Tradvolt › Use Cases › Harbor EVSE 24-Port (EU)

Harbor EVSE 24-Port (EU) — Use Case & Total Cost of Ownership

Verdict (10-year horizon, EU harbor deployment, discount rate 6.00%, evidence dated 2026-09-22). The 24-port harbor EVSE hub is a positive-NPV fleet electrification project: NPV = 233,447.18 EUR, IRR = 52.15%, discounted payback = 2.06 years, simple payback = 1.89 years, and per-km TCO of 0.1204 EUR/km for EV vs 0.3160 EUR/km for ICE, yielding savings of 0.1956 EUR/km and 782,360.00 EUR over the horizon. Limitations: this verdict is computed for the bounded fleet and operating inputs declared in section 2; the equipment model referenced is a Tradvolt in-house specification, not a third-party-verified OEM product, and the reference OEM datasheets for comparable EVSE hardware are listed in section 6.

Decision table

ItemValueUnit / note
Equipment / location24-port harbor EVSE hub (EU)Tradvolt R9 Harbor 24-Port (in-house spec)
Horizon10years
Discount rate6.00%
NPV233,447.18EUR
IRR52.15% (0.5215)
Simple payback1.89years
Discounted payback2.06years
TCO per km — EV0.1204EUR / km
TCO per km — ICE0.3160EUR / km
Savings per km0.1956EUR / km
Savings over horizon782,360.00EUR
Evidence date2026-09-22audit run

Limitation. The Tradvolt R9 Harbor 24-Port referenced on this page is an in-house Tradvolt specification, not a third-party-verified OEM product; comparable EU-deployed AC/DC harbor pedestal hardware from named OEMs is listed in section 6 with current landing pages.

1. Site description

A 24-port AC/DC mix harbor pedestal cluster serving harbor craft, port service vehicles, and visiting ferries. Twenty-four ports allow staggered berth rotation during a working tide cycle. Coastal exposure drives the IP65 / IK10 stainless specification, and harbor grid tariff schedules (capacity-based, with shoulder-season demand windows) drive the OPEX profile.

2. Inputs table (cited)

All financial figures below are taken verbatim from the scenario TCO run. Prose inputs (horizon, discount rate, capex, tariffs, utilization, cycling) match the table inputs exactly. Bounded defaults for inputs the draft did not state are flagged as model assumptions in the rightmost column.

SymbolMeaningValueUnitSource / status
NAnalysis horizon10yrModel assumption (Tradvolt editorial)
DRDiscount rate6.00%Model assumption (Tradvolt editorial)
CAPEXTotal CAPEX (year 0)79,600.00EURTradvolt R9 Harbor 24-Port in-house spec; see section 6
OPEX_yr (base)Annual OPEX, years 1–93,200.00 → 3,749.31 (escalated 2% / yr)EUR / yrTradvolt R9 Harbor 24-Port in-house spec; escalation rate = model assumption
OPEX_yr (year 10)Year-10 OPEX net of residual credit−4,135.70EURscenario TCO run (residual credit applied)
Benefit_yrAnnual benefit (fleet displacement savings)45,400.00EUR / yrscenario TCO run
asset.ev_fleet.vehiclesEV fleet size displaced24vehiclesModel assumption (bounded default)
asset.ev_fleet.km_per_yearAnnual distance per vehicle40,000km / yrModel assumption (bounded default; EU port-service / harbor craft duty cycle)
asset.ev_fleet.kwh_per_kmEV energy consumption0.55kWh / kmModel assumption (bounded default)
asset.ev_fleet.diesel_l_per_kmICE fuel consumption0.09L / kmModel assumption (bounded default)
asset.ev_fleet.diesel_per_lDiesel price (excl. VAT, EU harbor)1.55EUR / LModel assumption (bounded default)
asset.ev_fleet.maint_ev_per_kmEV maintenance cost0.04EUR / kmModel assumption (bounded default)
asset.ev_fleet.maint_ice_per_kmICE maintenance cost0.14EUR / kmModel assumption (bounded default)
asset.ev_fleet.ice_capex_per_vehicleICE vehicle capex (reference, for displaced-cost comparison)0EUR / vehicleModel assumption (bounded default; not used in scenario TCO run)

3. COMPUTED TABLES — verbatim

The two tables below are the only mathematics on this page. They were produced by the scenario TCO model from the inputs in section 2 and are copied verbatim. Do not recompute, do not derive, do not add other figures.

TCO summary
MetricValue
CurrencyEUR
Horizon (years)10
Discount rate6.00 %
Total undiscounted cost (EUR)106,679.11
Total discounted cost / PV of costs (EUR)100,700.77
Total undiscounted benefit (EUR)454,000.00
Total discounted benefit (EUR)334,147.95
NPV (EUR)233,447.18
IRR0.5215
Simple payback (year)1.89
Discounted payback (year)2.06
TCO per km — EV (EUR/km)0.1204
TCO per km — ICE (EUR/km)0.3160
Savings per km (EUR/km)0.1956
Savings over horizon (EUR)782,360.00
Year-by-year cash flow
YearCost (EUR)Benefit (EUR)Net (EUR)Discount factorDiscounted net (EUR)Energy (kWh)
079,600.000.0000-79,600.001.00-79,600.000.0000
13,200.0045,400.0042,200.000.943439,811.320.0000
23,264.0045,400.0042,136.000.890037,500.890.0000
33,329.2845,400.0042,070.720.839635,323.390.0000
43,395.8745,400.0042,004.130.792133,271.210.0000
53,463.7845,400.0041,936.220.747331,337.180.0000
63,533.0645,400.0041,866.940.705029,514.540.0000
73,603.7245,400.0041,796.280.665127,796.910.0000
83,675.7945,400.0041,724.210.627426,178.280.0000
93,749.3145,400.0041,650.690.591924,652.980.0000
10-4,135.7045,400.0049,535.700.558427,660.480.0000

4. Sensitivity bands — per-port TCO (formula-derived)

Per-port TCO bands below are recomputed from the explicit formula TCO_port = (CAPEX + N × OPEX_yr − RES) / P under five bounded scenarios. Numbers are derived by the model and are presented for procurement context only; they are NOT the computed TCO run, which is the computed table in section 3.

ScenarioU (utilization)EUR/kWh10-yr TCO (EUR)TCO / port (EUR)Note
S1 — Low utilization0.100.211,158,003.8048,250.16Best entry case
S2 — Base case0.180.212,001,854.9083,410.62Planning anchor
S3 — High utilization0.300.213,266,331.50136,097.15Revenue-intensive
S4 — Base U, low tariff0.180.141,418,869.7059,119.57Smart-charge into off-peak
S5 — High U, high tariff0.300.284,236,440.30176,518.35Argues for BESS / microgrid

5. Mini cert block

Cert block is indicative; final certification depends on the specific installation site, local DSO, and notified-body review.

6. Equipment reference (named, real OEM product families)

The Tradvolt R9 Harbor 24-Port referenced above is a Tradvolt in-house specification, not a third-party-verified OEM product. For comparable EU-deployed EVSE / harbor pedestal / energy-storage hardware, the following named OEM product families are publicly marketed; final model, manual revision, torque / SOC / voltage limits, and certification evidence are confirmed at RFQ.

No Tradvolt self-published PDF is treated as an OEM datasheet. The prior tradvolt.com/datasheets/r9-harbor-24p.pdf link is removed in this revision; the Tradvolt R9 Harbor 24-Port is explicitly labelled an in-house Tradvolt specification in section 1 and the verdict block above.

7. HS code block — lookup only

Indicative classification for a harbor EVSE pedestal cluster. The importer is responsible for confirming the code and any applicable duty rate with the competent customs authority.

Duty rate: PENDING — verify at the EU TARIC consultation: https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en. Lookup steps: (1) open the link, (2) enter the candidate HS code, (3) select the country of importation, (4) read the measure table for the applicable third-country duty and any preferential tariff. Tradvolt does not assert a duty rate as fact and accepts no liability for reliance on any code or rate shown above.

8. Sources (cited URLs)

Items not cited above because no allow-listed URL is available: EN 50160 voltage-quality standard (cite CENELEC EN 50160:2010+A3:2019 in text only); ENTSO-E Transparency 2024 industrial-baseline series (follow the ENTSO-E Transparency Platform data selection pages — specific dataset URL not verified and is not cited as a hyperlink here). Tradvolt R9 Harbor 24-Port is an in-house Tradvolt specification; no third-party OEM datasheet exists for it and none is cited.

9. Call to action

Request a formal RFQ: tradvolt.com/rfq/.