Incoterms 2020 Selection (ICC Publication No. 723E): Avoid EXW unless you control a licensed Chinese export agent and bonded consolidation warehouse, as EXW shifts China export customs clearance and factory pick-up onto the buyer . Specify FOB (Shenzhen / Ningbo / Shanghai / Qingdao) when your forwarder holds contracted FCL ocean rates, or CIF / CIP / DAP when you want the seller to bundle carriage and Institute Cargo Clauses (A) marine insurance (0.3–0.5% of CIF) while your local entity acts as Importer of Record (IoR) to recover import VAT/GST . Use DDP only when the seller is equipped to clear destination customs and pay cascading border taxes (such as Senegal's 20% ECOWAS CET DD + 1% UEMOA PCS + 18% TVA or Turkey's import duty + KDV) .
Transit Modes & Lithium Battery DG Rules: Ocean freight under IMO IMDG Code Class 9 (UN 3480) is the standard route for LFP cells (EVE LF304, 5,450 g), rack modules (Pylontech US5000, 39.7 kg; Deye BOS-G, 5.12 kWh), C&I towers (Huawei LUNA2000-215), and 20-ft containers (Sungrow PowerTitan2.0, 5 MWh), taking 7–10 working days (CN → Sri Lanka) or 18–25 days port-to-port (CN → Karachi) . Overland CPEC road freight via Khunjerab/Sost takes 10–14 days door-to-door but closes November–April for winter weather . Air freight (3–5 days airport-to-airport) requires UN 38.3 and IATA DGR Section 4 Packing Instructions 965–970 (Section II / IB marks), restricting practical use to urgent BMS boards, inverter PCBs, or small cell lots .
1. Side-by-Side ICC Incoterms 2020 Cost & Risk Allocation Matrix
Per the landed-cost calculation method, delivered cost builds across four stages: Supplier price, Export and freight, Border, and Destination . Table 1 maps how ICC Incoterms 2020 allocates each stage .
| Landed-Cost Stage | EXW (CN Factory / Bonded Hub) | FOB (Shenzhen / Ningbo / Shanghai / Qingdao) | CIF / CIP (Destination Port / Place) | DAP (Buyer Site / Warehouse) | DDP (Buyer Site, Duty Paid) |
|---|---|---|---|---|---|
| 1. Supplier Price & ISPM-15 / UN 38.3 Pack | Seller: Factory gate unit + ISPM-15 crate + UN 38.3 T.1–T.8 summary | Seller: Included in FOB price | Seller: Included in CIF/CIP price | Seller: Included in DAP price | Seller: Included in DDP price |
| 2a. CN Pre-Carriage & Export Declaration | Buyer: Arranges CN pick-up, origin handling, and China export filing | Seller: Clears CN export and loads vessel at named CN port | Seller: Included | Seller: Included | Seller: Included |
| 2b. Main Carriage, Class 9 DG Surcharge & Marine Insurance | Buyer: Pays freight, UN 3480 Class 9 surcharge, and insurance | Buyer: Pays ocean/air freight + Class 9 surcharge + ICC-A insurance (0.3–0.5% of CIF; 0.4% typical) | Seller: Contracts freight + marine insurance to destination port/place | Seller: Contracts carriage and bears transit risk to named site | Seller: Contracts carriage and bears transit risk to named site |
| 3. Border Customs, Duty, Levies & Import VAT/TVA/KDV | Buyer: Importer of Record (IoR); pays duty, levies, broker, and VAT | Buyer: IoR; pays duty, levies, broker, and VAT | Buyer: IoR; lodges entry (CUSDEC / ASYCUDA / PSW) and pays duty & VAT | Buyer: IoR; lodges customs entry and settles duties & VAT | Seller: Clears import customs and pays duty, broker fee, and import VAT |
| 4. Destination Port THC & Inland Haulage to Site | Buyer: Pays port THC, DO release, and inland haulage | Buyer: Pays port THC, DO release, and inland haulage | Buyer: Pays destination THC/ISPS, DO release, and last-mile haulage | Seller: Delivers to named buyer site ready for unloading | Seller: Delivers duty-paid to named buyer site |
2. Worked FOB → CIF → Landed Site Build-Ups from the Corpus
- Senegal Cascading CIF → Farm Site Stack (Pylontech US5000 + Deye SUN-5K-SG04LP3-EU): In the Senegal 15 kWh Pylontech US5000 TCO dossier, importing a 4-module Pylontech US5000 rack (~14.4 kWh usable at 95% DoD, 48 V, 74 Ah / 3.584 kWh per module, 6,000 cycles at 90% DoD) bundled with a Deye SUN-5K-SG04LP3-EU 5 kW hybrid inverter and ~3 kWp PV array requires line-by-line HS declaration (8507.60 LFP rack, 8504 inverter, 8541 PV) . Logistics build from (L-1) FOB China price + (L-2) Shenzhen/Ningbo pre-carriage + (L-3) Maersk/CMA CGM/MSC ocean freight to Port of Dakar (PAD) + (L-4) 0.3–0.5% of CIF Institute Cargo Clauses (A) marine insurance + (L-5) IMO IMDG Code UN 3480 Class 9 surcharge . At PAD, Senegal Douanes (
douanes.sn) levies (D-1) 20% Import Duty (DD, ECOWAS CET band 4) on CIF + (D-2) 1% UEMOA statistical levy (PCS) on CIF + (D-3) cascading 18% TVA on (CIF + 20% DD + 1% PCS), followed by (D-4) ASYCUDA broker fees, (D-5) PAD THC/ISPS handling, (D-6) inland haulage, and (D-7) OEM commissioning—totalling USD 6,200 site CapEx (yielding 20-yr NPV = USD 3,506.89, IRR = 15.97%, simple payback = 5.48 yr, discounted payback = 7.71 yr, and LCOS = USD 0.2060/kWh against USD 0.38/kWh displaced diesel) . - Turkey EVSE Depot Build-Up (Sungrow IDC180E 180 kW DC Charger): In the Turkey Sungrow IDC180E fleet depot TCO dossier, the USD 65,000.00 Year-0 landed and commissioned CapEx (driving 25-yr NPV = USD 322,628.25, IRR = 58.67%, simple payback = 1.69 yr, and discounted payback = 1.89 yr) builds from Shenzhen/Ningbo FOB + ocean freight to Ambarli/Mersin + 0.4% marine insurance = CIF value, plus Turkish import duty and additional measures under HS 8504.40 / 8504.90 (via
ggm.ticaret.gov.tr), cascading KDV (VAT) on (CIF + duties), broker/port fees, inland haulage, civil foundation/canopy, TEDAŞ grid connection, and first-year spares .
3. Sea vs Overland vs Air Freight: LFP Dangerous Goods & Bonded-Warehouse Rules
The China → Pakistan Warranty Claim SOP and the China → Sri Lanka Bonded-Warehouse Transfer SOP compare three cross-border modes for LFP equipment .
| Dimension | Sea Freight (FCL / LCL Ocean) | Overland Road (CPEC Corridor) | Air Freight (IATA DGR Cargo) |
|---|---|---|---|
| Routes & Indicative Transit | CN → LK (Colombo): 7–10 working days sea (~14 working days total SOP across 12 steps) CN → PK (Shanghai/Qingdao → Karachi): 18–25 days port-to-port + 3–4 days customs/last-mile (26–34 business days total RMA) |
Kashgar/Wah → Khunjerab → Sost → PK site: 10–14 days door-to-door (16–20 business days total RMA turnaround) | PVG/CKG → ISB/KHI: 3–5 days airport-to-airport (7–10 business days indicative total; corridor-conditional) |
| Covered LFP & BoS Equipment | EVE LF304 cell (304 Ah / 3.2 V / 5,450 g); Pylontech US5000 (48 V / 4.8 kWh / 39.7 kg); Deye BOS-G (51.2 V / 100 Ah / 5.12 kWh); Huawei LUNA2000-215; Sungrow PowerTitan2.0 (2.5 MW / 5 MWh 20-ft container) | Palletized LFP cells, rack modules, inverters, and containerized replacements under DAP Karachi or CIP Lahore | Time-critical BMS modules (HS 8537.10), inverter spare parts (HS 8504.40), and small cell lots meeting IATA weight limits |
| DG & OEM Transport SoC / Torque Limits | UN 38.3 (ST/SG/AC.10/11/Rev.7 §38.3 T.1–T.8) + IMO IMDG Class 9 (UN 3480); transport SoC 30–50% for EVE LF304 (LF304-SM-Rev.C §4.2, M6 torque 8.0–10.0 N·m §6.3), Deye BOS-G (BOS-G-SM-Rev.B §3.1, M5 torque 6.0–8.0 N·m §5.4), and Pylontech US5000 (rev. 2026-06-23, torque 8 N·m ± 0.5 N·m); ≤30% SoC for Sungrow PowerTitan2.0 (20 N·m torque); 12 N·m busbar torque for Huawei LUNA2000-215 |
UN 38.3 test summary + OEM transport SoC discharge (30–50% US5000; ≤30% PowerTitan2.0) + ISO 2859-1:1999 AQL Level II (AQL 1.0 functional / 2.5 cosmetic) inspection at CN hub | Mandatory UN 38.3 + IATA DGR Section 4 Packing Instructions 965–970 (Section II / IB marks) + transport SoC discharge + air DG surcharge |
| Key Constraints & Dossier Gates | Port congestion & customs exam holds; bonded transfers require a 21-file dossier (`01_sales_contract.pdf` to `21_shipment_closure_dossier.zip`) and Sri Lanka CUSDEC (`17_cusdec_lk.pdf`) or Pakistan PSW (`09_PSW_GoodsDeclaration.pdf`) filing | Hard winter closure November–April at Khunjerab Pass and border customs windows | Strict airline DG capacity limits under IATA DGR Packing Instructions 965–970 |
4. Decision Framework: Choosing Incoterms 2020 & Transit Mode
When to Choose FOB vs CIF/CIP
Choose FOB (Shenzhen / Ningbo / Shanghai / Qingdao) when importing multi-container PV or BESS lots where your corporate forwarder controls FCL ocean contracts . Choose CIF or CIP on LCL rack shipments or bonded-warehouse transfers (such as CIP Colombo) so the seller manages China Class 9 DG port handling and bundles Institute Cargo Clauses (A) insurance .
When to Choose DAP vs DDP
Choose DAP (named site/warehouse) when you want door-to-door multimodal transport—including inland oversize BESS haulage—while keeping your local entity as Importer of Record so input VAT/KDV/TVA remains recoverable . Choose DDP only when you require a single duty-paid site price and have confirmed the seller's destination customs brokerage capability .
5. Related Tradvolt Dossiers & Methods
- How Landed Cost Is Calculated — Supplier Price, Freight, Border & Destination Stages
- Warranty Claim Documentation SOP — China → Pakistan Corridor (Sea vs CPEC Overland vs Air)
- Customs Bonded-Warehouse Transfer SOP — CN → LK Corridor (EVE LF304 / Deye BOS-G)
- Import Sungrow IDC180E 180 kW DC EVSE from China to Turkey — Fleet Depot TCO & Incoterms 2020
- Import Pylontech US5000 15 kWh Rack from China to Senegal — CIF → Dakar Duty Stack & TCO
- Landed-Cost Method & Tariff Guides Directory