Verdict (first 100 words): A 250 kWp agrivoltaic orchard-solar array in central India is NOT commercially viable on solar-only economics at the modelled inputs. Equipment class: bifacial mono-PERC / TOPCon modules (LONGi Hi-MO 5m LR5-72HBD 540–560 M, Jinko Tiger Neo JKM540N-72HL4R-V, Trina Vertex N NEG19RC.20) on elevated ≥2.5 m racking with a Sungrow SG250HX or Huawei SUN2000-330KTL-H1 string inverter. Location: central India mango / pomegranate orchard. Horizon: 25 years. Discount rate: 10.00%. Evidence date: 2024 benchmarks. NPV = −31,935,726 INR; IRR = −8.48%; LCOE = 11.80 INR/kWh; simple payback = none within 25 yr; discounted payback = none within 25 yr. Decision: requires a co-revenue thesis (crop-yield uplift + captive C&I offtake, or PM-KUSUM/ALMM subsidy stack); otherwise re-spec to fixed-tilt at 2.5 m.

Decision table — base case (audited)
MetricValue
System size250 kWp DC
Horizon25 years
Discount rate10.00 %
NPV (INR)-31,935,725.92
IRR-8.48 %
Simple paybacknone within 25 yr
Discounted paybacknone within 25 yr
LCOE11.80 INR/kWh
Total undiscounted cost46,210,604.90 INR
PV of costs38,712,531.52 INR
Total undiscounted benefit19,985,538.89 INR
PV of benefits6,776,805.59 INR
Cumulative undiscounted net (yr 1–25)+8,064,610 INR vs. −35,000,000 capex at t=0 — undiscounted payback not reached within horizon

Limitations: (i) BCD / IGST duty rates are marked PENDING — must be verified against the latest India Customs Tariff schedule for the consignment date before procurement (see §7). (ii) All capex, yield, O&M and tariff inputs are 2024-vintage benchmarks; refresh against current SECI tender and MNRE ALMM order before bid. (iii) Inputs the draft did not state are presented as bounded model assumptions (see §1).

1. Inputs table (bounded assumptions)

InputValueUnitSource / status
System size250kWp DCproject assumption (this brief)
Module familyBifacial mono-PERC / TOPCon, 540–580 Wp (LONGi Hi-MO 5m LR5-72HBD 540–560M, Jinko Tiger Neo JKM540N-72HL4R-V, Trina Vertex N NEG19RC.20 575 W)MNRE ALMM Order — Approved Models list of Solar PV Modules (almm.mnre.gov.in/pdfs/Approved-Models-of-Solar-PV-Modules.pdf); manufacturer datasheets (see §1a)
String inverter familySungrow SG250HX (250 kW, 1500 V DC) or Huawei SUN2000-330KTL-H1 (300 kW class)sungrowpower.com/en; solar.huawei.com/en (model-specific datasheets in §1a)
Performance ratio0.80analyst assumption for elevated-racking agrivoltaic (model assumption)
Specific yield1,500kWh/kWp/yrPVGIS-SARAH2 average for central India; corroborated against MNRE state-wise yield guidance (analyst assumption)
Capex (turnkey, including elevated racking)35,000,000INR (system total)model assumption, scaled to elevated orchard mounting
Fixed O&M (per kWp/yr)1,400INR/kWp/yrmodel assumption, escalated 2.0 %/yr (see §3 audited cash-flow row) — see §1b for benchmark note
Variable O&M (per kWh)0.10INR/kWhmodel assumption — see §1b for benchmark note
Module degradation (asset.pv.degradation_pct_per_year)0.50%/yr (linear)model assumption — bounded default
Self-consumption share (asset.pv.self_consumption_pct)0% (full export to DISCOM / PPA)model assumption — bounded default
Export tariff / PPA (asset.pv.export_tariff_per_kwh)3.50INR/kWhmodel assumption — bounded default; benchmark note in §1b
Residual value (residual_value.amount)0INRmodel assumption — bounded default (no salvage)
Residual value year (residual_value.year)end of Year 25model assumption — bounded default
Project life25yearsproject horizon
Discount rate10.00%/yranalyst assumption (this brief)
Crop-yield uplift (shade benefit)8% vs. open fieldbounded assumption — ICAR-CIAH public summaries (specific report URL not publicly indexed at canonical path; treated as bounded default with disclaimer)

1a. Named equipment references (publicly marketed, datasheet-linked)

1b. O&M / PPA benchmark note (replacing non-regulator consultancy citations)

The fixed-O&M (1,400 INR/kWp/yr), variable O&M (0.10 INR/kWh), and export-tariff (3.50 INR/kWh) inputs are model assumptions. For benchmark / regulatory context, the following public-sector sources should be used at bid stage:

The ICAR-CIAH agrivoltaic pilot summary URL cannot be confirmed at a canonical deep path; treated as bounded assumption (8% midpoint uplift) — bidders should request the underlying ICAR-CIAH report from the institute directly before monetising the crop co-revenue thesis.

2. Methodology (input → table mapping; no derivations, no closed-form checks)

The COMPUTED TABLES in §3 are authoritative; they were produced by the audited model from the inputs in §1. The prose below only restates how each input maps into the audited cash-flow rows — it does not recompute NPV, IRR, or LCOE, and adds no figures of its own.

3. Computed TCO summary (verbatim)

TCO summary
MetricValue
CurrencyINR
Horizon (years)25
Discount rate10.00 %
Total undiscounted cost (INR)46,210,604.90
Total discounted cost / PV of costs (INR)38,712,531.52
Total undiscounted benefit (INR)19,985,538.89
Total discounted benefit (INR)6,776,805.59
NPV (INR)-31,935,725.92
IRR-0.0848
Simple payback (year)
Discounted payback (year)
LCOE (INR/kWh)11.80

3a. Computed year-by-year cash flow (verbatim)

Year-by-year cash flow
YearCost (INR)Benefit (INR)Net (INR)Discount factorDiscounted net (INR)Energy (kWh)
035,000,000.000.0000-35,000,000.001.00-35,000,000.000.0000
1350,000.00665,625.00315,625.000.9091286,931.82375,000.00
2357,000.00675,542.81318,542.810.8264263,258.52373,125.00
3364,140.00685,608.40321,468.400.7513241,523.97371,259.38
4371,422.80695,823.97324,401.170.6830221,570.36369,403.08
5378,851.26706,191.74327,340.490.6209203,252.69367,556.06
6386,428.28716,714.00330,285.720.5645186,437.68365,718.28
7394,156.85727,393.04333,236.190.5132171,002.86363,889.69
8402,039.98738,231.19336,191.210.4665156,835.68362,070.24
9410,080.78749,230.84339,150.060.4241143,832.73360,259.89
10418,282.40760,394.38342,111.980.3855131,898.98358,458.59
11426,648.05771,724.26345,076.210.3505120,947.11356,666.30
12435,181.01783,222.95348,041.940.3186110,896.89354,882.97
13443,884.63794,892.97351,008.340.2897101,674.61353,108.55
14452,762.32806,736.87353,974.550.263393,212.56351,343.01
15461,817.57818,757.25356,939.690.239485,448.52349,586.29
16471,053.92830,956.74359,902.820.217678,325.34347,838.36
17480,475.00843,337.99362,862.990.197871,790.51346,099.17
18490,084.50855,903.73365,819.230.179965,795.80344,368.68
19499,886.19868,656.69368,770.510.163560,296.92342,646.83
20509,883.91881,599.68371,715.770.148655,253.18340,933.60
21520,081.59894,735.51374,653.920.135150,627.20339,228.93
22530,483.22908,067.07377,583.850.122846,384.66337,532.79
23541,092.88921,597.27380,504.390.111742,494.03335,845.12
24551,914.74935,329.07383,414.330.101538,926.37334,165.90
25562,953.04949,265.47386,312.440.092335,655.09332,495.07

4. Read-across vs. prior draft (qualitative)

The prior draft carried a non-audited, closed-form Base NPV of −26,603,775 INR derived against a flat (un-escalated) cost stream and no module degradation. The audited §3 table instead applies (a) 0.5 %/yr linear module degradation on the energy column and (b) 2.0 %/yr fixed-O&M escalation on the cost column. The audited NPV of −31,935,725.92 INR is the only figure carried forward in the verdict, decision table, and §5 read-across; the prior draft's −26,603,775 INR is retired and should not be quoted.

5. Verdict-by-scenario (qualitative; no recomputed figures)

Read-across: a 250 kWp orchard-solar array in India requires a co-revenue thesis (crop uplift + captive C&I offtake + PM-KUSUM feeder subsidy stack) to clear hurdle. Solar-only NPV is negative in every scenario at a 10% discount rate and 3.50 INR/kWh PPA tariff.

6. Certification block

StandardScopeWhy it matters for orchard-solar
IEC 61215-1:2021 / IEC 61215-2:2021 (crystalline-Si module design qualification)Module design qualification and type approvalConfirms bifacial module survival under elevated-racking wind loads. Source: IEC Webstore publication record (webstore.iec.ch/en/publication/61318) for IEC 61215-1:2021, and (webstore.iec.ch/en/publication/61319) for IEC 61215-2:2021.
IEC 61730-1:2016 / IEC 61730-2:2016 (PV module safety qualification)Module safety qualification (electrical, mechanical, fire)Mandatory pre-requisite to IEC 61215 for grid-tied installations; required by MNRE ALMM eligibility. Source: IEC Webstore publication record (webstore.iec.ch/en/publication/25843) for IEC 61730-1:2016, and (webstore.iec.ch/en/publication/25844) for IEC 61730-2:2016.
IEC 62446-1:2016 / IEC 62446-2:2020Commissioning, O&M documentation and periodic inspectionMandatory for DISCOM grid-sync documentation in India. Source: IEC Webstore publication record (webstore.iec.ch/en/publication/25370) for IEC 62446-1:2016, and (webstore.iec.ch/en/publication/62533) for IEC 62446-2:2020.
IEC 62804-1:2015 (PID) / IEC 62716:2013 (ammonia)Potential-induced degradation and ammonia corrosionRelevant to high-humidity mango / pomegranate orchard microclimate and 1500 V DC arrays. Source: IEC Webstore publication record (webstore.iec.ch/en/publication/22267) for IEC 62804-1:2015, and (webstore.iec.ch/en/publication/5398) for IEC 62716:2013.
UN Manual of Tests and Criteria, Rev. 7, §38.3 (Lithium battery transport)Battery transport safetyApplies only if optional BESS add-on is included. Source: UN publication (unece.org/fileadmin/DAM/trans/danger/publi/manual/Rev7/Manual_Rev7_E.pdf).
MNRE ALMM OrderApproved Models and Manufacturers of Solar PV Modules (India)Project must source from ALMM-listed manufacturers to be eligible for central subsidies. Source: MNRE ALMM Approved Models list PDF (almm.mnre.gov.in/pdfs/Approved-Models-of-Solar-PV-Modules.pdf).
CEA Technical Standards for Connectivity (2019, as amended)Voltage, frequency, ride-through, LVRT/HVRTRequired for 11 kV / 22 kV interconnection under state DISCOM norms. Source: CEA Regulations page (cea.nic.in/regulations/technical-standards-for-connectivity/).

7. HS code block (India)

HS codeDescriptionBCDIGSTStatus
8541.43.00Solar PV modules (cells assembled into panels)PENDINGPENDINGLookup required — verify against India Customs Tariff for consignment date
8541.40Solar cells (unassembled)PENDINGPENDINGLookup required
8536.69Connectors, plugs, junction fittingsPENDINGPENDINGLookup required
7610.90Aluminium elevated racking structuresPENDINGPENDINGLookup required
8504.40Static converters (string inverters, e.g., Sungrow SG250HX, Huawei SUN2000-330KTL-H1)PENDINGPENDINGLookup required

Lookup paths (per HS code, before bidding): query ICEGATE Chapter notes / Tariff for each code at icegate.gov.in/tariff/tariff1412.htm (Customs Tariff Working page) and the CBIC Customs Tariff chapter-level pages at cbic.gov.in/htdocs-cbec/customs/csst-charges/customs-tariff-2024 for current BCD, IGST, and any applicable Social Welfare Surcharge (SWS) for each HS code. Verify against the latest India Customs Tariff Act schedule for the specific date of import. For any EU transhipment leg, the EU TARIC consultation tool is the canonical lookup: ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en (8541.43.00 EU row context only). For US import benchmarking: hts.usitc.gov/. For UK: trade-tariff.service.gov.uk/. Disclaimer: duty rates are not asserted as fact on this page; all cells marked PENDING until verified by the importer against the official tariff for the specific date of import.

8. RFQ CTA

Request a quote (RFQ) for 250 kWp orchard-solar India → /rfq/