tradvolt.comUse-cases › Supermarket Solar 700 kWp AU — Row 9

Supermarket Solar 700 kWp — Australian Supermarket TCO

Equipment family: Jinko Solar Tiger Neo N-type JKM580N-7RL3 modules + Sungrow SG125HV string inverters. Location: Australia (state-average commercial tariff). Horizon: 25 years. Evidence date: Audited model output dated 2026-01-15, page revised 2026-09-22. Limitation: model scenario, not a site-specific quote.

Verdict (answer-first)

NPV = AUD 2,103,013.50 over 25 years at a 7.00% real discount rate. Simple payback = 3.36 years. Discounted payback = 3.95 years. LCOE = AUD 0.0796 / kWh. IRR = 30.59%. Under the audited base case the system returns capital within roughly four years on a discounted basis; the lifetime undiscounted envelope is strongly positive (AUD 5.68m benefit vs AUD 1.10m cost) and time-value at 7% real leaves the project well above water. The economics support a proceed decision at the bounded assumptions stated below; re-confirm tariff escalation and self-consumption share against the site's interval-metered load before commitment.

TCO summary
MetricValue
CurrencyAUD
Horizon (years)25
Discount rate7.00 %
Total undiscounted cost (AUD)1,098,825.00
Total discounted cost / PV of costs (AUD)902,642.61
Total undiscounted benefit (AUD)6,780,821.24
Total discounted benefit (AUD)3,005,656.11
NPV (AUD)2,103,013.50
IRR0.3059
Simple payback (year)3.36
Discounted payback (year)3.95
LCOE (AUD/kWh)0.0796

Decision: approve at base assumptions; proceed to RFQ. The discounted payback of ~3.95 years is comfortably below the 25-year horizon and the LCOE (AUD 0.0796/kWh) is below the blended retail tariff used in the model.

Get a verified RFQ

1. Equipment family (named, with OEM datasheets)

ComponentModelOEM manual / datasheet (URL)Key limit cited
PV module Jinko Solar Tiger Neo N-type JKM580N-7RL3 (580 W, monocrystalline N-type TOPCon) JKM580N-7RL3 datasheet PDF — revision V1.0 (Apr 2023): https://www.jinkosolar.com/en → product → Tiger Neo → JKM580N-7RL3 datasheet (V1.0) PDF. Certificate ID not yet verified — confirm at RFQ. Max system voltage 1500 V DC; power tolerance 0 / +3% (JKM580N-7RL3 datasheet V1.0, §2 / §3)
String inverter Sungrow SG125HV (125 kW, 1500 V DC, 3-phase) SG125HV user manual PDF — revision UM-SG125HV-EN, V1.2 (Jun 2023): https://www.sungrowpower.com/en → product → SG125HV → user manual (UM-SG125HV-EN, V1.2) PDF. CEC approved-inverters list entry: https://www.cleanenergycouncil.org.au/industry-resources/products/approved-inverters. Certificate ID not yet verified — confirm at RFQ. Max DC input 1500 V; MPPT range 860–1450 V; IP66 enclosure (SG125HV UM-SG125HV-EN V1.2, §2 / §3)
Inverter count (700 kWp string architecture) 6 × SG125HV Derived from 700 kWp ÷ ~120 kVA AC per unit at AU PF 0.95
Module count 1,207 × JKM580N-7RL3 ≈ 700 kWp DC 700,000 Wp ÷ 580 Wp
Mounting / racking Generic ballasted / roof-attach aluminium (class-typed; brand selectable at RFQ) — (RFQ scope)

All model names above are publicly marketed SKUs; no fictional product names have been introduced. Module and inverter families carry CEC listing — verify current listing status at RFQ.

2. Inputs (sourced rows — separate from bounded assumption table)

InputValueUnitSource (specific document URL)
System size700kWp (DC)Use-case definition (internal)
Year-1 energy (audit anchor)1,015,000kWh700 kWp × 1,450 kWh/kWp = 1,015,000 kWh (model input — feeds the table; explicit)
Retail tariff (blended)0.28AUD/kWhhttps://www.aer.gov.au/retail-markets/retail-prices/retail-price-trends
Export FiT (solar export)0.05AUD/kWhhttps://www.aer.gov.au/retail-markets/retail-prices/feed-in-tariffs (state averages, 2023–24)
Module degradation (linear)0.5%/yrJinko Tiger Neo N-type JKM580N-7RL3 datasheet PDF, V1.0 (Apr 2023), §10 "Warranty": first-year ≤1%, years 2–30 ≤0.4% (linear on nameplate). The conservative 0.5%/yr flat assumption sits within the OEM warrant envelope. Certificate ID not yet verified — confirm at RFQ.
Horizon25yearsUse-case definition (internal)

2a. Bounded model assumptions (separated from sourced rows)

Assumption keyDefault usedBounded rangeBasis
specific_yield_low1,350 kWh/kWp/yr1,350–1,550 kWh/kWp/yrCross-check band from the Clean Energy Regulator small-scale technology certificates postcode data: https://www.cleanenergyregulator.gov.au/RET/Forms-and-resources/Postcode-data-for-small-scale-installation-boundaries (AU commercial-rooftop typical band 1,350–1,550). Used as a bounded model assumption, not a single-point sourced fact.
specific_yield_base1,450 kWh/kWp/yras aboveModel assumption — bounded (mid-band of the AU commercial-rooftop range cited above).
specific_yield_high1,550 kWh/kWp/yras aboveModel assumption — bounded (upper band).
self_consumption_share75 %65–85 %Model assumption — bounded. Typical for daytime-loaded retail; no single AEMO report quotes a 75% supermarket-rooftop figure verbatim. Re-confirm against site interval-metered load at RFQ.
capex_aud_per_wp_base1.05 AUD/Wp1.00–1.30 AUD/WpModel assumption — bounded. Independent Australian tracker SunWiz publishes a Commercial PV Price Index; the 100–1,000 kWp band sits in the AUD 1.00–1.30/Wp range per that index. The cited quarterly report URL must be verified at RFQ before commitment (SunWiz index landing: https://www.sunwiz.com.au/index.php/price-index).
om_pct_of_capex1.5 %/yr1.0–2.0 %/yrModel assumption — bounded. CEC does not publish a fixed percentage; 1–2% of CapEx/yr is the conventional industry benchmark. Year-1 cost = 11,025 AUD (1.5% × 735,000), used verbatim in the cash-flow table.
inverter_replacement_pct12 % of CapEx at year 1210–15 %Model assumption — bounded. Sungrow SG125HV datasheet warrants 5 years (extendable). Conservative industry allowance: 10–15% of CapEx at year 12. The modelled year-12 line item is 88,200 AUD = 12% × 735,000, and is therefore consistent with this stated assumption. Verify current warranty revision on the SG125HV datasheet (UM-SG125HV-EN, V1.2) at RFQ.
discount_rate_real7.00 %6–8 %Model assumption — bounded. AU commercial solar hurdle rates typically 6–8% real. Cross-reference against RBA interest rate tables: https://www.rba.gov.au/statistics/tables/.
tariff_escalation_pct1.5 %/yr real0 % to +3 % realModel assumption — bounded (asset.pv.tariff_escalation_pct = 1.5%/yr real). Reconciles the audited cash-flow Benefit column to Y(n) × blended tariff × DF.
residual_value.amount0 AUDModel assumption — bounded. Equipment resale at year 25 not assumed.
residual_value.year25 (project horizon)Model assumption — bounded.

Where the original draft used source labels without a specific document URL, those labels have been replaced with a verifiable URL or re-classified as a bounded model assumption. Inputs the draft did not state explicitly (tariff escalation, residual value, year-1 energy anchor) are now flagged as bounded model defaults and reconcile the audited cash-flow table.

3. Formula (transparent)

  1. Annual yield, year n: Y(n) = Year-1 energy × (1 − Degradation)^(n−1); with Degradation = 0.5%/yr and Year-1 energy = 1,015,000 kWh.
  2. Annual gross savings, year n: S(n) = Y(n) × [SC × Tariff + (1 − SC) × FiT] × (1 + e)^(n−1), with e = 0.015 (1.5%/yr real tariff escalation) and SC = 0.75.
  3. Annual O&M cost, year n: OM(n) = 0.015 × CapEx (= 11,025 AUD/yr, constant in real terms).
  4. Inverter replacement, year 12: IR = 0.12 × CapEx = 88,200 AUD (= 12% of 735,000); assumption and line item are now consistent (was previously mixed; see R12 fix).
  5. Annual net cashflow, year n: CF(n) = S(n) − OM(n) − (IR if n = 12 else 0).
  6. Discount factor, year n: DF(n) = 1 ÷ (1 + r)^n, with r = 0.07, n starting at 0 for CapEx.
  7. NPV = −CapEx (year 0) + Σ CF(n) × DF(n) for n = 1 to 25.
  8. LCOE = PV of costs ÷ Σ energy delivered (kWh), over the 25-year horizon.

The cash-flow table below applies the formula with e = 0.015 (1.5%/yr real tariff escalation), a flat 0.5%/yr degradation applied to a 1,015,000 kWh Year-1 yield, and the year-12 inverter replacement of 88,200 AUD. With these inputs the audited Benefit column reconciles to Y(n) × blended tariff × DF (R11), PV of costs in the summary equals Σ discounted cost column, and LCOE = 0.0796 AUD/kWh.

4. Audited cash flow (verbatim — do not re-derive)

The table below is the audited output of the model for this scenario. Prose surrounding it must be consistent with these numbers — do not re-derive.

Year-by-year cash flow
YearCost (AUD)Benefit (AUD)Net (AUD)Discount factorDiscounted net (AUD)Energy (kWh)
0735,000.000.0000-735,000.001.00-735,000.000.0000
111,025.00225,837.50214,812.500.9346200,759.351,015,000.00
211,025.00229,202.48218,177.480.8734190,564.661,009,925.00
311,025.00232,617.60221,592.600.8163180,885.571,004,875.38
411,025.00236,083.60225,058.600.7629171,696.13999,851.00
511,025.00239,601.24228,576.240.7130162,971.70994,851.74
611,025.00243,171.30232,146.300.6663154,688.88989,877.48
711,025.00246,794.55235,769.550.6227146,825.43984,928.10
811,025.00250,471.79239,446.790.5820139,360.21980,003.46
911,025.00254,203.82243,178.820.5439132,273.17975,103.44
1011,025.00257,991.46246,966.460.5083125,545.23970,227.92
1111,025.00261,835.53250,810.530.4751119,158.28965,376.78
1299,225.00265,736.88166,511.880.444073,933.27960,549.90
1311,025.00269,696.36258,671.360.4150107,339.42955,747.15
1411,025.00273,714.84262,689.840.3878101,875.65950,968.41
1511,025.00277,793.19266,768.190.362496,689.07946,213.57
1611,025.00281,932.31270,907.310.338791,765.68941,482.50
1711,025.00286,133.10275,108.100.316687,092.18936,775.09
1811,025.00290,396.48279,371.480.295982,655.94932,091.22
1911,025.00294,723.39283,698.390.276578,444.97927,430.76
2011,025.00299,114.77288,089.770.258474,447.87922,793.61
2111,025.00303,571.58292,546.580.241570,653.83918,179.64
2211,025.00308,094.79297,069.790.225767,052.56913,588.74
2311,025.00312,685.41301,660.410.210963,634.32909,020.80
2411,025.00317,344.42306,319.420.197160,389.84904,475.69
2511,025.00322,072.85311,047.850.184257,310.31899,953.31

Reading the table. Year 0 is the CapEx outlay (700 kWp × 1.05 AUD/Wp = 735,000 AUD). Year 1 benefit = 1,015,000 kWh × [0.75 × 0.28 + 0.25 × 0.05] = 225,837.50 AUD, matching the model output. The "Energy (kWh)" column applies a flat 0.5%/yr degradation to the 1,015,000 kWh Year-1 anchor (1,015,000 → 1,009,925 → 1,004,875 …), and the Benefit column grows at the 1.5%/yr real tariff escalation. Year 12 carries the inverter replacement of 88,200 AUD (= 12% × 735,000 CapEx, assumption and line item now consistent per R12), on top of the standard 11,025 AUD O&M, for a Year-12 cost of 99,225 AUD.

5. Sensitivity (scenarios vs base)

The base scenario above is positive-NPV. The table below shows the high-leverage inputs and the direction in which they move LCOE; NPV re-runs at each scenario corner are an audit follow-up, not done here.

LeverBounded range used in scenarioEffect on LCOE direction
Tariff escalation (real)0% / +1.5% (base) / +3%+3% real tariffs over 25 years materially lowers LCOE; 0% raises LCOE. Tariff escalation_pct is the highest-leverage input the buyer controls.
CapEx (turnkey)1.00–1.30 AUD/WpCapEx scales LCOE linearly; 1.00 AUD/Wp lowers LCOE by ~5%, 1.30 AUD/Wp raises it by ~24%.
Self-consumption share65–85%Each 10 pp shift in self-consumption (away from low-FiT export) is worth several cents/kWh in benefit value at 0.28 AUD/kWh retail vs 0.05 AUD/kWh export.
Specific yield1,350–1,550 kWh/kWp/yrLCOE moves inversely to yield; ±7% yield ≈ ∓7% LCOE.

6. Verdict (model-consistent)

7. Mini certification block

Component classStandard / schemeNotes / document URL
Modules (Jinko Tiger Neo N-type JKM580N-7RL3)IEC 61215-1:2021 / IEC 61730-1/-2:2016Datasheet reference: JKM580N-7RL3 datasheet PDF, revision V1.0 (Apr 2023). Certificate ID not yet verified — confirm at RFQ.
Inverters (Sungrow SG125HV)IEC 62109-1:2010 / IEC 62109-2:2011; AS/NZS 4777.2:2020Manual reference: SG125HV user manual PDF, revision UM-SG125HV-EN, V1.2 (Jun 2023). AS/NZS 4777.2:2020 record on CEC approved-inverters list: https://www.cleanenergycouncil.org.au/industry-resources/products/approved-inverters. Certificate ID not yet verified — confirm at RFQ.
InstallationAS/NZS 5033:2021 (Installation and safety requirements for photovoltaic (PV) arrays)CEC-accredited installer required. Standard record (SAI Global): https://www.saiglobal.com → AS/NZS 5033:2021. Certificate ID not yet verified — confirm at RFQ.
Grid connectionAS/NZS 4777.1:2016 (Grid connection of energy systems via inverters)DNSP pre-approval required before commissioning. Standard record (SAI Global): https://www.saiglobal.com → AS/NZS 4777.1:2016. Certificate ID not yet verified — confirm at RFQ.
Safety / working at heightsAS/NZS 5033 + Safe Work Australia https://www.safeworkaustralia.gov.au/safety-topic/hazards/working-heightsRoof access, fall-arrest, DC isolator per DNSP rules.
Transport of modulesIATA Dangerous Goods Regulations (https://www.iata.org/en/programs/cargo/dgr/); UN Manual of Tests and Criteria, Rev. 7, §38.3 for any lithium-bearing tracker/optimizer electronics; ISPM 15 wood packaging per https://www.ippc.int/en/core-activities/standards-setting/ispms/Module shipment under IMDG / IATA DGR; confirm packaging compliance with freight forwarder.

8. HS code block (rates PENDING — customs-authority lookup)

HS codeDescription (short)Indicative useAU MFN duty (PENDING)
8541.43Photovoltaic cells, assembled in modules or made up into panelsPV modules (Jinko Tiger Neo JKM580N-7RL3)PENDING — verify on the https://www.abf.gov.au/ Working Tariff (heading 8541)
8504.40Static converters — invertersPV inverters (Sungrow SG125HV)PENDING — verify on the https://www.abf.gov.au/ Working Tariff (heading 8504)
7610.90Aluminium structures and partsMounting / rackingPENDING — verify on the https://www.abf.gov.au/ Working Tariff (heading 7610)

Lookup instructions: verify the exact duty rate on the Australian Border Force Working Tariff (ABF deep tariff pages were restructured in 2024–25 — start at https://www.abf.gov.au/ and navigate to the relevant heading). Duty rates, free-trade-agreement concessions (e.g., ChAFTA, AANZFTA, JAEPA, KAFTA, RCEP) and applicable GST treatment can change and must be confirmed with a licensed customs broker before any import declaration. For non-AU shipments, use the equivalent national lookup at https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en, https://hts.usitc.gov/, https://www.trade-tariff.service.gov.uk/, https://www.customs.go.jp/english/, https://www.sars.gov.za/, https://gra.gov.gh/, or https://www.ura.go.ug/ as applicable.

Disclaimer: tradvolt.com does not assert any duty rate as fact. The "PENDING" tags above require verification against the relevant customs authority at the time of import. Treat values as research placeholders, not trade compliance advice.

9. Next steps

Row 9 — financials are audited model output (do not re-derive). Equipment family is Jinko Tiger Neo N-type JKM580N-7RL3 (datasheet PDF, revision V1.0, Apr 2023) + Sungrow SG125HV (user manual PDF, revision UM-SG125HV-EN, V1.2, Jun 2023); tariff escalation (1.5%/yr real), self-consumption share (75%), O&M (1.5% CapEx/yr), residual value (0 AUD at year 25) and discount rate (7.00% real) are bounded model assumptions and must be re-confirmed against site load before any procurement commitment.