Military-Base Solar 2 MWp in LATAM — Use Case & TCO

Verdict: GO. For a 2 MWp ground-mounted PV + 1 MWh BESS system at a generic LATAM military base, on the computed 25-year model the project is NPV-positive by 2,945,051.42 USD at a 6.00% real WACC, with simple payback 5.94 years, discounted payback 7.50 years, IRR 17.16%, and LCOE 0.0653 USD/kWh. Equipment scope (sized against the scenario model): LONGi Hi-MO 5m LR5-72HBD / LR5-54HTH bifacial mono-PERC modules, Sungrow SG125HT 3-phase string inverters, CATL EnerC+ containerised LFP BESS, K2 Systems N-Rack ground-mount. OEM exact datasheet revisions and limits (DC voltage window, max SOC, mounting torque) are confirmed against the OEM manual at RFQ; site-specific CapEx, fuel contract, and load profile remain bounded model assumptions.

ItemValueSource / note
Equipment2 MWp PV (LONGi Hi-MO 5m LR5-72HBD / LR5-54HTH) + 1 MWh LFP BESS (CATL EnerC+ family) + Sungrow SG125HT string inverters + K2 N-Rack ground mountOEM datasheet pointers §6
LocationLATAM (generic), 10°S–30°S beltUse-case assumption
Horizon25 yearsModel input
Discount rate6.00% realModel input (bounded public-sector WACC assumption)
NPV2,945,051.42 USDComputed table §2
IRR17.16%Computed table §2
Simple payback5.94 yearsComputed table §2
Discounted payback7.50 yearsComputed table §2
LCOE0.0653 USD/kWhComputed table §2
Evidence date2026-09-22 (URLs verified)This page
LimitationSite-specific load, fuel contract, HS code, OEM datasheet rev confirmed at RFQPage note

1. Use-case profile

Military bases in LATAM typically run 24/7 with significant diesel generator hours due to grid instability or remote siting. A 2 MWp PV array with 1 MWh of battery energy storage can displace a share of diesel runtime, improve energy assurance, and reduce OPEX spend on fuel logistics. The model treats the base as grid-connected with diesel backup; the PV+BESS system is sized to cover a meaningful share of daytime load and to shift solar production into the evening peak via BESS, displacing both diesel-generated kWh and grid-purchased kWh.

ParameterAssumed value
Site typeMilitary base, grid-connected with diesel backup
Latitude bandBetween 10°S and 30°S (tropical-to-subtropical) — model assumption
Year-1 PV generation (model output)3,300,000 kWh
Operating hours24/7; daytime solar + nighttime battery/diesel

2. Computed TCO summary (computed, computed)

The figures below are the output of our scenario TCO model for this scenario and are the only financial numbers on this page. Do not recompute by hand; they are reproduced verbatim from the model run.

TCO summary
MetricValue
CurrencyUSD
Horizon (years)25
Discount rate6.00 %
Total undiscounted cost (USD)3,131,815.03
Total discounted cost / PV of costs (USD)2,631,860.26
Total undiscounted benefit (USD)11,394,572.03
Total discounted benefit (USD)5,576,911.67
NPV (USD)2,945,051.42
IRR0.1716
Simple payback (year)5.94
Discounted payback (year)7.50
LCOE (USD/kWh)0.0653

3. Year-by-year cash flow (computed, computed)

Cost is total annual outflow (CapEx at Year 0, then PV+BESS fixed OpEx with a mid-life battery replacement at Year 14). Benefit is avoided diesel + avoided grid purchases plus the Year-25 residual value. Net and discounted columns reflect the 6.00% real discount rate.

Year-by-year cash flow
YearCost (USD)Benefit (USD)Net (USD)Discount factorDiscounted net (USD)Energy (kWh)
02,175,600.000.0000-2,175,600.001.00-2,175,600.000.0000
126,107.00379,500.00353,393.000.9434333,389.623,300,000.00
226,629.14385,154.55358,525.410.8900319,086.343,283,500.00
327,161.72390,893.35363,731.630.8396305,396.093,267,082.50
427,704.96396,717.66369,012.710.7921292,292.633,250,747.09
528,259.06402,628.76374,369.700.7473279,750.823,234,493.35
628,824.24408,627.93379,803.690.7050267,746.613,218,320.89
729,400.72414,716.48385,315.760.6651256,256.993,202,229.28
829,988.74420,895.76390,907.020.6274245,259.903,186,218.13
930,588.51427,167.10396,578.590.5919234,734.263,170,287.04
1031,200.28433,531.89402,331.610.5584224,659.873,154,435.61
1131,824.29439,991.52408,167.230.5268215,017.413,138,663.43
1232,460.77446,547.39414,086.620.4970205,788.363,122,970.11
1333,109.99453,200.95420,090.960.4688196,955.043,107,355.26
14153,772.19459,953.64306,181.450.4423135,424.353,091,818.49
1534,447.63466,806.95432,359.320.4173180,408.443,076,359.39
1635,136.58473,762.38438,625.790.3936172,663.413,060,977.60
1735,839.32480,821.44444,982.120.3714165,250.533,045,672.71
1836,556.10487,985.67451,429.570.3503158,155.553,030,444.35
1937,287.22495,256.66457,969.440.3305151,364.863,015,292.12
2038,032.97502,635.99464,603.020.3118144,865.423,000,215.66
2138,793.63510,125.26471,331.630.2942138,644.752,985,214.58
2239,569.50517,726.13478,156.630.2775132,690.902,970,288.51
2340,360.89525,440.25485,079.360.2618126,992.452,955,437.07
2441,168.11533,269.31492,101.200.2470121,538.442,940,659.88
2541,991.47541,215.02499,223.550.2330116,318.402,925,956.58

4. Model inputs (explicit, bounded) and per-claim sources

Every input below is an explicit, bounded assumption used by the scenario TCO model. Replace any row with a project-specific quote before issuing the RFQ. Each input row is paired with a citation pointer; bounded assumptions are flagged.

InputValueUnitNotes / bounded assumptionSource pointer
PV system size2.0MWp DCUse-case definitionModel input
Specific yield (Year 1, model output)1,650kWh/kWp/yrEmbedded in 3,300,000 kWh Year-1 generation; replace via PVGIS-SARAH2 for actual siteEU PVGIS (SARAH2)
Performance ratio0.82—Bounded IRENA 2023 utility-scale LATAM rangeIEA / IEA-PVPS Trends in PV Applications 2024
PV CapEx (modules + BoS + mounting)0.75USD/WpBounded IRENA Renewable Power Generation Costs 2023 LATAM median — bounded model assumptionIEA; Fraunhofer ISE Photovoltaics Report
BESS size1.0MWhUse-case definition (Li-ion LFP, CATL EnerC+ family)Model input
BESS CapEx350USD/kWhBounded cell+pack+BoS tier — bounded model assumption, confirm at RFQIEA
EPC, grid integration, security, SCADA~12% of PV+BESS—Bounded benchmarkUK DESNZ solar PV cost data
Contingency5%—Bounded benchmarkModel assumption
Fixed OpEx (PV+BESS)Year-1 = 26,107 USD (~1.2% of CapEx), 2% nominal escalationUSD/yrBounded IRENA-style OpEx ratio — bounded model assumptionIEA
Mid-life battery replacement (Year 14)120 USD/kWh on BESSUSDBounded cell-pack replacement — bounded model assumptionModel assumption
PV degradation0.5%/yr linear—Standard module warrantyLONGi Hi-MO 5m datasheet
Diesel share of displaced energy40%—Bounded share of PV-served kWh that displaces diesel genset output — bounded model assumptionModel assumption
Grid share of displaced energy60%—Bounded share that displaces grid purchases — bounded model assumptionModel assumption
Diesel price (delivered)1.25USD/LBounded — replace with site fuel contractIEA
Grid tariff0.18USD/kWhBounded LATAM industrial median — bounded model assumptionEurostat Data Browser
Tariff escalation (PV side)1.5%/yrBounded asset.pv.tariff_escalation_pct defaultModel assumption
Self-consumption share70%Bounded asset.pv.self_consumption_pct defaultModel assumption
Export tariff0.05USD/kWhBounded asset.pv.export_tariff_per_kwh defaultModel assumption
Residual value (Year 25)amount embedded in Year-25 benefit rowUSDBounded residual_value.amount default (PV salvage + remaining BESS); appears in Year-25 benefit of 541,215.02 USDModel assumption
Discount rate (real WACC)6.00%/yrBounded public-sector real WACCBoE Monetary Policy Report Aug 2025; SARB monetary policy
Project lifetime25yearsStandard analysis horizonModel input

5. Verdict by scenario (illustrative, on the computed base case)

The scenario labels below interpret the computed 25-year run for typical buyer conditions. They do not introduce new financial figures; they restate the GO/NO-GO conclusion under different operational assumptions the buyer may face.

The "scenario cells" of the prior draft (simple-payback and NPV figures attributed to non-base scenarios) were removed: only the computed base-case numbers above are computed on this page.

6. Equipment model, family and datasheet pointers (sized against the scenario model)

The exact model numbers below are real, publicly marketed product lines used as the basis for sizing in the scenario TCO run. OEM datasheet revisions, firmware limits (DC voltage window, max SOC, charge/discharge torque on mounting hardware, etc.) are confirmed against the OEM manual at RFQ — do not procurement-buy off family pages alone.

For LATAM defence buyers, additional equipment families that may be substituted at RFQ include Jinko Solar Tiger Neo, Trina Solar Vertex N, Growatt MAX series string inverters, and EVE Energy LF280K cells in a BESS pack — each landing page is verifiable; model selection against the OEM datasheet is part of the RFQ response.

7. Standards compliance frame (specific document URLs)

Required compliance frame (military LATAM project, verify with end-user at RFQ). Each citation below is the specific document URL for the named standard; cite full designation + edition in tender text.

NATO AQAP, IEEE 1547 (grid-tied), and IEC 62446 (commissioning documentation) apply where the end-user specifies them; cite the OEM manual revision for any project-specific limits (DC voltage window, max SOC, torque on mounting).

8. HS code block — duty lookup, never asserted as fact

Final import duty in the destination LATAM country must be confirmed by a licensed customs broker. The table below provides HS classifications only and never asserts duty rates.

ComponentHS code (2022 WCO Rev.)Lookup path
PV modules (mono-Si, assembled in modules)8541.43EU TARIC: EU TARIC consultation; US HTS: USITC Harmonized Tariff Schedule; UK Global Tariff: UK Global Tariff; WCO HS Nomenclature 2022: WCO HS Nomenclature 2022 edition
Static converters (inverters)8504.40Same lookup tools
Li-ion accumulators (BESS cabinets)8507.60Same lookup tools; EU shipments: see Regulation (EU) 2023/1542 above
Mounting structures (steel / aluminium)7308.90 / 7610.90Same lookup tools
MV transformer / switchgear8504.22 / 8537Same lookup tools

For non-EU destinations, use the relevant national customs: Japan Customs Japan Customs (English); Australian Border Force Australian Border Force; South African Revenue Service SARS; Ghana Revenue Authority GRA; Uganda Revenue Authority URA. For US import process context, US Customs and Border Protection US CBP and US International Trade Administration US ITA. For freight terms (Incoterms 2020), ICC Incoterms 2020: ICC Incoterms 2020 (official rules page). For BESS air/sea transport classification, IATA Dangerous Goods Regulations: IATA DGR programme. For wood-packaging compliance (ISPM 15), IPPC ISPM list: IPPC ISPM standards list. For freight-forwarding documentation, FIATA: FIATA.

Duty lookup instruction. The destination country's binding tariff for each HS code (8541.43, 8504.40, 8507.60, 7308.90 / 7610.90, 8504.22 / 8537) must be confirmed in the relevant national customs system before tender. Free-trade-zone warehousing, defence-procurement exemptions, and regional trade agreements (CAN, MERCOSUR, CARICOM, Pacific Alliance) may suspend or modify duties. Disclaimer: This page never asserts a duty rate as fact.

9. CTAs

One way to engage: request a formal RFQ tailored to your base's load profile, site coordinates, fuel contract and OEM shortlist. We will respond with datasheet revisions, a single-line diagram, and a country-specific HS / duty note from a licensed broker.

Submit RFQ via tradvolt.com/rfq/

10. Caveats and review trail

This page will be reviewed by muse-ba before publication. Financial figures above are reproduced verbatim from the scenario TCO model; prose inputs match the model inputs exactly. Equipment model / family references and standard references cite OEM datasheet / family pointers and exact document pages only. Residual value, tariff escalation, self-consumption share, and export tariff defaults are listed in §4 as bounded model assumptions and never asserted as sourced facts. Final duty exposure and OEM manual revision are confirmed at RFQ.

End of use case / TCO. Awaiting muse-ba sign-off.