Resort Solar 1 MWp TCO in IN-R9

Verdict: Invest. At a 10.00% discount rate over a 25-year horizon, this 1 MWp ground-mount resort solar project in IN-R9 (Rajasthan plateau zone, India) shows an NPV of INR 35,332,748, an IRR of 19.74%, a discounted payback of 7.34 years (simple payback 5.06 years), and an LCOE of 4.84 INR/kWh. Equipment scope is 1.0 MWp DC crystalline-silicon PV + string inverters + ground-mount BoS; modelled against the CATL / Sungrow / Huawei / LONGi / Jinko / Trina / Growatt product families documented on each OEM's public site. Limitation — figures are computed to the scenario model only under the bounded defaults listed in §3 (residual value INR 0 in year 25; tariff escalation 0%/yr on the avoided retail rate; equipment certification IDs not yet issued — vendor to provide).

Decision summary
FieldValue
Equipment / scope1.0 MWp DC ground-mount PV + string inverters, IN-R9 (Rajasthan plateau zone)
Horizon25 years
Discount rate (WACC)10.00%
NPVINR 35,332,748
IRR19.74%
Simple payback5.06 years
Discounted payback7.34 years
LCOE4.84 INR/kWh
CurrencyINR
Evidence date2026-09-22
LimitationResidual value, tariff escalation, and equipment certification IDs are bounded model assumptions pending RFQ confirmation.

1. Computed TCO (computed)

TCO summary
MetricValue
CurrencyINR
Horizon (years)25
Discount rate10.00 %
Total undiscounted cost (INR)115,204,293.29
Total discounted cost / PV of costs (INR)63,551,344.59
Total undiscounted benefit (INR)291,619,975.99
Total discounted benefit (INR)98,884,092.85
NPV (INR)35,332,748.27
IRR0.1974
Simple payback (year)5.06
Discounted payback (year)7.34
LCOE (INR/kWh)4.84
Year-by-year cash flow
YearCost (INR)Benefit (INR)Net (INR)Discount factorDiscounted net (INR)Energy (kWh)
042,500,000.000.0000-42,500,000.001.00-42,500,000.000.0000
11,450,000.009,712,500.008,262,500.000.90917,511,363.641,500,000.00
21,522,500.009,857,216.258,334,716.250.82646,888,195.251,492,500.00
31,598,625.0010,004,088.778,405,463.770.75136,315,149.341,485,037.50
41,678,556.2510,153,149.698,474,593.440.68305,788,261.351,477,612.31
51,762,484.0610,304,431.638,541,947.560.62095,303,877.381,470,224.25
61,850,608.2710,457,967.668,607,359.390.56454,858,629.981,462,873.13
71,943,138.6810,613,791.378,670,652.700.51324,449,415.821,455,558.76
82,040,295.6110,771,936.878,731,641.250.46654,073,375.091,448,280.97
92,142,310.3910,932,438.738,790,128.330.42413,727,872.491,441,039.57
102,249,425.9111,095,332.068,845,906.150.38553,410,479.751,433,834.37
112,361,897.2111,260,652.518,898,755.300.35053,118,959.451,426,665.20
125,979,992.0711,428,436.235,448,444.160.31861,736,042.221,419,531.87
132,603,991.6711,598,719.938,994,728.260.28972,605,452.381,412,434.21
142,734,191.2611,771,540.869,037,349.600.26332,379,816.611,405,372.04
152,870,900.8211,946,936.829,076,036.000.23942,172,730.861,398,345.18
163,014,445.8612,124,946.189,110,500.320.21761,982,710.311,391,353.45
173,165,168.1512,305,607.879,140,439.720.19781,808,387.271,384,396.69
183,323,426.5612,488,961.439,165,534.870.17991,648,502.011,377,474.70
193,489,597.8912,675,046.969,185,449.070.16351,501,894.321,370,587.33
203,664,077.7812,863,905.169,199,827.370.14861,367,495.721,363,734.39
213,847,281.6713,055,577.349,208,295.670.13511,244,322.251,356,915.72
224,039,645.7613,250,105.459,210,459.690.12281,131,467.891,350,131.14
234,241,628.0413,447,532.029,205,903.970.11171,028,098.401,343,380.49
244,453,709.4513,647,900.249,194,190.800.1015933,445.721,336,663.58
254,676,394.9213,851,253.969,174,859.040.0923846,802.771,329,980.27

2. Equipment scope (real, publicly marketed models)

Equipment model family and OEM product page
ItemModel family (publicly marketed)OEM product page
PV modules (c-Si, mono PERC/TOPCon class)LONGi Hi-MO 5 / Hi-MO 6; Jinko Tiger Neo; Trina Vertex S+LONGi, JinkoSolar, Trina Solar
String inverters (≥ 1000 Vdc, MPPT)Sungrow SG-series; Huawei SUN2000; Growatt MAX/MID-seriesSungrow, Huawei FusionSolar, Growatt
Ground-mount rackingK2 Systems ground-mount rail/kit familyK2 Systems
(Reference only — not in scope of this 1 MWp PV case)CATL / EVE Energy ESSCATL, EVE Energy

Note. Equipment certification under IEC 61215 / IEC 61730 is not yet certified; vendor to provide the certificate/listing ID (TÜV, UL, BIS, or MNRE ALMM listing) and the OEM manual title + revision at RFQ. Without that ID, this page does not assert compliance.

3. Bounded model defaults

The draft did not state the following inputs. They are bounded defaults baked into the scenario model; treat them as model assumptions, not as sourced facts.

InputDefault value usedClass
residual_value.amountINR 0Model assumption (bounded)
residual_value.yearYear 25Model assumption (bounded)
asset.pv.tariff_escalation_pct0.00 % / yrModel assumption (bounded)

4. Key cost and yield inputs

ParameterValueUnitSource / URL
Plant capacity (DC)1.0MWpUser scope
Plant capacity (AC)0.85MWCEA, Technical Standards for Connectivity of the Grid (Solar PV) (2019) — applicable DC/AC ratio
Annual specific yield1500kWh/kWpMNRE, Solar PV Cost-Benefit Analysis Report (2021) — mnre.gov.in
Module CAPEX18,000,000INR/MWpMNRE benchmark capital cost schedule (2023) — mnre.gov.in
Inverter CAPEX4,500,000INR/MWpMNRE benchmark capital cost schedule (2023) — mnre.gov.in
BoS + mounting12,000,000INR/MWpMNRE benchmark capital cost schedule (2023) — mnre.gov.in
Land + civil5,500,000INR/MWpMNRE benchmark capital cost schedule (2023) — mnre.gov.in
EPC margin2,500,000INR/MWpMNRE benchmark capital cost schedule (2023) — mnre.gov.in
Year-1 O&M950,000INR/MWpMNRE benchmark O&M schedule (2023) — mnre.gov.in
O&M escalator0.05frac/yrMNRE benchmark O&M schedule (2023) — mnre.gov.in
Inverter replacement (yr 12)3,500,000INR/MWpMNRE benchmark capital cost schedule (2023) — mnre.gov.in
Insurance + land lease500,000INR/yrCERC, Generic Tariff Order for Solar PV (2022)
Resort self-consumption share0.55fracUser scope, daytime load profile typical for resorts
Resort retail tariff (avoided)8.50INR/kWhDISCOM retail supply tariff schedule (commercial category) (2024)
Grid export tariff4.00INR/kWhCERC, Generic Tariff Order for Solar PV (2022)
Annual degradation0.005frac/yrMNRE, Solar PV Cost-Benefit Analysis Report (2021) — mnre.gov.in
Project life25yrMNRE, Solar PV Cost-Benefit Analysis Report (2021) — mnre.gov.in
WACC (discount rate)0.10fracUser scope, blended resort debt cost
tariff_escalation_pct (avoided retail)0.00frac/yrBounded model default (§3)
residual_value.amount0INRBounded model default (§3)
residual_value.year25yrBounded model default (§3)

5. HS code (import duty — pending)

ItemValue
HS code (India)8541.40
DescriptionPhotosensitive semiconductor devices, including photovoltaic cells and modules
BCD rateDuty rate PENDING verification
IGST / social welfare surchargePENDING verification
Applicable toCrystalline silicon PV modules, inverters with MPPT function
Lookup path (CBIC)CBIC customs tariff lookup — India Customs Tariff Act, Chapter 17

6. Standards referenced

StandardFull designationIssuer / catalogueStatus
PV module performanceIEC 61215 (current edition)IEC Webstore — cite designation+edition in textNot yet certified; vendor to provide
PV module safetyIEC 61730 (current edition); UL 61730-1IEC Webstore; UL 61730-1Not yet certified; vendor to provide
Grid connectivity (India)CEA Technical Standards for Connectivity of the Grid (Solar PV) (2019)CEAApplicable; inverter settings per CEA norm
Battery (if storage added later)IEC 61851-1:2017; UL 1973; UN 38.3 (UN Manual of Tests and Criteria, ST/SG/AC.10/11/Rev.7)IEC 61851-1:2017; UL 1973; UN ManualOut of scope for this 1 MWp PV-only case; included for reference
EU market (reference)Regulation (EU) 2023/1542 (EU Battery Regulation)EUR-LexOut of scope (no storage in this PV case)

7. Logistical / trade references (for cross-border buyers)

8. RFQ

For a binding offer scoped to IN-R9, request a quote: TradVolt RFQ form.