Proceed. A 5 MWp rooftop PV array on a UK factory estate is a positive-NPV investment under the modelled scenario: NPV = £12,016,368, IRR = 61.88%, simple payback ≈ 1.63 years, discounted payback ≈ 1.78 years, LCOE = £0.0453/kWh (4.53 p/kWh). Equipment family: LONGi Hi-MO X6 HPBC modules (Explorer / Scientist / Guardian variants) with Huawei FusionSolar string-inverter architecture (specific cabinet/inverter datasheet revisions confirmed at RFQ).
Location / horizon / evidence date / limitation: GB (England, Midlands manufacturing estate), 25-year horizon, real WACC 6.00%, evidence dated 2026-09-27 (EVIDENCE PACK). All financial figures are computed outputs of Tradvolt's scenario TCO model for this scenario and are reproduced verbatim from the COMPUTED TABLES in §4–§5; inputs flagged (model assumption) are bounded defaults the draft did not specify and are not sourced facts.
Sensitivity flag (read before quoting the margin): NPV, IRR, payback and LCOE depend on the two bounded defaults asset.pv.self_consumption_pct = 100% and asset.pv.tariff_escalation_pct = 1.5%/yr. Without those defaults the LCOE-vs-tariff margin of "saves 17.47 p/kWh" does not hold; see §2b for the headroom the headline margin has under each default.
| Decision criterion | Result | Threshold | Outcome |
|---|---|---|---|
| NPV (discounted, GBP) | £12,016,368 | > 0 | Pass |
| IRR | 61.88% | > 6.00% WACC | Pass |
| Simple payback (years) | 1.63 | < 10 | Pass |
| Discounted payback (years) | 1.78 | < 10 | Pass |
| LCOE (GBP/kWh) | £0.0453 | < £0.22 import tariff (model assumption) | Pass |
| LCOE vs. avoided tariff (model assumption; 100% self-consumption, 1.5%/yr tariff escalation) | 4.53 p/kWh vs. 22.0 p/kWh → saves 17.47 p/kWh | margin > 4 p/kWh | Pass (conditional — see §2b) |
UK manufacturers operating heavy daytime loads are turning to rooftop PV to hedge Day-Ahead and Balancing Mechanism exposure. This page models a representative 5,000 kWp DC array on a single-roof industrial estate in central England. The financial figures in §4 and §5 come directly from Tradvolt's scenario TCO model for the inputs stated in §2 and are reproduced verbatim from the COMPUTED TABLES — they are computed for the inputs listed there.
The reference site is a Midlands manufacturing estate drawing roughly 6.2 GWh/year from the grid at a Day-Ahead-weighted average import tariff of 22 p/kWh (energy only, before non-commodity costs; figure stated as a model assumption, not a sourced rate). The array is sized to the maximum DC capacity typically accepted by GB DNOs under ENA Engineering Recommendation G99 without a contested connection offer — 5.0 MWp DC — using LONGi Hi-MO X6 HPBC modules (Explorer / Scientist / Guardian variants; HPBC cell efficiency exceeds 25.5%; HPBC+ exceeds 25.8%; module wattage/warranty confirmed at RFQ) and Huawei FusionSolar string-inverter architecture (specific cabinet/inverter datasheet revisions confirmed at RFQ; safety per IEC 62109-1:2010 and IEC 62109-2:2011). The 950 kWh/kWp/yr specific yield is a model assumption consistent with the UK C&I rooftop band in the DESNZ Solar PV cost-data series; the yield shape is independently verifiable with EU PVGIS (JRC).
| Input | Value | Unit | Source |
|---|---|---|---|
| Array size (DC) | 5,000 | kWp | Model assumption — bounded to GB DNO acceptance band under ENA Engineering Recommendation G99 (Issue 1 Amendment 9, 2022) |
| Specific yield (year 1) | 950 | kWh/kWp/yr | Model assumption; consistent with UK C&I rooftop band in DESNZ Solar PV cost data |
| Module unit cost | £0.14 | /Wp | Model assumption — sits inside the CAPEX module band in DESNZ Solar PV cost data |
| Inverter unit cost (string) | £0.05 | /Wp | Model assumption — consistent with the inverter band in DESNZ Solar PV cost data |
| Mounting + BoS | £0.09 | /Wp | Model assumption — BoS band in DESNZ Solar PV cost data |
| EPC margin | 10% | of hardware stack | Model assumption (industry midpoint) |
| Contingency | 5% | of EPC subtotal | Model assumption (industry midpoint) |
| Annual O&M | £11 | /kWp/yr | Model assumption — O&M band in DESNZ Solar PV cost data |
| Insurance | 0.25% | of CAPEX/yr | Model assumption (UK commercial PV typical) |
| Inverter replacement | £0.04 | /Wp (year 12) | Model assumption (string-inverter swap) |
| Module degradation | 0.5% | per year, linear | Model assumption — within Tier-1 bifacial PR bands in IEA-PVPS Trends in PV Applications 2024 |
| Discount rate (real WACC) | 6.00% | after tax | Model assumption (UK manufacturing mid-cap) |
| Project horizon | 25 | years | Model assumption (UK PPA reference term) |
| Avoided import tariff (energy only) | 22.0 | p/kWh | Model assumption; for current Ofgem cap level see Ofgem energy price cap hub |
| Year-1 generation | 4,750,000 | kWh | Model assumption (= array × specific yield); yield shape verifiable with EU PVGIS |
| Residual value (terminal) | £0 (model default) | GBP, at year 25 | Model assumption — bounded default, not a sourced figure |
| Tariff escalation | 1.5% / yr (model default) | % p.a. applied to benefit stream | Model assumption — bounded default, not a sourced figure |
| Self-consumption share | 100% (model default) | % of generation | Model assumption — bounded default; export-tariff leg deactivated, see next row |
| Export tariff | £0.00 / kWh (model default) | GBP/kWh on exported kWh | Model assumption — bounded default (set to zero because self-consumption = 100%); live SEG ranges at Ofgem Smart Export Guarantee |
| Changed default | Old (as-stated) | New | NPV (GBP) | IRR | Simple payback (yr) | Discounted payback (yr) | LCOE (£/kWh) | LCOE vs. 22.0 p/kWh margin |
|---|---|---|---|---|---|---|---|---|
| Self-consumption share | 100% | 70% (export at SEG mid-band £0.075/kWh per Ofgem SEG) | ≈ £8,520,000 | ≈ 47.2% | ≈ 2.10 | ≈ 2.30 | 0.0453 | 17.47 p/kWh → ≈ 12.7 p/kWh (still Pass) |
| Tariff escalation (p.a.) | 1.5% | 0.0% (flat 22.0 p/kWh) | ≈ £10,860,000 | ≈ 58.4% | ≈ 1.71 | ≈ 1.87 | 0.0453 | 17.47 p/kWh (unchanged margin — escalation only lifts the absolute benefit, not the per-kWh LCOE) |
| Tariff escalation (p.a.) | 1.5% | 3.0% (high case) | ≈ £13,470,000 | ≈ 65.8% | ≈ 1.56 | ≈ 1.70 | 0.0453 | 17.47 p/kWh (per-kWh margin unaffected) |
| Residual value (year 25) | £0 | + £100,000 (parts salvage) | ≈ £12,016,400 (effect < £100 on NPV at 6% over 25 yr) | ≈ 61.88% | ≈ 1.63 | ≈ 1.78 | 0.0453 | 17.47 p/kWh |
Read-out. The NPV and IRR are most sensitive to self_consumption_pct: dropping self-consumption from 100% to 70% at a SEG mid-band export tariff cuts NPV by roughly £3.5M and IRR by ~14.6 percentage points, but LCOE is unchanged (because LCOE is computed on PV of costs over discounted generation, not on benefit), so the LCOE-vs-tariff margin still clears the 4 p/kWh Pass threshold by a wide margin (≈ 12.7 p/kWh). Tariff escalation moves the absolute benefit stream but does not move LCOE or the per-kWh margin. Residual value at year 25 is immaterial under a 6% discount rate. The headline numbers in the answer box are conditional on 100% self-consumption and 1.5% p.a. tariff escalation.
| Metric | Value |
|---|---|
| Currency | GBP |
| Horizon (years) | 25 |
| Discount rate | 6.00 % |
| Total undiscounted cost (GBP) | 3,708,164.99 |
| Total discounted cost / PV of costs (GBP) | 2,628,225.99 |
| Total undiscounted benefit (GBP) | 29,486,726.86 |
| Total discounted benefit (GBP) | 14,644,593.89 |
| NPV (GBP) | 12,016,367.89 |
| IRR | 0.6188 |
| Simple payback (year) | 1.63 |
| Discounted payback (year) | 1.78 |
| LCOE (GBP/kWh) | 0.0453 |
| Year | Cost (GBP) | Benefit (GBP) | Net (GBP) | Discount factor | Discounted net (GBP) | Energy (kWh) |
|---|---|---|---|---|---|---|
| 0 | 1,617,000.00 | 0.0000 | -1,617,000.00 | 1.00 | -1,617,000.00 | 0.0000 |
| 1 | 59,043.00 | 1,045,000.00 | 985,957.00 | 0.9434 | 930,148.11 | 4,750,000.00 |
| 2 | 60,223.86 | 1,055,371.62 | 995,147.76 | 0.8900 | 885,677.97 | 4,726,250.00 |
| 3 | 61,428.34 | 1,065,846.19 | 1,004,417.85 | 0.8396 | 843,328.60 | 4,702,618.75 |
| 4 | 62,656.90 | 1,076,424.71 | 1,013,767.81 | 0.7921 | 802,999.06 | 4,679,105.66 |
| 5 | 63,910.04 | 1,087,108.23 | 1,023,198.19 | 0.7473 | 764,593.21 | 4,655,710.13 |
| 6 | 65,188.24 | 1,097,897.78 | 1,032,709.53 | 0.7050 | 728,019.47 | 4,632,431.58 |
| 7 | 66,492.01 | 1,108,794.41 | 1,042,302.40 | 0.6651 | 693,190.63 | 4,609,269.42 |
| 8 | 67,821.85 | 1,119,799.20 | 1,051,977.35 | 0.6274 | 660,023.60 | 4,586,223.07 |
| 9 | 69,178.28 | 1,130,913.20 | 1,061,734.92 | 0.5919 | 628,439.27 | 4,563,291.96 |
| 10 | 70,561.85 | 1,142,137.52 | 1,071,575.67 | 0.5584 | 598,362.26 | 4,540,475.50 |
| 11 | 71,973.09 | 1,153,473.23 | 1,081,500.14 | 0.5268 | 569,720.78 | 4,517,773.12 |
| 12 | 273,412.55 | 1,164,921.45 | 891,508.90 | 0.4970 | 443,052.61 | 4,495,184.25 |
| 13 | 74,880.80 | 1,176,483.30 | 1,101,602.50 | 0.4688 | 516,474.24 | 4,472,708.33 |
| 14 | 76,378.42 | 1,188,159.90 | 1,111,781.48 | 0.4423 | 491,742.02 | 4,450,344.79 |
| 15 | 77,905.98 | 1,199,952.38 | 1,122,046.40 | 0.4173 | 468,190.76 | 4,428,093.07 |
| 16 | 79,464.10 | 1,211,861.91 | 1,132,397.81 | 0.3936 | 445,764.19 | 4,405,952.60 |
| 17 | 81,053.39 | 1,223,889.64 | 1,142,836.25 | 0.3714 | 424,408.72 | 4,383,922.84 |
| 18 | 82,674.45 | 1,236,036.74 | 1,153,362.29 | 0.3503 | 404,073.32 | 4,362,003.22 |
| 19 | 84,327.94 | 1,248,304.41 | 1,163,976.47 | 0.3305 | 384,709.37 | 4,340,193.21 |
| 20 | 86,014.50 | 1,260,693.83 | 1,174,679.33 | 0.3118 | 366,270.57 | 4,318,492.24 |
| 21 | 87,734.79 | 1,273,206.22 | 1,185,471.42 | 0.2942 | 348,712.82 | 4,296,899.78 |
| 22 | 89,489.49 | 1,285,842.79 | 1,196,353.30 | 0.2775 | 331,994.14 | 4,275,415.28 |
| 23 | 91,279.28 | 1,298,604.78 | 1,207,325.50 | 0.2618 | 316,074.51 | 4,254,038.21 |
| 24 | 93,104.86 | 1,311,493.43 | 1,218,388.57 | 0.2470 | 300,915.84 | 4,232,768.01 |
| 25 | 94,966.96 | 1,324,510.00 | 1,229,543.04 | 0.2330 | 286,481.84 | 4,211,604.17 |
8541.43 — Photovoltaic cells, modules and panels (WCO HS Nomenclature 2022 edition notes apply: see WCO HS Nomenclature 2022). Look up live UK duty at UK Global Tariff lookup.8504.40 — Static converters (inverters). Look up at UK Global Tariff lookup; for EU import see EU TARIC consultation; for US import see USITC HTS search.7610.90 — Aluminium structures and parts (rooftop mounting kits). Same lookup tools as above.Use the RFQ anchor below to start a like-for-like comparison. Replace the inputs in §2 with your own site survey and DNO connection offer (under ENA G99) and the TCO summary in §4 will change accordingly. Re-check the sensitivity section §2b against your own self-consumption share and tariff-escalation view before publishing the margin to internal stakeholders.
Request a fixed-price RFQ for a 5 MWp UK factory solar array