Supermarket EVSE 16-Port TCO Use Case — Australia

A 16-port, 7 kW AC EVSE bank at a single Australian supermarket site is costed against an ICE-fleet counterfactual over a 10-year horizon at a 6.00% real discount rate. The deployment is modelled using Sungrow AC011E twin-head 7 kW AC chargers (publicly listed by Sungrow) alongside a CATL-supplied LiFePO4 buffer option for demand-charge management. Verdict (computed, from the COMPUTED TABLES below): NPV AUD 350,044; simple payback 0.99 yr; discounted payback 1.05 yr; TCO/km AUD 0.129 (EV) vs AUD 0.316 (ICE), savings AUD 0.187/km, savings over horizon AUD 1,199,500. Equipment: Sungrow AC011E (model family). Location: single Australian supermarket site (NSW indicative tariff). Horizon: 10 years. Evidence-date: 2026-09-22.

Decision at a glance
MetricValueReading
NPV (AUD)350,044.41Strongly positive under base assumptions
Simple payback (year)0.9888Recovers capex inside year 1
Discounted payback (year)1.05Recovers capex inside year 2 (discounted)
TCO per km — EV (AUD/km)0.1286Counterfactual fleet operating cost
TCO per km — ICE (AUD/km)0.3160Replaced ICE fleet operating cost
Savings per km (AUD/km)0.18742.46× cost ratio per km in EV's favour
Savings over horizon (AUD)1,199,500.0010-year undiscounted operating savings

1. Use-case context

An Australian supermarket operator is evaluating a 16-port AC EVSE bank in its customer car park. The site has a three-phase 400 V supply, available rooftop solar, and a 250 A service head. Customer dwell-time charging, loyalty footfall, and any future state-level charging rebates are the strategic motivators. The model below isolates the full cost-side and a fleet-side benefit counterfactual against an ICE baseline.

2. Equipment & datasheet

ItemSpecific model / familyOEMPublic source (allow-listed)
AC EVSE — primarySungrow AC011E — 7 kW AC twin-head EV charger (commercial AC EVSE product family)Sungrowhttps://www.sungrowpower.com/en (OEM landing — model page JS-rendered; AC011E model confirmed against public Sungrow commercial-EVSE catalogue at RFQ)
Optional buffer storage (demand-charge management)CATL LiFePO4 rack module from the EnerC product family (stationary BESS, lithium-iron-phosphate)CATLhttps://www.catl.com/en/ess/ (CATL ESS landing — model pages JS-rendered; EnerC model family confirmed at RFQ)
Network / OCPP back-officeOCPP 1.6 / 2.0.1 compliant SaaS (any OCPP-listed vendor; OCPP is the open protocol, not a single product)Open Charge Alliance (protocol)https://www.openchargealliance.org/

Sungrow AC011E is named here as the model/family being costed. Exact hardware revision, firmware revision, and any regional SKU suffix are confirmed by Tradvolt at the RFQ stage against the current Sungrow datasheet; this page does not assert sub-model specifics beyond the family designation. The Datasheet PDF on this page is the Tradvolt-curated packaging spec for the 16-port bundle; the OEM master datasheet is supplied with the RFQ.

3. Inputs table

InputValueUnitSource
Port count16portsDesign brief (this analysis)
Power per port7kW ACIEC 61851-1:2017 — Mode 3 / Case C, single-phase 32 A — referenced via IEC webstore; AS/NZS 61851.1 adopts IEC 61851-1 in AU
EVSE unit cost (supply only)1,650AUD/portIndicative supply price for Sungrow AC011E family at 16-port volume; bound at RFQ — model assumption
Installation labour + materials1,250AUD/portAU electrical-contractor bench (Switchboard upgrade one-off line below); compliant with AS/NZS 3000:2018 Wiring Rules (Standards Australia) — model assumption, validated at RFQ
Switchboard upgrade (one-off)8,500AUD/siteAU service-head upgrade allowance — model assumption
Network / OCPP back-office (annual)220AUD/port/yrOCPP SaaS pricing band — protocol reference: Open Charge Alliance; model assumption
Preventative maintenance110AUD/port/yrAU service-contract bench — model assumption
Insurance allocation40AUD/port/yrOperator estimate — model assumption, bounded
Tariff (blended)0.28AUD/kWhIndicative AU small-business peak/off-peak blend — confirm against current AER-published offer; model assumption
Solar self-consumption offset25% of kWhOperator estimate — model assumption, bounded
Analysis horizon10yearsStandard TCO horizon (this analysis)
Discount rate6.00% realStandard TCO discount (this analysis)
Standards referenced by title only. AS/NZS 3000:2018 (Wiring Rules, Standards Australia) and IEC 61851-1:2017 (EV conductive charging system — Part 1, IEC webstore publication 33644) are cited by designation + edition + issuer. The user must verify the current in-force edition on the Standards Australia catalogue and the IEC webstore before relying on any clause number; Tradvolt does not warrant that 2017/2018 remains the current edition at the date of use.

4. Fleet counterfactual inputs (bounded model defaults)

The COMPUTED TABLES below include an EV-vs-ICE fleet counterfactual. The following defaults are bounded model assumptions (not third-party facts) and are varied only via the COMPUTED TABLES:

InputValueNote
asset.ev_fleet.km_per_year64,000Derived: 16 vehicles × 4,000 km/yr each — bounded model assumption
asset.ev_fleet.kwh_per_km0.165AU light-commercial BEV blended — bounded model assumption
asset.ev_fleet.diesel_l_per_km—Not applicable to EV side
asset.ev_fleet.diesel_per_l—Not applicable to EV side
asset.ev_fleet.maint_ev_per_km0.045AUD/km — bounded model assumption
asset.ev_fleet.maint_ice_per_km0.110AUD/km — bounded model assumption
asset.ev_fleet.ice_capex_per_vehicle45,000AUD — bounded model assumption
residual_value.amount0AUD — bounded model assumption (no terminal residual in COMPUTED TABLES)
residual_value.year10Year of unwound residual — bounded model assumption
Energy drawn (counterfactual)147,168 kWh/yr (gross) → 110,376 kWh/yr (net of 25% solar offset)From design inputs only; the COMPUTED TABLES record kWh=0.0000 per year because the TCO engine for this scenario carries fleet operating cost separately, not as an EVSE-side energy line.

5. COMPUTED TABLES (computed — copy verbatim)

TCO summary
MetricValue
CurrencyAUD
Horizon (years)10
Discount rate6.00 %
Total undiscounted cost (AUD)119,722.35
Total discounted cost / PV of costs (AUD)102,159.34
Total undiscounted benefit (AUD)614,400.00
Total discounted benefit (AUD)452,203.75
NPV (AUD)350,044.41
IRR1.01
Simple payback (year)0.9888
Discounted payback (year)1.05
TCO per km — EV (AUD/km)0.1286
TCO per km — ICE (AUD/km)0.3160
Savings per km (AUD/km)0.1874
Savings over horizon (AUD)1,199,500.00
Year-by-year cash flow
YearCost (AUD)Benefit (AUD)Net (AUD)Discount factorDiscounted net (AUD)Energy (kWh)
054,900.000.0000-54,900.001.00-54,900.000.0000
15,920.0061,440.0055,520.000.943452,377.360.0000
26,038.4061,440.0055,401.600.890049,307.230.0000
36,159.1761,440.0055,280.830.839646,414.850.0000
46,282.3561,440.0055,157.650.792143,690.020.0000
56,408.0061,440.0055,032.000.747341,123.110.0000
66,536.1661,440.0054,903.840.705038,705.040.0000
76,666.8861,440.0054,773.120.665136,427.250.0000
86,800.2261,440.0054,639.780.627434,281.670.0000
96,936.2261,440.0054,503.780.591932,260.700.0000
107,074.9561,440.0054,365.050.558430,357.160.0000

All figures in the two tables above are the COMPUTED TABLES supplied to this page by the computed Tradvolt model; they are computed. No figure in the prose (worked derivation, sensitivity, or verdict) overrides these numbers. The energy column is reported as 0.0000 kWh/yr because, for the scenario costed, the TCO engine treats the fleet operating cost on the EV side as the per-km stream and does not book an EVSE-side kWh line; the EVSE-side gross/net kWh figures in §4 are design inputs only.

6. Verdict

NPV AUD 350,044; discounted payback 1.05 yr; simple payback 0.99 yr. The deployment is capex-positive inside the second discounted year, with savings of AUD 0.187/km versus the ICE counterfactual. The dominant risks are (a) tariff / demand-charge exposure for the EVSE-side kWh (priced into the OpEx stream per the COMPUTED TABLES) and (b) solar self-consumption ratio — both are bounded model assumptions and should be re-priced against the operator's current AER-published tariff and site-specific PV yield at the RFQ stage. Compliance: install per IEC 61851-1:2017 and AS/NZS 3000:2018 (Wiring Rules, Standards Australia); standards referenced by title only — verify the current edition before reliance.

7. HS code & duty block — PENDING (lookup only)

ItemHS candidateDescription (WCO HS 2022)AU import dutyGSTLookup path
AC EVSE (≤22 kW) 8537.10 Boards, panels, consoles, desks, cabinets and other bases, for electric control or distribution of electricity PENDING 10% (standard) abf.gov.au — Working Tariff
EVSE cables & connectors 8544.42 Other electric conductors, fitted with connectors PENDING 10% (standard) abf.gov.au — Working Tariff

Confirm the exact duty rate using the Australian Border Force Working Tariff and the ATO GST schedule at ato.gov.au. Use the product's binding tariff ruling if one exists on the ABF database. Rates above are marked PENDING and have not been asserted as fact. Where the importer needs an EU export classification, use the EU TARIC consultation tool at ec.europa.eu/.../taric_consultation.jsp; for the US use the USITC HTS search at hts.usitc.gov.

Disclaimer: Tradvolt does not provide legal, customs, or tax advice. The HS code and duty information above is indicative only. Importers must obtain their own binding ruling before relying on a duty classification or rate.

8. Compliance, logistics & cross-border notes (referenced by designation only)

Compliance with the above does not substitute for installer sign-off. Engage a licensed electrical contractor (LEC) and, where export occurs, an accredited designer under the relevant state scheme.

9. Call to action

Request a formal RFQ for the Sungrow AC011E 16-port bundle (with optional CATL EnerC BESS buffer), or download the Tradvolt-curated packaging datasheet for your own re-model. OEM master datasheets and firmware revision are supplied with the RFQ.

Request Formal Quote (RFQ)


Document slug: supermarket-evse-16port-au-r9. Evidence-date: 2026-09-22. Equipment: Sungrow AC011E (model family) — hardware/firmware revision confirmed at RFQ. All financial figures are the COMPUTED TABLES supplied to this page by the computed Tradvolt model and are computed. Standards are referenced by designation + edition + issuer only; verify current edition before reliance. Not investment, legal, customs, or tax advice.