Use-Case TCO: 3 MWh BESS at a Freight Terminal — India

Verdict at base case (USD): NPV = −997,885 USD over a 15-year horizon (11.00 % discount). Discounted payback: none. Simple payback: none. LCOS = 0.2952 USD/kWh. Equipment: 3 MWh / 3 MW class BESS using CATL LFP cells in a Sungrow ST3725K-HD liquid-cooled cabinet architecture with Sungrow SC3150UD PCS and a Sungrow EMS, deployed at an Indian freight terminal. Location: India (CBIC customs territory). Horizon: 15 years. Discount rate: 11.00 %/yr (after-tax WACC proxy). Evidence date: 2026-09-22. Limitation: figures below are reproduced verbatim from the COMPUTED TABLES — do not re-derive; every prose figure traces to a table cell.

Verdict summary
ItemValue
NPV (15 yr, 11.00 %)−997,885 USD
PV of costs1,711,028 USD
PV of benefits713,143 USD
Simple payback— (not reached)
Discounted payback— (not reached)
IRRn/a
LCOS0.2952 USD/kWh
Horizon15 yr
Discount rate11.00 %/yr
CurrencyUSD

1. Equipment & Scope

The modelled BESS is sized at 3 MWh usable / 3 MW class and built from named, publicly marketed products whose datasheets are cited verbatim below. The stack is:

Application: peak-shaving of crane / RTG / reefer-plug load under the local DISCOM ToU tariff, ride-through during grid outages that would otherwise stall container handling, and standby frequency-response duty subject to the relevant State Load Despatch Centre (SLDC) programme. Indian customs territory is in scope; HS codes and duties below must be re-checked against the CBIC portal at the time of shipment.

2. COMPUTED TABLES (computed)

The tables in this section are the only mathematics on this page. Every figure in the prose traces to a cell of these tables. Do not re-derive; do not round differently.

TCO summary
MetricValue
CurrencyUSD
Horizon (years)15
Discount rate11.00 %
Total undiscounted cost (USD)2,039,101.88
Total discounted cost / PV of costs (USD)1,711,027.57
Total undiscounted benefit (USD)1,433,056.20
Total discounted benefit (USD)713,142.53
NPV (USD)-997,885.04
IRRn/a
Simple payback (year)—
Discounted payback (year)—
LCOS (USD/kWh)0.2952
Year-by-year cash flow
YearCost (USD)Benefit (USD)Net (USD)Discount factorDiscounted net (USD)Energy (kWh)
01,500,000.000.0000-1,500,000.001.00-1,500,000.000.0000
122,500.00109,631.7487,131.740.900978,497.06891,000.00
222,950.00107,439.1084,489.100.811668,573.25873,180.00
323,409.00105,290.3281,881.320.731259,870.92855,716.40
423,877.18103,184.5279,307.340.658752,242.20838,602.07
524,354.72101,120.8376,766.100.593545,556.95821,830.03
624,841.8299,098.4174,256.590.534639,700.61805,393.43
725,338.6597,116.4471,777.790.481734,572.37789,285.56
825,845.4395,174.1169,328.680.433930,083.55773,499.85
926,362.3493,270.6366,908.290.390926,156.11758,029.85
1026,889.5891,405.2264,515.630.352222,721.41742,869.26
1127,427.3789,577.1162,149.740.317319,719.07728,011.87
1227,975.9287,785.5759,809.650.285817,096.04713,451.63
1328,535.4486,029.8657,494.420.257514,805.63699,182.60
1429,106.1584,309.2655,203.110.232012,806.84685,198.95
15179,688.2782,623.08-97,065.200.2090-20,287.05671,494.97

Reading the cashflow table directly against the summary table: PV of costs = 1,711,027.57 USD; PV of benefits = 713,142.53 USD; NPV = −997,885.04 USD; LCOS = 0.2952 USD/kWh. Both simple payback and discounted payback are not reached within the 15-year horizon, hence "—"; IRR is undefined (PV of benefits never exceeds PV of costs in the table), hence "n/a".

3. Inputs and Their Sources

Each row below maps to a cashflow or summary figure above. Where a value is a model assumption (i.e. not stated in the cited source but bounded for the run), the row is so labelled and the bounded value is given.

Line itemValueUnitSource
Usable energy3,000kWhModel assumption — sized to 3 MWh / 3 MW class block (single Sungrow ST3725K-HD string at nameplate)
Round-trip efficiency (AC-AC, modelled)92%Model assumption — typical Sungrow SC3150UD + CATL LFP AC-AC RTE band; not a quoted figure from a single source
Equivalent full cycles, Year 1330cycles/yrModel assumption — peak-shave + ride-through duty on a 3-shift freight terminal
Asset usable fraction (DoD-limited usable energy)95%Model assumption — bounded DoD band consistent with CATL LFP operating-window guidance (CATL ESS product page)
Asset degradation2.0%/yr (of initial usable energy)Model assumption — bounded band consistent with CATL LFP calendar/cycle fade curves (CATL ESS product page)
Charge cost (grid electricity to charge the BESS)0.07USD/kWhModel assumption — industrial ToU average for Indian DISCOM HT consumers; recompute against CEA/SLDC tariff order at RFQ
OPEX escalation2.0%/yrModel assumption
Residual value (terminal year)0USDModel assumption (no salvage credited)
Project horizon15yearsModel assumption — bounded to a single augmentation cycle of an LFP stack at the modelled cycle count
Discount rate11.00%/yrModel assumption — after-tax WACC proxy for an Indian IPP/developer
Turnkey CAPEX (3 MWh / 3 MW class, India-delivered)1,500,000USDModel assumption — bounded to recent India-port microgrid award band; bind via RFQ
Annual fixed OPEX (% of CAPEX)1.5%/yrModel assumption — bounded O&M band
Augmentation allowance (year 15)150,000USD (capped)Model assumption — equals Year-15 OPEX spike in cashflow (179,688.27 − 29,106.15 ≈ 150,000)
Peak-shave value (avoided ToU demand + energy)0.18USD/kWh deliveredModel assumption — ToU differential band for Indian HT industrial; confirm against the operator's DISCOM tariff order at RFQ
Outage ride-through value0.03USD/kWh deliveredModel assumption — operator downtime-cost band

4. Standards & Certification Block

Certification status is project-specific; confirm with the EPC's design basis at RFQ stage. Standard URLs above are the verified public catalogue / product pages; deep publication IDs beyond the allow-listed set are not cited to avoid 404 risk.

5. HS Code & Customs Duty (India)

Indian customs territory. Confirm each row against the latest Indian Customs ITC (HS) schedule and the relevant Customs Duty Notification on the CBIC portal (cbic.gov.in) at the time of import. Cells vs assembled modules must be distinguished per CBIC circulars; misclassification is a common cause of port delay. Project Imports: examine Notification 25/2005-Customs (as amended) for project-import eligibility.

HS code (India, ITC-HS)Likely descriptionBCDIGSTSWSSource
8507.60.00Lithium-ion accumulators (cells/modules)PENDINGPENDINGPENDINGCBIC ITC-HS (latest schedule) and applicable CBIC BCD/IGST/SWS notification — verify at time of import
8504.40.90 / 8504.40.40Static converters (PCS) for BESSPENDINGPENDINGPENDINGCBIC ITC-HS and CBIC notification — verify at time of import
8537.10.00Boards/panels for BESS controlPENDINGPENDINGPENDINGCBIC ITC-HS and CBIC notification — verify at time of import
8501.52 / 8501.53 (if MV transformer bundled)MV transformer for skidPENDINGPENDINGPENDINGCBIC ITC-HS and CBIC notification — verify at time of import

Disclaimer: Duty rates marked PENDING must be confirmed against the current CBIC notification at the time of shipment. tradvolt.com does not assert any duty rate as fact; the figures above are placeholders pending verification by a licensed customs broker. Cross-reference lookups are supported by the EU TARIC, USITC HTS, UK Global Tariff and equivalent national portals listed in §7 for non-India destinations.

6. Verdict — Aligned to the Computed Tables

Direct reading of the COMPUTED TABLES in §2:

Implication for the freight-terminal buyer: at the modelled CAPEX, cycle count, tariff value and discount rate, the BESS does not recover its PV cost within the 15-year horizon. The Year-15 line shows a negative undiscounted net (−97,065.20 USD) and a negative discounted net (−20,287.05 USD), driven by the modelled end-of-horizon augmentation accrual. To flip the verdict at this horizon, the binding EPC price, ToU tariff schedule and confirmed cycle count must each be re-tendered; the computed tables above are the baseline against which those binding inputs are compared. A binding offer requires a site-specific survey, a tendered EPC price, and a confirmed ToU tariff schedule from the terminal operator.

7. References (URLs only — no methodology)

Allow-listed references used or pointed to on this page. Deep /publication IDs beyond the allow-listed set are not cited.

8. Call to Action

Request a binding RFQ for a 3 MWh freight-terminal BESS — India

Figures above are reproduced verbatim from the COMPUTED TABLES in §2; they are not re-derived on this page. A binding offer requires a site-specific survey, a tendered EPC price, and a confirmed ToU tariff schedule from the terminal operator. Compare binding inputs against the computed tables before any investment decision.