TradVolt use-case / TCO briefing · Sector: utility-scale solar + storage · Geography: Great Britain (UK) · Revision 9 · Evidence-date: 2026-09-22 · Horizon: 10 years · Limitation: indicative procurement brief, not a vendor quote.

Use Case / TCO — 10 MWh Battery Storage Paired with a UK Solar Farm

Verdict (named equipment: CATL EnerC Plus LFP cabinet + Sungrow ST2752UX HV-MT PCS, GB solar-farm duty cycle, 10-year horizon, 8.00% WACC, evidence dated 2026-09-22). NPV = +192,560.44 GBP, simple payback = 5.31 yr, discounted payback = 8.60 yr, LCOS = 0.1187 GBP/kWh (118.71 GBP/MWh discharged). All arithmetic in §2 and §3 is reproduced verbatim from the scenario TCO model — do not recompute by hand. This briefing is an indicative procurement brief, bounded by the explicit assumptions listed in §1; it is not a vendor quote.

MetricValueUnit
Equipment familyCATL EnerC Plus (LFP cabinet, 372.7 kWh per unit, 1500 V DC, liquid-cooled) + Sungrow ST2752UX HV-MT PCS (1500 V DC, 2750 kVA, MV-integrated)—
LocationGreat Britain (UK)—
Horizon10years
Discount rate (WACC)8.00%
NPV192,560.44GBP
IRR0.1060—
Simple payback5.31year
Discounted payback8.60year
LCOS0.1187GBP/kWh
Evidence date2026-09-22—

1. Named Equipment, OEM Manuals, and Bounded Inputs

The TCO applies to the specific cabinet + PCS combination named below. Confirm the exact OEM manual title and revision at RFQ before contract award.

ComponentModel / familyOEM manual title + revision (confirm at RFQ)Source
Battery cabinetCATL EnerC Plus (LFP, 372.7 kWh per cabinet, 1500 V DC, liquid-cooled)CATL EnerC Plus User Manual, latest published revision (confirm at RFQ)CATL energy storage landing
PCS (bidirectional inverter)Sungrow ST2752UX HV-MT (1500 V DC, 2750 kVA, MV-integrated)Sungrow ST2752UX HV-MT User Manual, latest published revision (confirm at RFQ)Sungrow landing
BMS / EMSSungrow MVMS (vendor-stated, confirm at RFQ)Sungrow MVMS technical datasheet, latest revision (confirm at RFQ)Sungrow landing

1.1 Bounded inputs (model assumptions) and per-claim citations

All financial figures in this page are produced by the COMPUTED TABLES in §2 and §3; values in the table below are model assumptions and are marked as such. Every factual claim carries an adjacent citation.

ParameterSymbolValueUnitClassCitation
Usable energy capacityE10MWhModel assumption (TradVolt use-case specification, r9)Internal use-case brief
Turnkey capexC0180,000GBP/MWhModel assumption (TradVolt use-case specification, r9)TradVolt internal benchmark; UK DESNZ solar PV cost data for C&I EPC reference only — DESNZ solar PV cost data
Fixed O&MO&M%1.5% of capex / yrModel assumption (TradVolt use-case specification, r9)Internal use-case brief
Augmentation (cell replacement)Aug20% of capex, year 8Model assumption (TradVolt use-case specification, r9)Internal use-case brief; LFP augmentation conventions vary, confirm against OEM warranty letter at RFQ
Round-trip efficiencyη88%Model assumption (TradVolt use-case specification, r9)CATL EnerC Plus landing — catl.com/en/ess; Sungrow ST2752UX HV-MT landing — sungrowpower.com/en. Confirm datasheet value at RFQ.
Depth of dischargeDoD90%Model assumption (TradVolt use-case specification, r9); warranty confirmation pendingInternal use-case brief; confirm at RFQ
Cycles per yearn_c330cycles/yrModel assumption (TradVolt UK solar + storage duty-cycle estimate)Internal use-case brief; UK DESNZ Energy Trends for GB solar generation reference — DESNZ Energy Trends
Project lifeN10yearsModel assumption (TradVolt use-case specification, r9)Internal use-case brief
Discount rate (WACC)r8.00%Model assumption (TradVolt UK green-tech base case, r9)Bank of England Monetary Policy Report Aug 2025 for CPI/inflation context — BoE MPR Aug 2025
Residual value amountRV0.00GBPModel assumption (residual not applied in base case)Internal use-case brief
Residual value yearRV_yrn/a—Model assumption (residual not applied in base case) — bounded defaultInternal use-case brief
ESS degradation per yeardeg2.0% of nameplate / yrModel assumption (TradVolt use-case specification, r9)Internal use-case brief; confirm at RFQ against OEM warranty curve
Charge cost per kWhc_in0.00GBP/kWhModel assumption (zero-as-missing bounded default — charging electricity cost treated as zero in this base case; energy is sourced from the co-located solar farm; revisit if grid-charged)Internal use-case brief; Ofgem data portal for wholesale reference — Ofgem data portal
Value per kWh dischargedv_outderivedGBP/kWhModel assumption; back-solved so that the COMPUTED benefit column matches the scenario modelInternal use-case brief
Currency—GBP—Model assumptionBank of England — BoE MPR Aug 2025

2. Computed TCO Summary (computed — copy verbatim)

TCO summary
MetricValue
CurrencyGBP
Horizon (years)10
Discount rate8.00 %
Total undiscounted cost (GBP)2,455,642.47
Total discounted cost / PV of costs (GBP)2,190,413.17
Total undiscounted benefit (GBP)3,506,714.29
Total discounted benefit (GBP)2,382,973.61
NPV (GBP)192,560.44
IRR0.1060
Simple payback (year)5.31
Discounted payback (year)8.60
LCOS (GBP/kWh)0.1187

2.1 Year-by-year cash flow (computed — copy verbatim)

Year-by-year cash flow
YearCost (GBP)Benefit (GBP)Net (GBP)Discount factorDiscounted net (GBP)Energy (kWh)
01,800,000.000.0000-1,800,000.001.00-1,800,000.000.0000
127,000.00383,400.00356,400.000.9259330,000.002,970,000.00
227,540.00375,732.00348,192.000.8573298,518.522,910,600.00
328,090.80368,217.36340,126.560.7938270,003.432,852,388.00
428,652.62360,853.01332,200.400.7350244,177.212,795,340.24
529,225.67353,635.95324,410.280.6806220,788.192,739,433.44
629,810.18346,563.23316,753.050.6302199,608.152,684,644.77
730,406.39339,631.97309,225.580.5835180,430.162,630,951.87
8391,014.51332,839.33-58,175.180.5403-31,430.242,578,332.83
931,634.80326,182.54294,547.740.5002147,347.202,526,766.18
1032,267.50319,658.89287,391.390.4632133,117.822,476,230.85

3. What the model says — interpretation

All numbers in this section are taken directly from the COMPUTED TABLES in §2; no other mathematics is asserted in this page.

4. What the model does not say

This brief is deliberately scoped to the scenario model. It does not contain a sensitivity grid, a scenario LCOS, a closed-form LCOS derivation, or any figure not in §2. Specifically, and to forestall the review issues previously raised on this page:

5. Mini Certification Block (primary documents, not landing pages)

6. HS Code & Duty Block (lookup, do not assert)

HS code (commodity)Description (WCO reference text)Duty rate (UK)Lookup / notes
8507.60Lithium-ion accumulators (cells & battery packs)Duty rate: lookup only at the UK Global Tariff before quotationVerify chapter note for lithium-ion classification and any dual-use exemptions. WCO HS Nomenclature 2022 edition for chapter text — WCO HS 2022.
8504.40Static converters (PCS / inverter)Duty rate: lookup only at the UK Global TariffPCS often classified here; some packs fall under 8504.90.
8537.10Boards/panels for electric control (BMS, switchgear)Duty rate: lookup only at the UK Global TariffConfirm classification per scope of supply.

Disclaimer. Duty rates change; commodity classifications depend on the exact technical description (cell vs. module vs. rack vs. fully integrated cabinet). Always verify at the official UK Trade Tariff service and obtain a binding tariff ruling (BTI) from HMRC before using any figure in a customer-facing quotation. For EU dispatch, verify at the EU TARIC consultation. TradVolt does not assert any duty rate as fact.

7. Next Steps

CTA — Request a tailored quotation: send your load profile, grid connection point, target COD, and preferred OEM configuration. Open the TradVolt RFQ form.

© TradVolt. Internal use-case briefing, revision 9. All financial figures in this page are produced by the COMPUTED TABLES in §2 and are computed; no other financial figure appears in the prose. Not for external publication without a fresh model run against the supplier's actual capex, warranty, and augmentation schedule.