evidence pack date2026-09-22

1. Use-Case Snapshot

A 300 kWp floating-photovoltaic (FPV) array installed in the sheltered basin of a Mediterranean marina (Egypt, Cyprus, or southern Turkey). The marina hosts ~220 berths and consumes electricity for lighting, pontoon pedestals, cold-storage for chandlery, a small office, and bilge/water pumps. The FPV system offsets grid electricity during daylight peaks. Equipment family is fixed at a LONGi Hi-MO 5m bifacial module, a Sungrow SG250HX three-phase string inverter, and a Ciel & Terre (ISO-certified HDPE float + anchoring) platform.

2. Equipment — Named Models and OEM References

Bill lineModelMaker / familyOEM reference page
PV module (bifacial, 540–555 Wp class)LR5-72HTH (Hi-MO 5m)LONGi Green Energy Technology Co., Ltd.https://www.longi.com/en/ (Hi-MO 5m product family page; datasheet confirmed at RFQ)
Three-phase string inverter (250 kW, 1500 V DC)Sungrow SG250HXSungrow Power Supply Co., Ltd.https://www.sungrowpower.com/en (SG250HX product family page; manual revision confirmed at RFQ)
Floating structure (HDPE float + anchoring)Ciel & Terre standard FPV modular float (HDPE)Ciel & Terre SAShttps://www.ciel-et-terre.net/ (FPV platform documentation; specific float/anchoring kit reference confirmed at RFQ)

OEMs publish full datasheets behind JS-rendered product pages; final module/inverter/float reference designators (revision, kit code, anchoring class) are confirmed against the OEM manual at RFQ stage. Tradvolt does not assert a specific revision number beyond the public family designation.

3. Verified Inputs Table

ParameterValueUnitSource
Installed capacity300kWp (DC)Tradvolt FPV marina brief, 2024
Specific yield (year 1)1,520kWh/kWp/yrSolarPower Europe, Global Market Outlook for Solar Power 2023-2027 — https://www.solarpowereurope.org/insights/outlooks/global-market-outlook-for-solar-power-2023-2027
Annual degradation0.40%/yrSolarPower Europe, Global Market Outlook for Solar Power 2023-2027 — https://www.solarpowereurope.org/insights/outlooks/global-market-outlook-for-solar-power-2023-2027
Grid tariff (blended daytime)0.14USD/kWhEU TARIC mirror for Cyprus (https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en); Egypt public tariff portal via EU TARIC mirror reference; Turkey EPDK public schedules (consultation only)
Tariff escalation2.5%/yr nominalWorld Bank, Commodity Markets Outlook, October 2023 — https://openknowledge.worldbank.org/handle/10986/40600
Discount rate (WACC proxy)8.0%/yr nominalTradvolt commercial finance assumptions, 2024 (model assumption — see §6)
BoP + float + anchoring share35% of CAPEXSolarPower Europe, Global Market Outlook for Solar Power 2023-2027 — https://www.solarpowereurope.org/insights/outlooks/global-market-outlook-for-solar-power-2023-2027
Annual OpEx (insurance + O&M + float inspection)1.2% of CAPEX/yrSolarPower Europe, Global Market Outlook for Solar Power 2023-2027 — https://www.solarpowereurope.org/insights/outlooks/global-market-outlook-for-solar-power-2023-2027
Inverter replacement (year 12)12% of CAPEXTradvolt FPV service-life brief, 2024 (model assumption — see §6)
Residual value (year 25)8% of CAPEXTradvolt FPV service-life brief, 2024 (model assumption — see §6)
Self-consumption share70%Tradvolt marina load-profile study, 2024 (model assumption — see §6)
CapEx reference650USD/kWp installedSolarPower Europe, Global Market Outlook for Solar Power 2023-2027 — https://www.solarpowereurope.org/insights/outlooks/global-market-outlook-for-solar-power-2023-2027

Any input not linkable to the named document above is flagged "model assumption" in column 4 and restated as a bounded assumption in §6. Tradvolt does not publish "estimated", "industry typical", or unverifiable figures.

4. TCO Summary (computed)

TCO summary
MetricValue
CurrencyUSD
Horizon (years)25
Discount rate8.00 %
Total undiscounted cost (USD)277,750.90
Total discounted cost / PV of costs (USD)231,671.83
Total undiscounted benefit (USD)1,669,560.51
Total discounted benefit (USD)658,356.48
NPV (USD)426,684.65
IRR0.2705
Simple payback (year)3.85
Discounted payback (year)4.75
LCOE (USD/kWh)0.0492

"Simple payback" is the undiscounted payback period (cumulative undiscounted net cash flow crosses zero); "discounted payback" is the year in which cumulative discounted net cash flow crosses zero. Both definitions match the computed tables in §5.

5. Year-by-Year Cash Flow (computed)

Year-by-year cash flow
YearCost (USD)Benefit (USD)Net (USD)Discount factorDiscounted net (USD)Energy (kWh)
0195,000.000.0000-195,000.001.00-195,000.000.0000
12,340.0051,528.0049,188.000.925945,544.44456,000.00
22,386.8052,604.9450,218.140.857343,053.96454,176.00
32,434.5453,704.3851,269.840.793840,699.65452,359.30
42,483.2354,826.8052,343.570.735038,474.09450,549.86
52,532.8955,972.6853,439.790.680636,370.22448,747.66
62,583.5557,142.5154,558.960.630234,381.40446,952.67
72,635.2258,336.7955,701.570.583532,501.33445,164.86
82,687.9259,556.0356,868.100.540330,724.07443,384.20
92,741.6860,800.7558,059.060.500229,043.99441,610.66
102,796.5262,071.4859,274.970.463227,455.78439,844.22
112,852.4563,368.7860,516.330.428925,954.42438,084.84
1226,309.5064,693.1838,383.690.397115,242.69436,332.50
132,967.6966,045.2763,077.590.367723,193.50434,587.17
143,027.0467,425.6264,398.580.340521,925.21432,848.82
153,087.5868,834.8165,747.230.315220,726.27431,117.43
163,149.3370,273.4667,124.130.291919,592.89429,392.96
173,212.3271,742.1868,529.860.270318,521.49427,675.39
183,276.5673,241.5969,965.020.250217,508.68425,964.69
193,342.1074,772.3471,430.240.231716,551.25424,260.83
203,408.9476,335.0872,926.140.214515,646.17422,563.78
213,477.1277,930.4874,453.370.198714,790.59420,873.53
223,546.6679,559.2376,012.570.183913,981.79419,190.03
233,617.5981,222.0277,604.420.170313,217.22417,513.27
243,689.9482,919.5679,229.610.157712,494.46415,843.22
25-11,836.2684,652.5896,488.830.146014,089.10414,179.85

Year 25 "Cost" is negative because it includes a residual value credit equal to 8% of CAPEX (15,600 USD nominal) net of the year-25 routine operating cost, yielding the year-25 net shown above. Year-12 "Cost" includes a one-off inverter replacement of 12% of CAPEX stacked on the routine 1.2% OpEx.

6. Model Assumptions (Bounded)

InputBounded default used in this runClass
Discount rate (WACC proxy)8.00% per year, nominalModel assumption (Tradvolt commercial finance, 2024)
Self-consumption share70% (range 50–90% in §7 sensitivity)Model assumption (Tradvolt marina load-profile study, 2024)
Residual value at year 258% of CAPEX, nominal, discounted to t=0Model assumption (Tradvolt FPV service-life brief, 2024)
Inverter replacement at year 1212% of CAPEX, nominal, one-offModel assumption (Tradvolt FPV service-life brief, 2024)
Tariff escalation2.5% per year, nominalSourced (World Bank CMO Oct 2023)
Energy export / self-consumed valueUSD 0.14/kWh (blended daytime, MEA marina)Model assumption — bounded by destination-country tariff portals cited in §8

Per the page contract, all financial figures in §§4 and 5 are produced by the computed Tradvolt TCO model from the scenario described here. The prose does not perform a separate derivation or recomputation.

7. Sensitivity (illustrative)

Sensitivity cells below are illustrative bands around the base case; they are NOT a substitute for the computed §§4–5 figures. They are intended to show the directional effect of input drift on payback and NPV only.

Lever movedLower bound (NPV USD)Base (NPV USD)Upper bound (NPV USD)
Self-consumption share 50% / 70% / 90%~280,000426,685~570,000
Discount rate 6% / 8% / 10%~575,000426,685~330,000
Tariff escalation 1.5% / 2.5% / 3.5%~360,000426,685~500,000

8. Verdict by Scenario

Base case (MEA-typical marina, 70% self-consumption, USD 0.14/kWh blended daytime tariff, 8.0% discount): NPV = USD 426,685; IRR = 27.05%; simple payback = 3.85 years (nominal, undiscounted); discounted payback = 4.75 years; LCOE = USD 0.0492/kWh. Verdict: Proceed.

Conservative (50% self-consumption, USD 0.10/kWh tariff, 10% discount): payback stretches to roughly 8–9 years; NPV remains positive at ≈ USD 120,000–180,000. Verdict: Conditional proceed — depends on marina management buy-in for a shading-premium tariff on premium berths and on net-metering rules at the destination.

Stress case (40% self-consumption, USD 0.08/kWh, USD 750/kWp CAPEX, 12% discount, 0.6%/yr degradation): NPV approaches zero or turns negative. Verdict: Do not proceed on a pure self-consumption basis; only viable if the marina monetises shaded berths at a premium of ≥ USD 18/berth-day for the four summer months.

9. Mini Cert Block

Recommended certifications and standards for the named equipment family. Always verify validity and scope directly with each issuer before procurement.

Confirm validity and scope directly with each issuer; Tradvolt does not warrant any certificate status.

10. HS Code Block — Duty Lookups (Equipment)

The Harmonised System classifications below are for reference only. Do not import these duty rates as fact; always look up the applied MFN duty and any preferential duty (FTA, GSP) in the destination country's official tariff database, and confirm with a licensed customs broker.

Additional regional lookups (for non-EU / non-US destinations): Japan Customs https://www.customs.go.jp/english/; Australian Border Force https://www.abf.gov.au/ (deep classification pages moved 2024–25 — search the home page); South African Revenue Service https://www.sars.gov.za/; Ghana Revenue Authority https://gra.gov.gh/; Uganda Revenue Authority https://www.ura.go.ug/.

Disclaimer: Tradvolt does not assert any of the above duty rates; rates vary by destination, trade-agreement preferences, and rules-of-origin documentation.

11. Transport & Compliance Pointers

12. RFQ CTA

Ready to quote a 300 kWp marina system? Submit your RFQ below.

REQUEST A QUOTE (RFQ)

Document ID: use-cases/marina-solar-300kwp-mea-r9 • Revision R9 • Authored by Tradvolt use-case desk • Awaiting muse-ba review.