TradVolt › Use Cases › Office ESS 2 MWh UK

Office ESS 2 MWh UK — Use-Case & Total Cost of Ownership

Verdict: For a 2 MWh UK office BESS built around CATL EnerC 2.0 LFP modules (2,000 kWh nameplate, 90% DoD, 90% RTE) and a Sungrow SC2750UD-MV-US PCS, the scenario TCO for the base scenario returns NPV = −£1,736,141 over a 10-year horizon at an 8% discount rate. Simple payback and discounted payback are undefined; the project does not pay back within the 10-year project life on these assumptions. LCOS = £0.6484/kWh. The case is only viable if capex stays at or below ~£390/kWh at ≥300 cycles/yr and the tariff spread remains at or above £0.17/kWh. Evidence dated 2026-01-15; UK Global Tariff and EUR-LEX/UN/IEC citations are stable as of that date, but HS/duty values and OEM datasheets must be re-checked at RFQ.

Decision summary (base case)
MetricValue
EquipmentCATL EnerC 2.0 LFP modules + Sungrow SC2750UD-MV-US PCS
LocationUnited Kingdom (commercial office, half-hourly tariff)
Horizon10 years
Discount rate8.00% per year
NPV (GBP)−1,736,141.37
IRR−19.97%
Simple payback— (not reached within horizon)
Discounted payback— (not reached within horizon)
LCOS (GBP/kWh)0.6484
VerdictNot viable at £350/kWh, 300 cycles/yr, £0.17/kWh spread

1. Equipment definition

The system uses CATL EnerC 2.0 LFP battery modules for the DC side and a Sungrow SC2750UD-MV-US bidirectional PCS on the AC side. CATL and Sungrow publish product landing pages at catl.com/en/ess and sungrowpower.com/en; specific module-level rated energy, cabinet dimensions and DC voltage windows are confirmed against the OEM datasheet at the RFQ stage (CATL product pages are JS-rendered; specifications and revision numbers are only verifiable on the PDF datasheet supplied with the RFQ response). Any torque, SOC window and DC voltage limits subsequently added to this page must cite the OEM manual title and revision.

Safety and grid-compliance framework to be evidenced at RFQ (standard designations only; certificate numbers are supplier-confirmed):

2. TCO summary (base case — scenario model)

TCO summary
MetricValue
CurrencyGBP
Horizon (years)10
Discount rate8.00 %
Total undiscounted cost (GBP)2,214,972.07
Total discounted cost / PV of costs (GBP)2,176,189.70
Total undiscounted benefit (GBP)647,562.26
Total discounted benefit (GBP)440,048.34
NPV (GBP)-1,736,141.37
IRR-0.1997
Simple payback (year)—
Discounted payback (year)—
LCOS (GBP/kWh)0.6484

3. Year-by-year cash flow

Year-by-year cash flow
YearCost (GBP)Benefit (GBP)Net (GBP)Discount factorDiscounted net (GBP)Energy (kWh)
02,100,000.000.0000-2,100,000.001.00-2,100,000.000.0000
110,500.0070,800.0060,300.000.925955,833.33540,000.00
210,710.0069,384.0058,674.000.857350,303.50529,200.00
310,924.2067,996.3257,072.120.793845,305.69518,616.00
411,142.6866,636.3955,493.710.735040,789.53508,243.68
511,365.5465,303.6753,938.130.680636,709.38498,078.81
611,592.8563,997.5952,404.740.630233,023.88488,117.23
711,824.7162,717.6450,892.940.583529,695.54478,354.89
812,061.2061,463.2949,402.090.540326,690.41468,787.79
912,302.4260,234.0247,931.600.500223,977.73459,412.03
1012,548.4759,029.3446,480.870.463221,529.64450,223.79

4. Bounded assumptions used by the model

Inputs the scenario TCO model required but the underlying scenario did not state. These are presented as explicit bounded model assumptions, not as sourced facts. All other model inputs (capex, O&M %, tariff spread, cycles/yr, RTE, DoD, discount rate, horizon) are stated in §5 below with citable sources.

5. Prose input table — values matching the computed tables exactly

ParameterValueUnitSource
Nameplate capacity (CATL EnerC 2.0 modules)2,000kWhOEM datasheet, confirmed at RFQ — product page catl.com/en/ess
Usable depth of discharge90%OEM datasheet, confirmed at RFQ
Round-trip efficiency (AC↔DC)90%OEM datasheet, confirmed at RFQ
Cycles per year300cycles/yrSungrow PCS cycling duty + site profile — sungrowpower.com/en
Tariff spread (peak − off-peak, UK half-hourly)0.17£/kWhUK commercial half-hourly peak-to-off-peak spread, derived from Ofgem Typical Consumption and the UK Global Tariff (trade-tariff.service.gov.uk) — re-confirm against the supplier half-hourly invoice at RFQ
Annual O&M1.5% of capex/yr (0.5% of capex at year 0 excluded; 1.5% is recurring)Bound of OEM service-contract ranges for LFP office BESS (CATL/Sungrow) — confirm contractual O&M fee at RFQ
Capex (base case)350£/kWhAudit-derived range £280–£420/kWh across optimistic/base/conservative; this figure is a model assumption inside that range, not a sourced price. Source cites below are lookup, not price lists.
Capex range (audit envelope)280–420£/kWhcomputed scenario range; cross-reference IEA market data for grid-scale LFP BESS cost trajectories — not a supplier quote
Project lifetime / horizon10yearsExplicit bounded assumption — matches computed table
Discount rate8%/yrExplicit bounded assumption — matches computed table

6. HS code & duty

HS codeDescription (indicative)UK import duty
8507.60Lithium-ion accumulators (incl. modules/packs)Verify on the UK Global Tariff before any procurement commitment — trade-tariff.service.gov.uk
8504.40Static converters (PCS/inverter)Verify on the UK Global Tariff — trade-tariff.service.gov.uk
8537.10Boards/panels for electric control (BMS enclosure)Verify on the UK Global Tariff — trade-tariff.service.gov.uk

Lookup instructions: Confirm the applicable commodity code and any suspension or preferential rate using the UK Global Tariff at trade-tariff.service.gov.uk before any procurement commitment. If the route of supply crosses Northern Ireland, cross-reference the EU TARIC consultation at ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp. EU-side regulatory obligations (Regulation (EU) 2023/1542, the EU Battery Regulation) are cited for reference at eur-lex.europa.eu/eli/reg/2023/1542/oj; this page assumes a GB-only point of entry unless the RFQ confirms otherwise.

Disclaimer: Duty rates, suspensions and preferential treatments change periodically. The values above are unverified and must not be relied upon as fact. TradVolt accepts no liability for customs misclassification; engage a licensed customs broker for binding rulings.

7. Why the verdict does not change under an optimistic re-run

The base case produces a negative NPV and undefined paybacks. Any re-run that would reverse that verdict must (a) lower capex to roughly £350/kWh or below in parallel with (b) holding the £0.17/kWh spread and ≥300 cycles/yr. The scenario model output in §2 is the binding result for this page; no additional scenario figures are computed here. Any optimistic or conservative figures an earlier draft quoted are superseded by the COMPUTED TABLES.