TradVolt › Use Cases › Steel-Plant ESS 6 MWh — LatAm

Status: Awaiting review · noindex, nofollow

Steel-Plant ESS 6 MWh — LatAm TCO Use Case

Verdict (model run, evidence date 2026-09-22, horizon 10 yr, discount rate 10.00%): NPV = −USD 1,656,462; simple payback = None; discounted payback = None; IRR = −0.1712; LCOS = USD 0.2104 / kWh. Across the modelled scenario the project does not recover capex from the modelled cash flows; the dominant value driver (demand-charge displacement) is insufficient at the modelled EAF equivalent tariff of USD 0.115/kWh and the modelled Brazilian SE/CO MV reference tariff band. Equipment: CATL 280 Ah prismatic LFP cells in a Sungrow ST3440KWH(S)-3500UD-MV PCS skid (BMS/EMS per Sungrow OEM manuals, revision confirmed at RFQ); limitation — CATL cell and Sungrow PCS product pages are JS-rendered; exact firmware revision is set at contract.

Decision table

MetricValue
NPV (USD)-1,656,462.16
IRR-0.1712
Simple payback (year)—
Discounted payback (year)—
LCOS (USD/kWh)0.2104
Total discounted cost / PV of costs (USD)2,378,263.06
Total discounted benefit (USD)721,800.90
Equipment familyCATL 280 Ah prismatic LFP cells in Sungrow ST3440KWH(S)-3500UD-MV PCS skid
LocationLatAm integrated steel plant, MV interconnection, Brazil SE/CO reference tariff band (model assumption)
Horizon10 years
Evidence date2026-09-22

1. Equipment, datasheets & manuals (named, public)

ItemPublic datasheet / product pageUse here
CellCATL energy storage landing — CATL 280 Ah prismatic LFP cell (cell nameplate model confirmed at RFQ; CATL ESS product pages JS-rendered)LFP cell chemistry, cycle life assumption basis
PCS skidSungrow Power landing — Sungrow ST3440KWH(S)-3500UD-MV (utility-scale MV-integrated PCS+BESS skid, publicly marketed family); datasheet rev confirmed at RFQDC round-trip efficiency η = 0.88, MV interface
BMS / EMSSungrow iSolarCloud / on skid EMS; manual title and firmware rev confirmed at RFQControl envelope
PCS safety standardIEC Webstore — IEC 62477-1:2016+AMD1:2017 CSV edition, Power electronic converter systems — Part 1: General requirements (cite full designation IEC 62477-1:2016/AMD1:2017 CSV in text at RFQ)Procurement spec
BESS safety standardIEC Webstore — IEC 62933-2-1:2017, Safety requirements for secondary lithium cells and batteries for use in electrical energy storage systems — Part 2-1: Stationary applications (cite full designation IEC 62933-2-1:2017 in text at RFQ)Procurement spec
Stationary battery standardUL 1973 — Batteries for Use in Stationary and Motive Auxiliary Power ApplicationsCell/safety qualification reference
Lithium-battery transport testUN Manual of Tests and Criteria, ST/SG/AC.10/11/Rev.7 (UN 38.3)Shipping compliance for LFP cells
EU Battery RegulationRegulation (EU) 2023/1542If destination is EU: due-diligence, labelling, recycling

Limitation: CATL and Sungrow product pages are JS-rendered; exact firmware / manual revision is confirmed at RFQ against the OEM datasheet and installation & operation manual revision.

2. Model inputs

VariableSymbolValueSource / status
Energy capacityE6,000 kWhUse-case specification (TradVolt)
Power ratingP12,000 kWUse-case specification (TradVolt); bounded to Sungrow ST3440KWH(S)-3500UD-MV skid family
DC round-trip efficiencyη0.88Model assumption — bounded to CATL LFP cell + Sungrow PCS skid OEM datasheet band 0.86–0.90; rev confirmed at RFQ [CATL ESS landing, Sungrow landing]
Equivalent full cycles per yearC330Model assumption — C&I operating profile (1 cycle/day on operating days)
Operating days per yearD330Model assumption — 330/365 of calendar days
Capex per kWh (turnkey, LatAm delivered)CXUSD 350 / kWhModel assumption — public C&I LFP turnkey band USD 320–400
Fixed O&M, % of capex per yearOM2.0%Model assumption — utility-scale BESS O&M band
Peak demand charge (MV, USD/kW-month)DCUSD 9.00 / kW-monthModel assumption — Brazilian SE/CO industrial MV reference band (specific ANEEL resolution number pending; see §4)
Off-peak grid tariff (MV, USD/kWh)GPUSD 0.045 / kWhModel assumption — Brazilian SE/CO industrial MV off-peak reference band
EAF equivalent tariff (charged to EAF if peak-imported, USD/kWh)EPUSD 0.115 / kWhModel assumption — Brazilian SE/CO industrial peak reference band
Demand charge offset, fraction of rated kWfkW0.50Model assumption — 50% of 12 MW peak shaved
Discharge hours per peak-day equivalentH3.0 hModel assumption — arbitrage window length
Project lifeNy10 yearsModel assumption — bounded 8–12 yr LatAm standard
Discount rater10.00%Model assumption — LatAm commercial WACC band
Residual value amountRV0 USDModel assumption (explicit bounded default)
Residual value yearRVy10 (end of horizon)Model assumption (explicit bounded default)
ESS usable fractionu1.00Model assumption (explicit bounded default)
ESS degradation per yeardeg2.0% / yrModel assumption (explicit bounded default); throughput taper per the year-by-year table below

3. scenario TCO tables (verbatim — do not re-derive)

TCO summary. Currency USD; horizon 10 yr; discount rate 10.00%.

TCO summary
MetricValue
CurrencyUSD
Horizon (years)10
Discount rate10.00 %
Total undiscounted cost (USD)2,559,888.28
Total discounted cost / PV of costs (USD)2,378,263.06
Total undiscounted benefit (USD)1,156,557.18
Total discounted benefit (USD)721,800.90
NPV (USD)-1,656,462.16
IRR-0.1712
Simple payback (year)—
Discounted payback (year)—
LCOS (USD/kWh)0.2104

Year-by-year cash flow. Discount factor column equals 1/(1+r)y with r = 10.00%; energy column equals E × C × η × (1 − deg)y with degradation taper 2.0%/yr applied to throughput.

Year-by-year cash flow
YearCost (USD)Benefit (USD)Net (USD)Discount factorDiscounted net (USD)Energy (kWh)
02,100,000.000.0000-2,100,000.001.00-2,100,000.000.0000
142,000.00126,450.0084,450.000.909176,772.731,980,000.00
242,840.00123,921.0081,081.000.826467,009.091,940,400.00
343,696.80121,442.5877,745.780.751358,411.561,901,592.00
444,570.74119,013.7374,442.990.683050,845.571,863,560.16
545,462.15116,633.4571,171.300.620944,191.781,826,288.96
646,371.39114,300.7867,929.390.564538,344.371,789,763.18
747,298.82112,014.7764,715.950.513233,209.511,753,967.91
848,244.80109,774.4761,529.680.466528,704.051,718,888.56
949,209.69107,578.9858,369.290.424124,754.281,684,510.78
1050,193.89105,427.4055,233.520.385521,294.911,650,820.57

4. Standards & compliance (mini-cert block)

StandardScopeStatus for this use caseReference
IEC 62933-2-1:2017BESS safety — stationary applicationsProcurement spec — confirm vendor cert at RFQIEC Webstore catalogue
IEC 62477-1:2016/AMD1:2017 CSVPower electronic converter safetyProcurement spec — confirm vendor cert at RFQIEC Webstore catalogue
IEEE 1547 / IEEE 2800Interconnection (grid-tied)Procurement spec — confirm conformance with local ONS / CAMMESA / CENACE rulesIEEE Xplore; local grid-code resolution number
UL 1973Stationary / motive auxiliary batteryRecommended for LFP cellsUL 1973 product page
UL 9540AThermal runaway propagation testRecommended for indoor/containerized LFPUL Standards catalog (UL 9540A)
UN 38.3 (ST/SG/AC.10/11/Rev.7)Lithium-battery transport testMandatory for shipment of LFP cellsUN Manual of Tests and Criteria
Regulation (EU) 2023/1542EU Battery RegulationApplies if destination is EUEUR-Lex 2023/1542

5. HS code & duty lookup

HS classification for BESS units varies by jurisdiction and by whether the unit is imported as a complete enclosure, as cells with separate PCS, or as a kit. This page does not assert a duty rate; use the official lookups below and confirm with a licensed customs broker in the destination country.

HS heading (candidate)DescriptionLookup
8507.60Lithium-ion accumulators (cells/modules)EU: TARIC; US: USITC HTS; UK: UK Global Tariff
8504.40Static converters (PCS)Same lookups
8504.90Parts of static convertersSame lookups
8537.10Boards / panels for electric control (EMS, BMS)Same lookups
9405 / 7612Enclosures / racking (aluminium, steel)Same lookups

Additional destination lookups: Japan — Japan Customs; Australia — Australian Border Force; South Africa — SARS; Ghana — GRA; Uganda — URA; general — US ITA, US CBP.

Brazil: duty and tariff resolution numbers are published by ANEEL (tariff) and by Receita Federal / Comex Stat (NCM duty). The specific ANEEL tariff resolution number for the SE/CO industrial MV reference band is not asserted on this page; confirm against the current ANEEL resolution before procurement. Brazilian SE/CO reference band used here as a model assumption.

Freight / Incoterms: ICC Incoterms 2020; dangerous goods carriage: IATA DGR; freight documents: FIATA; wood packaging: IPPC ISPMs (ISPM 15).