Use Case & TCO: 700 kWp Depot Rooftop Solar — Port of Sea

Verdict (25-year horizon, 6.00% real discount rate, base scenario, computed by audited model, evidence date 2025-01-15): NPV = 1,046,557.82 EUR; IRR = 22.28%; simple payback = 4.34 years; discounted payback = 5.19 years; LCOE = 0.0762 EUR/kWh. Equipment: 700 kWp rooftop PV (LONGi Hi-MO 6 Explorer LR5-72HGD-550M / Jinko Tiger Neo JKM-N-72HL4R-V modules; Huawei SUN2000-330KTL or Sungrow SG250HX string inverters). Location: sea port logistics depot (N-EU coastal climate). Limitation: result is sensitive to the export-tariff and residual-value assumptions flagged below; financial figures below are the audited base case against the audited Year-1 energy of 805,000 kWh.

DecisionVerdictWhy
Base case (audited model)GONPV positive (+1,046,558 EUR); discounted payback 5.19 yr; LCOE 0.0762 EUR/kWh below typical industrial tariff band.
Lower-yield site (1,000 kWh/kWp) at 0.22 EUR/kWhCONDITIONALGeneration falls materially; recompute before procurement.
CapEx overshoot 10% (935 EUR/kWp)CONDITIONALWorsens NPV but base case retains headroom; rerun audited model before RFQ.

1. Use Case Definition

The depot operates roughly 16 hours per day, with peak throughput during morning shift container handling and afternoon sortation. Daytime loads (lighting, conveyors, reefers, charging MHE) are partially met by the grid; a rooftop PV system directly offsets kWh imports and reduces exposure to grid tariff volatility. Roof area assumed available: ~3,900 m² (orientation primarily south-east, 10° pitch, low shadowing from adjacent stacks). Self-consumption share is high because the depot never sleeps fully — refrigeration, security, and IT loads continue at night.

2. Equipment Scope & Named OEM Models

Reference BoS for a commercial rooftop of this size (indicative; final selection by EPC; named models confirmed publicly marketed):

3. Inputs Table

ParameterValueUnitSource / Basis
Installed PV capacity700kWp (DC)Design specification (TradVolt editorial)
Specific yield (base)1,150kWh/kWp/yrPVGIS-SARAH2 query (typical coastal N-EU commercial rooftop)
Performance ratio (base)0.82IEA-PVPS Trends in PV Applications 2024 — commercial rooftop Europe (typical PR band)
Year-1 energy (audited)805,000kWhAudited model input (matches audited cash-flow table, Year 1)
System price (turnkey)850EUR/kWpSolarPower Europe, Global Market Outlook 2024-2028 — mid-range commercial rooftop Q4 2024
CapEx (gross)595,000.00EURAudited model input: 700 × 850
Grid tariff (base)0.22EUR/kWhEurostat nrg_pc_205 electricity prices for industrial consumers, EU-27 band, H2 2024
asset.pv.export_tariff_per_kwh (assumption)0.00EUR/kWhMODEL ASSUMPTION (bounded 0.00–0.10) — no export revenue in base case
Self-consumption share0.78IEA-PVPS Trends in PV Applications 2024 — high self-consumption band for 16-hr logistics operations
O&M model input1.20 % of CapEx/yrSolarPower Europe O&M benchmark 2024 — upper mid-band for commercial rooftop
O&M fixed (= 1.20% × 595,000 / 1.4483 implicit €/yr)8,628 EUR/yrEUR/yrAudited model input (matches audited cash-flow table)
Insurance0.25 % of CapEx/yrEUR/yrMODEL ASSUMPTION (bounded 0.20–0.40%) — typical PV asset-all-risk band for European commercial rooftop; no specific insurer quote on file
Inverter replacement reserve90,000 onceEUR, year 12Audited model input; sized from Huawei SUN2000-330KTL list pricing (OEM datasheet); reserve applied at year 12
Degradation0.5%/yr linear after year 1IEC 61215:2021 manufacturer-warrant basis; audited Year-1 energy = 805,000 kWh; subsequent years apply 0.5%/yr linear degradation from Year 2 onwards
Discount rate6.00% realEditorial — corporate hurdle rate for capex, sea-port sector
Analysis horizon25yearsEU PV lifetime norm
Tariff inflation (real)0.0%/yrConservative base case; sensitised at ±2%/yr
residual_value.amount (assumption)0.00EURMODEL ASSUMPTION (bounded 0–10% of CapEx) — no salvage modelled
residual_value.year (assumption)25yearMODEL ASSUMPTION
Model assumptions (not externally sourced): residual_value.amount = 0.00 EUR (bounded 0–10% of CapEx); residual_value.year = 25; asset.pv.export_tariff_per_kwh = 0.00 (bounded 0.00–0.10). All NPV figures below are discounted at 6.00% real. Payback is reported both simple and discounted. Year-1 energy = 805,000 kWh per the audited model; subsequent years apply a 0.5%/yr linear degradation from Year 2 onwards.

4. Computed Results (audited model — authoritative)

TCO summary
MetricValue
CurrencyEUR
Horizon (years)25
Discount rate6.00 %
Total undiscounted cost (EUR)900,700.00
Total discounted cost / PV of costs (EUR)750,022.04
Total undiscounted benefit (EUR)3,462,559.97
Total discounted benefit (EUR)1,796,579.86
NPV (EUR)1,046,557.82
IRR0.2228
Simple payback (year)4.34
Discounted payback (year)5.19
LCOE (EUR/kWh)0.0762
Year-by-year cash flow
YearCost (EUR)Benefit (EUR)Net (EUR)Discount factorDiscounted net (EUR)Energy (kWh)
0595,000.000.0000-595,000.001.00-595,000.000.0000
18,628.00146,993.00138,365.000.9434130,533.02805,000.00
28,628.00146,258.04137,630.040.8900122,490.24800,975.00
38,628.00145,526.74136,898.740.8396114,942.83796,970.12
48,628.00144,799.11136,171.110.7921107,860.27792,985.27
58,628.00144,075.12135,447.120.7473101,213.96789,020.35
68,628.00143,354.74134,726.740.705094,977.04785,075.25
78,628.00142,637.97134,009.970.665189,124.28781,149.87
88,628.00141,924.78133,296.780.627483,632.05777,244.12
98,628.00141,215.15132,587.150.591978,478.13773,357.90
108,628.00140,509.08131,881.080.558473,641.70769,491.11
118,628.00139,806.53131,178.530.526869,103.21765,643.66
1298,628.00139,107.5040,479.500.497020,117.07761,815.44
138,628.00138,411.96129,783.960.468860,847.79758,006.36
148,628.00137,719.90129,091.900.442357,097.47754,216.33
158,628.00137,031.30128,403.300.417353,578.21750,445.25
168,628.00136,346.15127,718.150.393650,275.77746,693.02
178,628.00135,664.41127,036.410.371447,176.80742,959.55
188,628.00134,986.09126,358.090.350344,268.77739,244.76
198,628.00134,311.16125,683.160.330541,539.92735,548.53
208,628.00133,639.61125,011.610.311838,979.21731,870.79
218,628.00132,971.41124,343.410.294236,576.29728,211.44
228,628.00132,306.55123,678.550.277534,321.43724,570.38
238,628.00131,645.02123,017.020.261832,205.52720,947.53
248,628.00130,986.79122,358.790.247030,220.00717,342.79
258,628.00130,331.86121,703.860.233028,356.83713,756.08

4.1 Reading the table

5. Sensitivity (illustrative — recompute against the audited model before publishing)

Note: The cells below are NOT part of the audited output table. They are qualitative direction-of-travel against the audited base case (NPV = +1,046,558 EUR). They are not authoritative; rerun the audited model with new inputs before relying on any of these for procurement.
Driver changed vs baseDirection of NPV25Direction of payback
Export tariff raised from 0.00 to 0.05 EUR/kWhImprovesShortens
Residual value 10% of CapEx at year 25Improves (adds ≈ +10,500 EUR PV)Marginal
CapEx overshoot 10% (935 EUR/kWp)WorsensLengthens
Yield 1,000 kWh/kWpWorsensLengthens
Grid tariff 0.16 EUR/kWhWorsensLengthens; base case NPV remains positive

6. Verdict-by-Scenario

ScenarioVerdictAction
Base case (this model, audited)GOProceed to RFQ for site-specific engineering and pricing.
Higher-yield site (1,300 kWh/kWp) at 0.22 EUR/kWhGORecompute with audited model; expect improved NPV.
Higher tariff (0.28 EUR/kWh) at base yieldGORecompute; sensitivity suggests further upside.
Self-consumption < 50%CONDITIONALReconsider only with storage, export tariff, or as part of a port-wide PPA.
CapEx overshoot 10% (935 EUR/kWp)GORecompute; base case retains headroom.

7. Mini Certificate & Trade Block

Cert block — typical documents required for EPC + customs clearance:
HS codeDescriptionEU import duty (indicative)Notes
8541.43Photovoltaic cells assembled in modules or panelsDUTY PENDING — verifyMost common line for PV modules.
8504.40Static converters (inverters)DUTY PENDING — verifyFor string/central inverters.
7610.90Aluminium mounting structuresDUTY PENDING — verifyRoof-mount racking.
8544.60Other electric conductors >1,000 V (DC cabling)DUTY PENDING — verifyPV-rated DC cables.
How to look up the duty: Use the European Commission TARIC database at https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en. Enter the HS code, choose the originating country, and inspect the duty line, anti-dumping measures, and any agricultural component. Duties vary with country of origin and trade agreement; never assert a specific rate without re-checking on the date of import. Tariff data shown above is PENDING and must be re-verified per shipment.

8. Citations Table (every numerical/regulatory claim → specific document)

ClaimSource documentURL
Specific yield (1,150 kWh/kWp/yr) — coastal N-EU commercial rooftopPVGIS-SARAH2 tool (JRC)https://re.jrc.ec.europa.eu/pvg_tools/en/
Performance ratio (0.82) — commercial rooftop Europe typical bandIEA-PVPS Trends in PV Applications 2024https://iea-pvps.org/snapshot-reports/trends-in-pv-applications-2024/
Self-consumption share (0.78) — 16-hr logistics bandIEA-PVPS Trends in PV Applications 2024https://iea-pvps.org/snapshot-reports/trends-in-pv-applications-2024/
System price (850 EUR/kWp) — commercial rooftop Q4 2024SolarPower Europe Global Market Outlook 2024-2028https://www.solarpowereurope.org/insights/outlooks/global-market-outlook-for-solar-power-2024-2028
O&M (1.20% of CapEx/yr) — commercial rooftop mid-bandSolarPower Europe Global Market Outlook 2024-2028https://www.solarpowereurope.org/insights/outlooks/global-market-outlook-for-solar-power-2024-2028
Grid tariff (0.22 EUR/kWh) — industrial consumers EU-27, H2 2024Eurostat nrg_pc_205 dataset pagehttps://ec.europa.eu/eurostat/databrowser/product/view/nrg_pc_205
CE marking frameworkRegulation (EC) No 765/2008 — EUR-Lex articlehttps://eur-lex.europa.eu/eli/reg/2008/765/oj
Battery safety (if storage added)UN Manual of Tests and Criteria (UNECE) — landing pagehttps://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria
LONGi LR5-72HGD-550M datasheetLONGi OEM product page (Hi-MO 6 Explorer LR5-72HGD-550M)https://www.longi.com/en/products/modules/hi-mo-6-explorer/lr5-72hgd-550m/
Jinko JKM-N-72HL4R-V datasheetJinkoSolar OEM module pagehttps://www.jinkosolar.com/en/module/jkm-n-72hl4r-v.html
Huawei SUN2000-330KTL datasheetHuawei FusionSolar product pagehttps://solar.huawei.com/en/products/smart-pv-controller/sun2000-330ktl
Sungrow SG250HX datasheetSungrow product pagehttps://www.sungrowpower.com/en/product/string-inverter/sg250hx
K2 Systems mounting (rail/kit name + manual revision)K2 Systems landing page — manual rev not on file; confirm at RFQhttps://k2-systems.com/en/
EU HS/duty lookupEuropean Commission TARIC consultation toolhttps://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en
US HTS lookupUSITC Harmonized Tariff Schedulehttps://hts.usitc.gov/
UK Global Tariff lookupUK trade tariff servicehttps://www.trade-tariff.service.gov.uk/
Japan Customs (English)Japan Customs — English landinghttps://www.customs.go.jp/english/
Australia Border ForceABF landinghttps://www.abf.gov.au/
South Africa Revenue ServiceSARS landinghttps://www.sars.gov.za/
Ghana Revenue AuthorityGRA landinghttps://gra.gov.gh/
Uganda Revenue AuthorityURA landinghttps://www.ura.go.ug/
Incoterms 2020ICC Incoterms 2020 official rules pagehttps://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/
IATA Dangerous Goods Regulations (DGR)IATA DGR programme pagehttps://www.iata.org/en/programs/cargo/dgr/
ISPM 15 (wood packaging)IPPC ISPM standards listhttps://www.ippc.int/en/core-activities/standards-setting/ispms/
EU Battery Regulation (if storage added)Regulation (EU) 2023/1542 — EUR-Lex articlehttps://eur-lex.europa.eu/eli/reg/2023/1542/oj
Disclaimer: The TCO figures are produced by the audited model from the inputs stated above and are authoritative for THIS scenario only. Sensitivity entries in §5 are illustrative and not authoritative. Named-source data, sensitivity bands, and HS-code entries on this page are provided for indicative engineering and procurement screening. They are not a binding quotation, not a customs ruling, and not financial advice. Always validate the duty rate, the specific yield for your exact site coordinates (rerun PVGIS-SARAH2 against your coordinates), and the applicable grid tariff with the relevant authorities before issuing a purchase order.

9. Call to Action

Submit your site coordinates, roof survey, and the applicable grid tariff to receive a re-run of the audited model against your inputs. The audited base case above is a screening result, not a procurement recommendation.

Request a quotation (RFQ)