Evidence date: 2026-09-22 · Equipment: 12-port ABB Terra AC Wallbox 22 kW cluster (with OCPP 2.0.1 backend) · Location: shipyard in Middle East & Africa (MENA + Sub-Saharan anchor sites) · Horizon: 5 years · Discount rate: 9.00% · Limitation: per-port AC EVSE cluster, single shipyard operator; fleet-vs-ICE benefit is an indicative KPI, not a procurement commitment.
Base-case 5-year NPV ≈ USD 79,903; simple payback ≈ 2.40 years; discounted payback ≈ 2.83 years; IRR ≈ 30.76%; TCO per km — EV ≈ USD 0.104 vs ICE ≈ USD 0.311 (savings ≈ USD 0.207/km, ≈ USD 497,480 over the 5-year horizon). The cluster's TCO range across the stated bounded scenarios lies between roughly USD 160,000 and USD 316,000 (see sensitivity below). Proceed to standard procurement if your site-specific TCO lands inside that envelope; escalate to a hybrid energy study (PV + battery) only if the high-band scenario is triggered at your specific tariff and utilization.
| Indicator | Value | Read |
|---|---|---|
| NPV (USD) | 79,903.13 | Positive vs. ICE baseline at 9.0% discount |
| Simple payback (year) | 2.40 | Inside typical 3-year capex comfort band |
| Discounted payback (year) | 2.83 | Inside 3-year band at 9.0% WACC |
| IRR | 0.3076 (30.76%) | Above 9.0% hurdle; cluster is self-funding |
| TCO per km — EV (USD/km) | 0.1035 | Lifetime weighted, 5-year horizon |
| TCO per km — ICE (USD/km) | 0.3108 | Lifetime weighted, 5-year horizon |
| Savings per km (USD/km) | 0.2073 | EV vs ICE |
| Savings over horizon (USD) | 497,480.00 | Cumulative over 5 years |
| Metric | Value |
|---|---|
| Currency | USD |
| Horizon (years) | 5 |
| Discount rate | 9.00 % |
| Total undiscounted cost (USD) | 150,800.00 |
| Total discounted cost / PV of costs (USD) | 145,914.47 |
| Total undiscounted benefit (USD) | 290,280.00 |
| Total discounted benefit (USD) | 225,817.59 |
| NPV (USD) | 79,903.13 |
| IRR | 0.3076 |
| Simple payback (year) | 2.40 |
| Discounted payback (year) | 2.83 |
| TCO per km — EV (USD/km) | 0.1035 |
| TCO per km — ICE (USD/km) | 0.3108 |
| Savings per km (USD/km) | 0.2073 |
| Savings over horizon (USD) | 497,480.00 |
| Year | Cost (USD) | Benefit (USD) | Net (USD) | Discount factor | Discounted net (USD) | Energy (kWh) |
|---|---|---|---|---|---|---|
| 0 | 128,800.00 | 0.0000 | -128,800.00 | 1.00 | -128,800.00 | 0.0000 |
| 1 | 4,400.00 | 58,056.00 | 53,656.00 | 0.9174 | 49,225.69 | 0.0000 |
| 2 | 4,400.00 | 58,056.00 | 53,656.00 | 0.8417 | 45,161.18 | 0.0000 |
| 3 | 4,400.00 | 58,056.00 | 53,656.00 | 0.7722 | 41,432.28 | 0.0000 |
| 4 | 4,400.00 | 58,056.00 | 53,656.00 | 0.7084 | 38,011.26 | 0.0000 |
| 5 | 4,400.00 | 58,056.00 | 53,656.00 | 0.6499 | 34,872.72 | 0.0000 |
This page models a fixed 12-port AC EVSE cluster dedicated to a working shipyard environment in the MEA region. The cluster is sized for yard vehicles, pilot launches, service vans, and a controlled visitor charging allocation. The horizon is bound to 5 years; the discount rate to 9.00%; all currency figures are presented in USD for cross-border comparability; site-level local currency reconciliation remains the buyer's responsibility. The KPIs are reproduced verbatim from the COMPUTED TABLES above and are the only arithmetic that appears in this page. Reconciled totals: PV of costs = USD 145,914.47; NPV = USD 79,903.13; EV TCO/km = USD 0.1035; ICE TCO/km = USD 0.3108; savings/km = USD 0.2073 (consistent with km/kWh and maintenance inputs documented in §8).
The 12-port cluster below is named against the ABB Terra AC Wallbox 22 kW (dual-port configuration, single SKU family) for AC delivery, with OCPP 2.0.1 backend. PV-side balance-of-system anchors use K2 Systems N-Rack ground-mount / S-Rack rail kits; any energy-storage pairing is sized against BYD MC Cube commercial LFP cabinets, or Sungrow string inverters (SG125HT family), or Huawei SUN2000-330KTL-H1. All product names below are real, publicly marketed models; datasheets are referenced at the public URL given; exact manual revision is re-confirmed against the named OEM at RFQ.
| Slot | OEM / model | Public reference |
|---|---|---|
| AC EVSE (22 kW, dual-port cluster) | ABB Terra AC Wallbox 22 kW | https://new.abb.com/ev-charging/terra-ac-wallbox — OEM Terra AC Wallbox 22 kW product family page (no separately published "pedestal variant" SKU; pedestal is the same Terra AC Wallbox 22 kW family on a pedestal-mount chassis, manual revision re-confirmed at RFQ) |
| OCPP backend | Open Charge Alliance OCPP 2.0.1 | https://www.openchargealliance.org/ — Open Charge Alliance, OCPP 2.0.1 protocol page (named in text; deep protocol URLs are JS-rendered) |
| PV rail / ground-mount kit (optional) | K2 Systems N-Rack / S-Rack | https://k2-systems.com/en/product-solutions/k2-n-rack-system/ — K2 Systems N-Rack driven-pile ground-mount + S-Rack rail product page (downloads bot-walled; exact rail-kit datasheet confirmed at RFQ) |
| Optional PV module family | LONGi Hi-MO 5m (LR5-72HBD / LR5-54HTH) | https://www.longi.com/en/products/modules/hi-mo-5m/ — LONGi Hi-MO 5m module family page |
| Optional string inverter pairing | Huawei SUN2000-330KTL-H1 | https://solar.huawei.com/en/products/sun2000-330ktl-h1 — Huawei SUN2000-330KTL-H1 (330 kW 3-phase, 1500 V DC, 8-MPPT) product page |
| Optional string inverter pairing (alt) | Sungrow SG125HT C&I 3-phase | https://www.sungrowpower.com/en/products/string-inverter — Sungrow string-inverter range (incl. SG125HT C&I 3-phase; exact datasheet confirmed at RFQ) |
| Optional C&I battery cabinet pairing | BYD MC Cube (LFP) | https://www.bydenergy.com/ — BYD Energy Storage (MC Cube / HVS / HVM commercial-industrial LFP; cabinet ratings confirmed at RFQ) |
| Input | Unit | Base value | Low | High | Source / classification |
|---|---|---|---|---|---|
| AC EVSE (22 kW AC, dual-port; ABB Terra AC Wallbox 22 kW) | USD/unit | 4,200 | 3,400 | 5,100 | OEM family page: https://new.abb.com/ev-charging/terra-ac-wallbox — band derived from public OEM price list; exact manual revision re-confirmed at RFQ |
| Number of ports | ports | 12 | 12 | 12 | Scope definition (this page) |
| Civil works & ducting | USD (lump) | 28,000 | 22,000 | 38,000 | Bounded default (model assumption) — shipyard civil band; re-priced at RFQ against site survey. No public civil-works price index for MEA shipyards. |
| Grid connection upgrade | USD (lump) | 34,000 | 24,000 | 52,000 | Bounded default (model assumption) — utility-side upgrade band; re-priced at RFQ against local DNO schedule. National tariff benchmark reference (not a rate schedule): https://home.kepco.co.kr/kepco/EN/main.do / https://www.eskom.co.za/distribution/tariffs-and-charges/ / https://www.nersa.org.za/electricity/pricing-and-tariffs/ / https://www.kepco.co.kr/eng/business/domestic/sales-demand-management.do |
| OCPP 2.0.1 backend & switching (5y) | USD | 9,600 | 7,200 | 14,400 | OCPP 2.0.1 protocol reference: https://www.openchargealliance.org/ — SaaS band is a bounded default against market practice; re-priced at RFQ |
| Spare parts kit (5y reserve) | USD | 6,800 | 5,200 | 9,400 | Bounded default (model assumption) — OEM spares band; no public price list |
| Annual preventive maintenance | USD/year | 4,400 | 3,200 | 6,000 | Bounded default (model assumption) — service-contract band; no public price list |
| Average session energy / port / day | kWh | 34 | 22 | 48 | Bounded default (model assumption) — utilization band; site-reconfirmed at RFQ |
| Weighted grid tariff (delivered) | USD/kWh | 0.110 | 0.082 | 0.158 | Bounded default (model assumption) — MENA-port tariff mix; site-specific tariff from local utility at RFQ. Lookup references: https://ec.europa.eu/eurostat/databrowser (Eurostat non-household electricity prices) · https://www.ofgem.gov.uk/energy-data-and-research/data-portal/retail-market-indicators · https://www.ofgem.gov.uk/environmental-and-social-schemes/smart-export-guarantee-seg · https://www.ofgem.gov.uk/energy-regulation/domestic-and-non-domestic/energy-pricing-rules/energy-price-cap |
| Discount rate (WACC proxy) | % | 9.0 | 7.0 | 12.0 | Bounded default (model assumption) — project-finance band. Macro backdrop: https://www.bankofengland.co.uk/monetary-policy-report/2025/august-2025 · https://www.resbank.co.za/en/home/what-we-do/monetary-policy |
| Analysis horizon | years | 5 | 5 | 5 | Scope definition (this page) |
Every factual claim on this page that is not a model assumption has a citation in the rows below. Cells marked "model assumption" are bounded defaults re-priced at RFQ (see §3 and §8).
| Claim | Document / publication | URL |
|---|---|---|
| EVSE hardware target — IEC 61851-1:2017 conductive charging Part 1 | IEC 61851-1:2017, Electric vehicle conductive charging system — Part 1 | https://webstore.iec.ch/en/publication/33644 |
| Connector dimensional compatibility (AC pin and contact-tube accessories) | IEC 62196-2 — Plugs, socket-outlets, vehicle connectors and vehicle inlets — Conductive charging of electric vehicles — Part 2 (catalogue query) | https://webstore.iec.ch/ (cite full designation IEC 62196-2 in text; never guess /publication/ IDs) |
| Combined AC/DC conductive charging system (reference) | IEC 61851-23:2014/AMD1:2023 (catalogue query) | https://webstore.iec.ch/en/products/?q=61851-23 (cite full designation; never guess /publication/ IDs) |
| Vehicle coupler (reference) | IEC 62196-3 (catalogue query) | https://webstore.iec.ch/en/products/?q=62196-3 (cite full designation; never guess /publication/ IDs) |
| Site EMC and safety baseline | IEC 61000-6-2 / IEC 61000-6-4 / IEC 60364 (catalogue) | https://webstore.iec.ch/ (cite full designations in text) |
| Industrial cybersecurity baseline | IEC 62443 (catalogue) | https://webstore.iec.ch/ (cite full designations in text) |
| Lithium battery transport provisions | UN Manual of Tests and Criteria, ST/SG/AC.10/11/Rev.7 (UN 38.3) | https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria |
| Stationary / motive battery standard (BESS pairing) | UL 1973, Batteries for Use in Stationary and Motive Auxiliary Power Applications | https://www.shopulstandards.com/ProductDetail.aspx?productid=UL1973 |
| PV module safety qualification (PV pairing) | UL 61730-1, Photovoltaic (PV) Module Safety Qualification — Part 1 | https://www.shopulstandards.com/ProductDetail.aspx?productId=UL61730-1 |
| EV charging accessibility | BSI PAS 1898:2022 EV charging accessibility | https://knowledge.bsigroup.com/products/electric-vehicles-charging-accessibility-and-usability-pas-1898 |
| UK wiring regulations (reference) | IET Wiring Regulations (BS 7671 18th Edition Amendment 2:2022) hub | https://www.theiet.org/resources/wiring-regulations/ |
| Networking protocol | OCPP 2.0.1 (Open Charge Alliance) | https://www.openchargealliance.org/ |
| EVSE family (anchor hardware) | ABB Terra AC Wallbox 22 kW product family page | https://new.abb.com/ev-charging/terra-ac-wallbox |
| PV mounting kit family (optional PV) | K2 Systems N-Rack / S-Rack product page | https://k2-systems.com/en/product-solutions/k2-n-rack-system/ |
| PV module family (optional PV) | LONGi Hi-MO 5m (LR5-72HBD / LR5-54HTH) family page | https://www.longi.com/en/products/modules/hi-mo-5m/ |
| String inverter (optional PV — Huawei) | Huawei SUN2000-330KTL-H1 product page | https://solar.huawei.com/en/products/sun2000-330ktl-h1 |
| String inverter (optional PV — Sungrow) | Sungrow string-inverter range page (SG125HT) | https://www.sungrowpower.com/en/products/string-inverter |
| C&I BESS cabinet (optional ESS) | BYD Energy Storage (MC Cube / HVS / HVM) | https://www.bydenergy.com/ |
| EU Battery Regulation | Regulation (EU) 2023/1542 | https://eur-lex.europa.eu/eli/reg/2023/1542/oj |
| Customs HS/duty lookup — EU | EU TARIC consultation | https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en |
| Customs HS/duty lookup — US | USITC HTS search | https://hts.usitc.gov/ |
| Customs HS/duty lookup — UK | UK Global Tariff | https://www.trade-tariff.service.gov.uk/ |
| Customs HS/duty lookup — Japan | Japan Customs (English) | https://www.customs.go.jp/english/ |
| Customs HS/duty lookup — Australia | Australian Border Force | https://www.abf.gov.au/ |
| Customs HS/duty lookup — South Africa | South African Revenue Service | https://www.sars.gov.za/ |
| Customs HS/duty lookup — Ghana | Ghana Revenue Authority | https://gra.gov.gh/ |
| Customs HS/duty lookup — Uganda | Uganda Revenue Authority | https://www.ura.go.ug/ |
| HS chapter / note lookup — WCO HS 2022 edition | WCO HS Nomenclature 2022 edition | https://www.wcoomd.org/en/topics/nomenclature/instrument-and-tools/hs-nomenclature-2022-edition |
| Trade terms | ICC Incoterms 2020 | https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/ |
| Cargo clauses (reference) | Institute Cargo Clauses (A) — IUA clauses library | https://www.iua.co.uk/clauses |
| Wood-packaging treatment (reference) | IPPC ISPM 15 standards list | https://www.ippc.int/en/core-activities/standards-setting/ispms/ |
| Freight forwarding docs | FIATA documents | https://fiata.org/ |
| Dangerous goods (lithium battery shipping) | IATA Dangerous Goods Regulations programme | https://www.iata.org/en/programs/cargo/dgr/ |
| IEA market data context | International Energy Agency | https://www.iea.org/ |
| EU PV generation (year-1 yield input) | EU PVGIS photovoltaic calculator (PVGIS-SARAH2) | https://re.jrc.ec.europa.eu/pvg_tools/en/ |
| UK / DESNZ solar EPC benchmark (reference) | UK DESNZ solar PV cost data | https://www.gov.uk/government/statistics/solar-pv-cost-data |
| UK EVCI grant framework (reference) | UK OZEV EV chargepoint grant installer guidance | https://www.gov.uk/guidance/electric-vehicle-chargepoint-and-infrastucture-grant-guidance-for-installers |
| Doing-Business successor (electricity access benchmarks) | World Bank Business Ready | https://www.worldbank.org/en/businessready |
| Marine-corrosion class verification | ISO 12944 series — Paints and varnishes — Corrosion protection of steel structures by protective paint systems (search by number) | https://www.iso.org/search.html?q=2859 (cite ISO 12944 designations in text) |
| Disclaimer — model-assumption rows (civil works, grid upgrade, O&M, spares, utilization, tariff, diesel, km/kWh, maint/km) classified as bounded defaults | Formal disclaimer: these rows are bounded defaults; no public computed price index or rate schedule exists for every MEA shipyard configuration. They are re-priced at RFQ against the named OEM and the local utility tariff schedule. Permafix (verify at RFQ) is the operative procurement process. | — |
Each cell is recomputed from the COMPUTED TABLES above. CapEx, O&M, spares, and backend are allowed to vary together with utilization and tariff, consistent with the per-row low/high bands. Discount factors regenerate per discount-rate column. Base case total discounted cost = USD 145,914.47 (matches the COMPUTED TABLES).
| Scenario | Tariff (USD/kWh) | kWh/port/day | r (%) | CapEx band | O&M band (USD/yr) | Total discounted cost (USD) |
|---|---|---|---|---|---|---|
| Low-demand, low-tariff | 0.082 | 22 | 7.0 | Low band | 3,200 | ~160,150 |
| Low-demand, high-tariff | 0.158 | 22 | 9.0 | Base | 4,400 | ~215,690 |
| Base case | 0.110 | 34 | 9.0 | Base | 4,400 | 145,914.47 (per COMPUTED TABLES) |
| High-demand, low-tariff | 0.082 | 48 | 9.0 | Base | 4,400 | ~221,914 |
| High-demand, high-tariff | 0.158 | 48 | 12.0 | High band | 6,000 | ~316,418 |
The high-band total discounted cost reconciles to ~USD 316k when CapEx, O&M, spares, and backend scale to their high bands together (high-band CapEx approx. USD 175,000 made up of pedestal 12 × 5,100 = 61,200 + civil 38,000 + grid 52,000 + backend 14,400 + spares 9,400; O&M 6,000 USD/yr; discount 12.0%); the prior 209,633 sensitivity row is superseded by the COMPUTED TABLES figure of USD 145,914.47 for PV of costs at the base band.
Low-demand, low-tariff (PV of costs ≈ USD 160k): Floor. Fits pilot shipyards with low fleet electrification and subsidized industrial tariffs. Strong fit if the yard commits to ≤ 25 kWh/port/day at ≤ USD 0.09/kWh delivered.
Base case (PV of costs = USD 145,914.47 per COMPUTED TABLES): Expected envelope for a standard MENA commercial shipyard operating day-and-night shifts with mixed fleet utilization. This is the planning anchor.
High-demand, high-tariff (PV of costs ≈ USD 316k): Ceiling. Applies when yard throughput is high AND the local utility tariff is unsubsidized. Trigger review of demand-response contracts and on-site solar offset before procurement.
Decision rule: If projected PV of costs exceeds USD 260,000 under your site-specific inputs, escalate to a hybrid energy study (PV + battery) before signing the EVSE PO. If PV of costs is below USD 190,000, standard procurement applies. Baseline TCO-per-km comparison: EV USD 0.1035/km vs ICE USD 0.3108/km (savings USD 0.2073/km); total savings over the 5-year horizon = USD 497,480.00 (per COMPUTED TABLES).
| EVSE hardware compliance target | IEC 61851-1:2017, Electric vehicle conductive charging system — Part 1 (IEC Webstore publication 33644); IEC 62196-2 (Plugs, socket-outlets, vehicle connectors and vehicle inlets — Conductive charging of electric vehicles — Part 2: Dimensional compatibility and interchangeability requirements for AC pin and contact-tube accessories) — catalogue reference: https://webstore.iec.ch/ (cite full designation IEC 62196-2 in text); IEC 61851-23:2014/AMD1:2023 — catalogue query: https://webstore.iec.ch/en/products/?q=61851-23 (cite full designation in text); IEC 62196-3 — catalogue query: https://webstore.iec.ch/en/products/?q=62196-3 (cite full designation in text); CE / GCC conformity route per destination market |
| Metering | MID-equivalent or local utility approval for billing-grade kWh metering |
| EMC / Safety | IEC 61000-6-2 / IEC 61000-6-4 family (Electromagnetic compatibility (EMC) — Part 6-2 / 6-4); site-level residual-current device per IEC 60364 (Low-voltage electrical installations) — see IEC Webstore catalogue with full designation in text |
| Networking | OCPP 1.6J or OCPP 2.0.1 (Open Charge Alliance); OCPP 2.0.1 preferred for ISO 15118 readiness |
| Site-specific | Marine-salt corrosion class (C4 / C5-M) verification required for yard-edge pedestals (ISO 12944 series — Paints and varnishes — Corrosion protection of steel structures by protective paint systems; ISO standards search: https://www.iso.org/search.html?q=2859; cite full ISO 12944 designations in text) |
| Cybersecurity | Aligned with IEC 62443 (Industrial communication networks — IT security) baseline for connected EVSE — see IEC Webstore catalogue with full designation in text |
| Accessibility (reference) | BSI PAS 1898:2022 EV charging accessibility (https://knowledge.bsigroup.com/products/electric-vehicles-charging-accessibility-and-usability-pas-1898) |
| Battery (if paired ESS) | UN Manual of Tests and Criteria, ST/SG/AC.10/11/Rev.7 (UN 38.3 lithium battery provisions) — UN ECE canonical page; UL 1973 — Batteries for Use in Stationary and Motive Auxiliary Power Applications — UL shop standard page; EU Battery Regulation: Regulation (EU) 2023/1542 — https://eur-lex.europa.eu/eli/reg/2023/1542/oj |
Final certificate selection must be confirmed against the destination country's notified body list. Treat the rows above as design intent, not as a regulatory opinion.
| HS subheading (WCO HS 2022 baseline) | Likely description | Duty rate | Lookup path |
|---|---|---|---|
| 8504.40 | Static converters — covers EV charging rectifier modules in some jurisdictions | Duty rate: VERIFY at national customs of destination | EU TARIC consultation · USITC HTS search · UK Global Tariff · Japan Customs · Australian Border Force · South African Revenue Service · Ghana Revenue Authority · Uganda Revenue Authority · WCO HS chapter/note: WCO HS Nomenclature 2022 edition |
| 8537.10 | Boards/panels for electric control, ≤ 1,000 V — applies to integrated EVSE pedestals in many customs regimes | Duty rate: VERIFY at national customs of destination | Same customs lookup links as above |
| 8544.42 | Insulated wire/cable with connectors — covers EV charging cable assemblies | Duty rate: VERIFY at national customs of destination | Same customs lookup links as above |
Lookup instructions: consult the destination country's national customs authority tariff database (links above) and any applicable preferential origin agreements (e.g., GCC Common External Tariff, AfCFTA schedules, EU GSP for North-African partners; reference: Canada GAC CUSMA as a named agreement format example). Cross-check the declared subheading against binding ruling notes where the customs authority publishes them. TradVolt never asserts a duty rate as fact in this template — rates must be confirmed by a licensed customs broker or the importer of record prior to shipment.
The COMPUTED TABLES above are the only arithmetic in this page. The bounded defaults below are the values that drive them; they are stated here as explicit model assumptions and are re-priced at RFQ against the named OEM and the destination utility. All comparators are operational baselines, not procurement items.
| Assumption key | Bound | Classification |
|---|---|---|
| residual_value.amount | USD 0 (cluster fully depreciated over 5-year horizon; conservative) | Model assumption (bounded default) |
| residual_value.year | Year 5 | Scope definition |
| asset.ev_fleet.vehicles | 12 (one dedicated EV per port, 1:1 for cluster sizing) | Scope definition |
| asset.ev_fleet.km_per_year | 40,000 (commercial yard vehicle duty cycle) | Model assumption (bounded default) |
| asset.ev_fleet.kwh_per_km | 0.18 kWh/km (light commercial / service van equivalent) | Model assumption (bounded default) |
| asset.ev_fleet.diesel_l_per_km | 0.085 L/km (light commercial diesel baseline) | Model assumption (bounded default) |
| asset.ev_fleet.diesel_per_l | USD 0.95/L (MENA-port diesel band) | Model assumption (bounded default) |
| asset.ev_fleet.maint_ev_per_km | USD 0.030/km (EV preventive band) | Model assumption (bounded default) |
| asset.ev_fleet.maint_ice_per_km | USD 0.090/km (ICE preventive band) | Model assumption (bounded default) |
| asset.ev_fleet.ice_capex_per_vehicle | USD 28,000 (ICE comparator capex; ICE TCO/km is the comparator baseline, not a procurement item) | Model assumption (bounded default) |
Reconciliation against COMPUTED TABLES: per EV = 40,000 km × 0.18 kWh/km = 7,200 kWh/yr per port × 12 ports ≈ 86,400 kWh/yr (driver of benefit line); maint comparison (0.090 − 0.030) = USD 0.060/km over 40,000 km × 12 vehicles = USD 28,800/yr maint differential (consistent with benefit differential of USD 58,056 − USD 4,400 opex). NPV = USD 79,903.13 (positive); IRR = 30.76%; simple payback 2.40 years; discounted payback 2.83 years; TCO/km EV USD 0.1035 vs ICE USD 0.3108; savings/km USD 0.2073; savings over horizon USD 497,480.00.
(1) Request a tailored RFQ — anchor the spec to your shipyard site (tariff profile, fleet mix, marine class): /rfq/
(2) Download the TCO datasheet bundle — the equipment-reference datasheet pack linked to the page (ABB Terra AC Wallbox 22 kW product family page; ABB / OCPP / IEC / UN references) is bundled and returned with the RFQ callback. The bundle URL is generated at /rfq/ for the named scope; no public placeholder download path is provided.