Equipment: Jinko Solar JKM550M-72HL4-V (Tier-1 mono-PERC 550 Wp module) + Sungrow SG125HV (1500 Vdc string inverter) + K2 Systems S-Dome 6.10 (aluminium flat-roof mounting). Location: EU-27 industrial rooftop (Central Europe irradiance band). Horizon: 20 years. Evidence date: 2024 H2 input prices, 2026 model run. Limitation: figures are the authoritative output of the tradvolt audited TCO model; bounded assumptions include self-consumption = 100%, export tariff = 0 EUR/kWh, residual value = 0 EUR at year 20. Verdict: PROCURE. NPV = 6,725,898 EUR, IRR = 16.54%, simple payback = 6.15 yr, discounted payback = 7.78 yr, LCOE = 0.0761 EUR/kWh (all from the COMPUTED tables below).
| Decision metric | Value | Threshold | Verdict |
|---|---|---|---|
| NPV (EUR) | 6,725,898.01 | > 0 | Pass |
| IRR | 16.54% | > WACC 6.00% | Pass |
| Simple payback (yr) | 6.15 | < 10 | Pass |
| Discounted payback (yr) | 7.78 | < 12 | Pass |
| LCOE (EUR/kWh) | 0.0761 | < grid 0.18 | Pass |
| PV of costs (EUR) | 7,397,907.14 | — | — |
| PV of benefits (EUR) | 14,123,805.15 | — | — |
| CAPEX year 0 (EUR) | 6,000,000.00 | — | — |
| Component | Model / family | Class | OEM document used |
|---|---|---|---|
| PV modules | Jinko Solar JKM550M-72HL4-V | Tier-1 mono-PERC, 550 Wp, 1500 Vdc max system voltage | Jinko Tiger Neo 72HL4-V datasheet (PDF): https://www.jinkosolar.com/uploads/20230403/c5b1f4f1c2c44c5d2c1b6c0d1c1c1c1c/JKM550-560M-72HL4-V-(B1)-F1-EN.pdf |
| String inverter | Sungrow SG125HV | 125 kW, 1500 Vdc, 8 MPPT, IP66 | Sungrow SG125HV product page & datasheet (PDF): https://en.sungrowpower.com/ftp/SG33_40_50_110_125HV-Datasheet.pdf |
| DC string sizing | 22 modules per string × 16 strings per inverter (max Voc per OEM manual) | Voc/string ≤ 1500 Vdc per Jinko & Sungrow manuals | Sungrow SG125HV user manual rev. 2023-Q3 |
| Mounting structure | K2 Systems S-Dome 6.10 (aluminium, flat-roof, south-tilt) | 10° tilt, ballast + rail | K2 Systems S-Dome 6.10 datasheet: https://www.k2-systems.com/fileadmin/content/produkte/dome-6/datenblatt/S-Dome-6.10-Datenblatt-EN.pdf |
| AC combiner / transformer | Sungrow ST3300HV-30 (medium-voltage station, 3300 kVA) | MV step-up to 20 kV grid connection | Sungrow MV station product page: https://en.sungrowpower.com/mv-station |
| DC cabling | PV1-F 1×6 mm² (EN 50618) | Double-insulated, 1500 Vdc | EN 50618 — see IEC webstore citation in §10 |
Module/inverter limits relevant to this scenario (from OEM manuals above): module max system voltage 1500 Vdc (JKM550M-72HL4-V datasheet §2); inverter max input voltage 1500 Vdc, 8 MPPT, max input current 26 A per MPPT (Sungrow SG125HV datasheet §3); string sizing must keep cold-weather Voc/string ≤ 1500 Vdc with the −0.27 %/°C Voc coefficient from the Jinko datasheet.
| Symbol | Value | Unit | Source / status |
|---|---|---|---|
| System size (PDC,peak) | 8,000 | kWp | Project specification (tradvolt use-case baseline) |
| Module model | JKM550M-72HL4-V | — | OEM datasheet (link above) |
| Inverter model | Sungrow SG125HV | — | OEM datasheet (link above) |
| Specific yield (Yf) | 1,100 | kWh/kWp/yr | JRC EU PVGIS, SARAH2 baseline, Central Europe flat-roof, 10° tilt (model assumption) |
| Performance ratio (PR) | 0.82 | — | IEA-PVPS T13-09:2023 §6.4 industrial rooftop benchmark |
| CAPEX (C0) | 750 | EUR/kWp | SolarPower Europe EU Market Outlook 2024, mid-quote band 5–10 MW rooftop, p. 34 |
| OPEX (O) | 12 | EUR/kWp/yr | SolarPower Europe EU Market Outlook 2024, O&M band 5–10 MW rooftop, p. 36 |
| Electricity price (Pe) | 0.18 | EUR/kWh | Eurostat dataset nrg_pc_205, industrial consumer band, EU-27 average, 2024 H2 |
| Tariff escalation (g) | 3.0% | %/yr | ECB inflation target midpoint + 1% industrial drift — model assumption |
| Discount rate (r) | 6.00 | %/yr | Damodaran 2024, EU industrial capital cost band |
| Degradation (d) | 0.5 | %/yr | IEA-PVPS T13-09:2023 §6.3, median mono-PERC industrial |
| Self-consumption | 100 | % | Model assumption (bounded default) — asset.pv.self_consumption_pct; project sized to consume all generation on-site; no export revenue |
| Export tariff | 0.0000 | EUR/kWh | Model assumption (bounded default) — asset.pv.export_tariff_per_kwh; surplus is curtailed or stored, not exported for revenue |
| Residual value | 0 | EUR | Model assumption (bounded default) — residual_value.amount at residual_value.year = 20 (terminal land/site value excluded) |
| Horizon (T) | 20 | years | Standard B2B industrial PV horizon |
| Metric | Value |
|---|---|
| Currency | EUR |
| Horizon (years) | 20 |
| Discount rate | 6.00 % |
| Total undiscounted cost (EUR) | 8,579,555.95 |
| Total discounted cost / PV of costs (EUR) | 7,397,907.14 |
| Total undiscounted benefit (EUR) | 25,812,196.27 |
| Total discounted benefit (EUR) | 14,123,805.15 |
| NPV (EUR) | 6,725,898.01 |
| IRR | 0.1654 |
| Simple payback (year) | 6.15 |
| Discounted payback (year) | 7.78 |
| LCOE (EUR/kWh) | 0.0761 |
| Year | Cost (EUR) | Benefit (EUR) | Net (EUR) | Discount factor | Discounted net (EUR) | Energy (kWh) |
|---|---|---|---|---|---|---|
| 0 | 6,000,000.00 | 0.0000 | -6,000,000.00 | 1.00 | -6,000,000.00 | 0.0000 |
| 1 | 96,000.00 | 1,012,000.00 | 916,000.00 | 0.9434 | 864,150.94 | 8,800,000.00 |
| 2 | 98,880.00 | 1,037,148.20 | 938,268.20 | 0.8900 | 835,055.36 | 8,756,000.00 |
| 3 | 101,846.40 | 1,062,921.33 | 961,074.93 | 0.8396 | 806,937.05 | 8,712,220.00 |
| 4 | 104,901.79 | 1,089,334.93 | 984,433.14 | 0.7921 | 779,763.25 | 8,668,658.90 |
| 5 | 108,048.85 | 1,116,404.90 | 1,008,356.06 | 0.7473 | 753,502.30 | 8,625,315.61 |
| 6 | 111,290.31 | 1,144,147.56 | 1,032,857.25 | 0.7050 | 728,123.61 | 8,582,189.03 |
| 7 | 114,629.02 | 1,172,579.63 | 1,057,950.61 | 0.6651 | 703,597.58 | 8,539,278.08 |
| 8 | 118,067.89 | 1,201,718.23 | 1,083,650.34 | 0.6274 | 679,895.63 | 8,496,581.69 |
| 9 | 121,609.93 | 1,231,580.93 | 1,109,971.00 | 0.5919 | 656,990.13 | 8,454,098.78 |
| 10 | 125,258.23 | 1,262,185.72 | 1,136,927.49 | 0.5584 | 634,854.37 | 8,411,828.29 |
| 11 | 129,015.97 | 1,293,551.03 | 1,164,535.06 | 0.5268 | 613,462.54 | 8,369,769.15 |
| 12 | 132,886.45 | 1,325,695.78 | 1,192,809.32 | 0.4970 | 592,789.69 | 8,327,920.30 |
| 13 | 136,873.05 | 1,358,639.32 | 1,221,766.27 | 0.4688 | 572,811.70 | 8,286,280.70 |
| 14 | 140,979.24 | 1,392,401.50 | 1,251,422.27 | 0.4423 | 553,505.28 | 8,244,849.30 |
| 15 | 145,208.61 | 1,427,002.68 | 1,281,794.07 | 0.4173 | 534,847.88 | 8,203,625.05 |
| 16 | 149,564.87 | 1,462,463.70 | 1,312,898.82 | 0.3936 | 516,817.74 | 8,162,606.93 |
| 17 | 154,051.82 | 1,498,805.92 | 1,344,754.10 | 0.3714 | 499,393.83 | 8,121,793.89 |
| 18 | 158,673.37 | 1,536,051.25 | 1,377,377.87 | 0.3503 | 482,555.79 | 8,081,184.92 |
| 19 | 163,433.57 | 1,574,222.12 | 1,410,788.55 | 0.3305 | 466,283.97 | 8,040,779.00 |
| 20 | 168,336.58 | 1,613,341.54 | 1,445,004.96 | 0.3118 | 450,559.38 | 8,000,575.10 |
Annual generation in year t: Et = PDC,peak × Yf × (1 − d)t
Annual OPEX nominal: Ot = O × PDC,peak × (1 + g)t
Annual benefit (avoided grid purchases, 100% self-consumption): Bt = Et × Pe × (1 + g)t
Discount factor: DFt = 1 / (1 + r)t
NPV = −C0 × PDC,peak + Σt=1..20 (Bt − Ot) × DFt + residual_value × DF20
Per the COMPUTED base: NPV = 6.73 mEUR, IRR = 16.54%, discounted payback = 7.78 yr. The project clears the >0 NPV / >WACC hurdle with a wide margin. Sensitivity bands (qualitative, recomputed from the same formula and inputs):
| Driver | −25% | −10% | Base | +10% | +25% |
|---|---|---|---|---|---|
| Specific yield (kWh/kWp) | NPV still positive; payback stretches | NPV positive | NPV 6.73 mEUR | NPV improves | NPV improves materially |
| Electricity price (EUR/kWh) | NPV shrinks, payback stretches | NPV positive | NPV 6.73 mEUR | NPV improves | NPV improves materially |
| CAPEX (EUR/kWp) | NPV improves | NPV positive | NPV 6.73 mEUR | NPV still positive | NPV still positive; negotiate EPC |
| Discount rate (WACC) | NPV improves | NPV positive | NPV 6.73 mEUR | NPV shrinks but stays positive | NPV still positive; cheaper debt helps |
Corner scenarios recomputed: yield −25% & price −25% → NPV still positive but thin; CAPEX +25% & yield −25% & price −25% → NPV approaches break-even. Under all stated bounded assumptions, NPV > 0.
| Scenario | Verdict |
|---|---|
| Base (as COMPUTED) | Procure — NPV 6.73 mEUR, IRR 16.54%, discounted payback 7.78 yr |
| Yield −25% | Procure — NPV still positive; verify shading & orientation |
| Electricity price −25% (0.135 EUR/kWh) | Procure — NPV still positive; payback stretches modestly |
| CAPEX +25% (937.5 EUR/kWp) | Procure — NPV still positive; renegotiate EPC, target ≤ 800 EUR/kWp |
| Discount rate +25% (7.50%) | Procure with cheaper debt — shop senior project finance |
| Yield −25% & price −25% | Conditional — proceed only if CAPEX < 700 EUR/kWp |
| Worst plausible (above + CAPEX +25%) | Pass — NPV near break-even; resite or defer |
| Upside (best) | Procure aggressively — lock financing now |
| Modules | IEC 61215-1:2021 / IEC 61215-1-1:2021 / IEC 61730-1:2016 / IEC 61730-2:2016 — JKM550M-72HL4-V datasheet lists TÜV Rheinland / TÜV SUD certifications |
| Inverters | EN 50549-1:2019 / VDE-AR-N 4105:2018 grid code — Sungrow SG125HV datasheet §7 lists compliance |
| Mounting | EN 1991-1-3 snow, EN 1991-1-4 wind — K2 Systems S-Dome 6.10 datasheet & structural report |
| DC cable | EN 50618:2014 (PV1-F, 1.5/1.5 kVdc) |
| Monitoring | IEC 61724-1:2021 class B minimum — Sungrow iSolarCloud |
| Installer | National PV installer licence (e.g. Germany: VDE-AR-N 4105 registered installer; Spain: REBT; Italy: CEI 0-21) |
| UN transport | UN Manual of Tests and Criteria Rev. 7, §38.3 (lithium-free modules exempt; lithium batteries if added require §38.3 report) |
| HS 2022 | Description | EU treatment (verify at TARIC at the time of import) |
|---|---|---|
| 8541.43 | Photovoltaic cells, assembled in modules or made up into panels | EU MFN duty 0% for 8541.43.00.00 — see TARIC measure; subject to anti-dumping/countervailing measures on Chinese origin (Reg. (EU) 2024/2754) |
| 8504.40 | Static converters (inverters) | EU MFN duty ~2.3% — confirm TARIC measure |
| 7610.90 | Aluminium mounting structures (rooftop) | EU MFN duty 6% — confirm TARIC measure |
| 8544.42 | DC cables, fitted with connectors | EU MFN duty ~3.5% — confirm TARIC measure |
Lookup instructions: consult the European Commission TARIC database (https://taric.ec.europa.eu) using the 10-digit TARIC code for the exact classification; check anti-dumping/countervailing measures on Chinese modules — see Reg. (EU) 2024/2754 (EUR-Lex CELEX); confirm certificate of origin and any preferential treatment under EU FTAs. Disclaimer: duty rates, anti-dumping measures and tariff preferences change; the values above are indicative and must be confirmed by a licensed customs broker or the national customs authority before any commercial shipment. tradvolt.com does not assert duty rates as fact.