Equipment: CATL EnerC+ 2 MWh LFP container BESS Route: China → Turkey (TR) Horizon: 25 years Evidence date: 2026-09-21 Limitation: model assumption, not a sales offer

Import a CATL EnerC+ 2 MWh LFP Container BESS from China to Turkey — Datacenter TCO & Landed-Cost Reference

B2B procurement reference for sourcing a CATL EnerC+ ~2 MWh lithium iron phosphate (LFP) containerised battery energy storage system (BESS) from China to a Turkish datacenter for critical-load and peak-shaving. Includes computed 25-year NPV, LCOS, payback, the Turkish HS 8507.60 duty stack and the IEC 62619 / UN 38.3 / UL 9540A compliance frame. OEM: CATL (Contemporary Amperex Technology Co., Limited).

Verdict (scenario TCO model output)

Equipment: CATL EnerC+ (containerised LFP BESS, ~2 MWh per 20 ft ISO unit). Location: Turkey (TR). Horizon: 25 years. Evidence date: 2026-09-21. Limitation: cell pricing, OpEx drivers and freight ranges are model assumptions; only the model output numbers are computed.

MetricValue
NPV (25 yr, 8% discount)−USD 519,770
Simple paybackNone within horizon
Discounted paybackNone within horizon
LCOSUSD 0.2307 / kWh
IRR−4.56%

Recommendation: this scenario does not recover CapEx over 25 years at the assumed savings rate; revisit cell pricing, discount rate or annual value-per-kWh-discharged before issuing a PO. Use the RFQ form to obtain firm OEM pricing.

TCO summary (computed, computed)

TCO summary
MetricValue
CurrencyUSD
Horizon (years)25
Discount rate8.00 %
Total undiscounted cost (USD)1,754,999.90
Total discounted cost / PV of costs (USD)1,180,118.86
Total undiscounted benefit (USD)1,462,313.17
Total discounted benefit (USD)660,349.20
NPV (USD)-519,769.66
IRR-0.0456
Simple payback (year)—
Discounted payback (year)—
LCOS (USD/kWh)0.2307

Figures are the computed output of the scenario TCO model for this scenario. Do not edit.

Year-by-year cash flow (computed, computed)

Year-by-year cash flow
YearCost (USD)Benefit (USD)Net (USD)Discount factorDiscounted net (USD)Energy (kWh)
0803,700.000.0000-803,700.001.00-803,700.000.0000
129,700.0069,709.0940,009.090.925937,045.45540,000.00
230,294.0068,663.4538,369.450.857332,895.62531,900.00
330,899.8867,633.5036,733.620.793829,160.33523,921.50
431,517.8866,619.0035,101.120.735025,800.37516,062.68
532,148.2465,619.7233,471.480.680622,780.13508,321.74
632,791.2064,635.4231,844.220.630220,067.26500,696.91
733,447.0263,665.8930,218.860.583517,632.42493,186.46
834,115.9662,710.9028,594.940.540315,448.95485,788.66
934,798.2861,770.2426,971.950.500213,492.69478,501.83
1035,494.2560,843.6825,349.430.463211,741.69471,324.30
1136,204.1359,931.0323,726.890.428910,176.06464,254.44
1236,928.2259,032.0622,103.850.39718,777.74457,290.62
1337,666.7858,146.5820,479.800.36777,530.38450,431.26
1438,420.1257,274.3818,854.270.34056,419.14443,674.79
1539,188.5256,415.2717,226.750.31525,430.59437,019.67
1639,972.2955,569.0415,596.750.29194,552.54430,464.38
1740,771.7454,735.5013,963.770.27033,773.97424,007.41
1841,587.1753,914.4712,327.300.25023,084.89417,647.30
1942,418.9153,105.7510,686.840.23172,476.27411,382.59
2043,267.2952,309.179,041.870.21451,939.92405,211.85
2144,132.6451,524.537,391.890.19871,468.44399,133.67
2245,015.2950,751.665,736.370.18391,055.15393,146.67
2345,915.6049,990.394,074.790.1703694.00387,249.47
2446,833.9149,240.532,406.620.1577379.52381,440.73
2547,770.5948,501.92731.340.1460106.79375,719.12

Year-0 cost of USD 803,700 is the all-in landed CapEx for the CATL EnerC+ scenario (EXW unit, sea freight, insurance, Turkish import duty, KDV, port handling, inland transport, civil works and commissioning, packed into the model's Year 0).

1 — Equipment & OEM identification

FieldValueSource
Equipment familyContainerised LFP BESS, 20 ft ISO, ~2 MWh classReference scenario, this page
Product modelCATL EnerC+ (EnerC Plus) containerised LFP BESSCATL official product page — EnerC series
OEM legal entityContemporary Amperex Technology Co., Limited (CATL)catlbattery.com corporate site
Cell chemistryLithium iron phosphate (LFP)CATL EnerC product page (linked above)
Cabinet form factor20 ft ISO high-cube container, integrated BMS, HVAC, fire suppression, liquid coolingCATL EnerC product page (linked above)
Operating limits (limits referenced for the scenario)SOC window, DC voltage, torque values: see OEM Operation & Maintenance Manual revision supplied with the RFQ responseTo be supplied by OEM with RFQ response (cert numbers not pre-verified)

No certificate numbers are pre-verified on this page. Certificate numbers and issuing bodies (CATL → TÜV, UL, DNV, etc.) will be returned with the OEM datasheet pack as part of the RFQ response.

2 — Model inputs (explicit bounded assumptions)

InputValue (assumption)Source / status
residual_value.amount0 USD (no terminal salvage assumed)Model assumption
residual_value.year25 (end of horizon)Model assumption
asset.ess.usable_pct95% of nameplate (2,000 kWh usable of ~2,105 kWh nameplate)Model assumption (consistent with CATL EnerC datasheet class)
asset.ess.round_trip_eff92% (DC round-trip, LFP class)Model assumption
asset.ess.cycles_per_year~270 equivalent full cycles/yr (≈1 daily cycle, derated)Model assumption
asset.ess.charge_cost_per_kwhUSD 0.08 / kWh (Turkish grid tariff envelope)Model assumption; not a sourced tariff
asset.ess.value_per_kwh_dischargedUSD 0.13 / kWh (peak-avoidance + UPS value)Model assumption
Discount rate8.00%Model assumption, as used in scenario TCO
Horizon25 yearsModel assumption, as used in scenario TCO

3 — CapEx breakdown (per 2 MWh LFP container, with citations)

Line itemUnit basisRange (USD)Illustrative mid-pointSource
LFP cells (prismatic, 280–314 Ah class) and modulesper kWh90 – 140110Cell pricing envelope: model assumption; CATL EnerC product page for cell form factor — catlbattery.com
BMS + thermal management (HVAC) + fire suppressionper kWh25 – 4535Subsystem envelope: model assumption; refer to OEM datasheet for cabinet ratings
20 ft ISO enclosure, PCS, switchgear, MV/LV transformerlump-sum / unit55,000 – 90,00072,500BoS envelope: model assumption
EMS / SCADA integration, FAT, type-test reportslump-sum / unit12,000 – 22,00017,000Integration envelope: model assumption
OEM ex-works (EXW China) unit price — CATL EnerC+per 2 MWh unit320,000 – 470,000385,000EnerC pricing envelope: model assumption; OEM confirmation required (CATL)
International sea freight (20/40 ft FCL, Far East → TR)per FCL3,500 – 6,5004,800Freight envelope: model assumption; verify against current FAK rates from CN→TR lane carriers at quote time
Marine insurance (≈0.3–0.5% of CIF)per shipment0.3–0.5% of CIF1,200Standard marine cargo practice (Institute Cargo Clauses A); see Lloyd's Market Association
Turkish Customs import duty & additional duties% of CIFPENDING — lookup at tariff portalPENDINGConfirm at T.C. Ticaret Bakanlığı tariff portal — gtb.tariff.tr (T.R. Ministry of Trade, tariff information system)
Turkish VAT (KDV)% of (CIF + duty)PENDING — lookup at tariff portalPENDINGConfirm at T.C. Ticaret Bakanlığı tariff portal — gtb.tariff.tr
Port handling, customs broker, ISPM-15 / DG declarationslump-sum1,800 – 3,2002,500Handling envelope: model assumption
Inland transport to datacenter site (TR, per permit)per unit2,500 – 6,0004,200Inland envelope: model assumption
Civil works, MV connection, commissioning on sitelump-sum18,000 – 35,00026,500Site works envelope: model assumption

Cell pricing, BoS, freight and OpEx driver percentages are model assumptions, not sourced market data; they are present only as bounded defaults so the scenario TCO output above is reproducible. Only the numbers in the two computed tables (TCO summary and year-by-year cash flow) are computed.

4 — OpEx breakdown (annual, per 2 MWh LFP container)

Line itemDriverAnnual (USD)Source
Augmentation / capacity refresh reserve~1.5% of EXW per year, until cycle warranty end5,800Model assumption (cycle warranty: confirm against CATL EnerC datasheet)
Service & extended warranty (OEM or 3rd-party)Per OEM service contract4,500 – 9,000Model assumption; OEM to confirm in RFQ response
HVAC electricity (thermal losses + cooling)~3–5% of stored throughput3,200Model assumption
Insurance (all-risk, post-DLP)~0.4% of replacement value2,000Model assumption
Remote O&M, EMS licence, cellular linkAnnual subscription1,800Model assumption
Spare parts holding (modules, contactors, sensors)Recommended ~2% of CAPEX7,700Model assumption
Cybersecurity & audits (datacenter)Annual1,500Model assumption
Decommissioning reserve (per Turkish EPR if applicable)Linear over life3,200Model assumption
Total OpEx — illustrative mid-point (matches year-1 cost row of USD 29,700 in computed cash-flow table)~ 29,700 / yrModel assumption (anchored to the computed Year-1 cost row)

5 — Compliance, certifications and shipping (with citations)

AreaWhat to requestIssuer / standardCitationCert #
Cell safety (industrial)IEC 62619 test report for the LFP cells usedIEC (IEC 62619:2022)IEC Webstore — IEC 62619:2022To be supplied by OEM with RFQ response (not pre-verified)
Transport (sea / road)UN 38.3 test summary + DG packing certificate (Class 9, UN3480)UN / IMO IMDG Code (UN Manual of Tests and Criteria, Rev. 7, §38.3)UNECE — Manual of Tests and CriteriaTo be supplied by OEM with RFQ response (not pre-verified)
Stationary storage performanceUL 1973 (Batteries for Use in Stationary Applications)UL 1973UL Standards — UL 1973 product pageTo be supplied by OEM with RFQ response (not pre-verified)
Cabinet-level fire testUL 9540A test summary for the full cabinet (where required by AHJ)UL 9540AUL Standards — UL 9540A product pageTo be supplied by OEM with RFQ response (not pre-verified)
EMC / safety for the cabinetCE Declaration of Conformity against applicable EU directives; IECEE CB scheme acceptance in TRCE / IECEE CBIECEE — CB SchemeTo be supplied by OEM with RFQ response (not pre-verified)
Performance (alternative)IEC 62620 (secondary lithium cells for industrial applications)IEC 62620IEC Webstore — IEC 62620To be supplied by OEM with RFQ response (not pre-verified)
HS classificationLithium-ion accumulators — HS 8507.60WCO Harmonized System 2022WCO — HS 2022 Nomenclature; verify the TR 12-digit national line at gtb.tariff.trn/a (classification)
Grid connection (TR)Confirm with TEİAŞ (Turkish TSO) and the relevant DSO for LV/MV interconnectNational grid codeTEİAŞ corporate siteProject-specific

No certificate numbers are pre-verified on this page. The OEM will return certificate numbers, issuing body names (e.g. TÜV Rheinland, TÜV SÜD, UL, DNV) and validity dates with the RFQ response datasheet pack.

6 — Duty-stack block (Turkey / TR)

HS national line Program Rate As-of SoT
To be confirmed under HS 8507.60 (lithium-ion accumulators) at the TR 12-digit level Customs import duty (ad valorem or mixed) PENDING — lookup at gtb.tariff.tr 2026-09-21 PENDING
Same HS 8507.60 line Additional duties (if any: safeguard, anti-dumping, excise) PENDING — lookup at gtb.tariff.tr 2026-09-21 PENDING
n/a (consumption tax) VAT (KDV) computed on (CIF + duty + additional duties) PENDING — lookup at gtb.tariff.tr 2026-09-21 PENDING
Duty-stack block header — HS national line  |  Program  |  As-of: 2026-09-21  |  SoT: PENDING
Official portal to confirm: T.C. Ticaret Bakanlığı — Gümrük Tarife bilgi bankası (Turkish Ministry of Trade, tariff and origin portal) — gtb.tariff.tr. Basis: WCO Harmonized System 2022 heading 8507.60 — Lithium-ion accumulators (WCO HS 2022). The exact TR 12-digit national line, applicable import duty, any safeguard / additional duty measures, and the KDV rate must be confirmed there before any commercial quotation.
Action for the buyer: add the confirmed HS national line, program name and percentage to the table above, then re-run the payback math with the duty + KDV included. Per Tradvolt policy, no rate is hardcoded into this page — it is the buyer's responsibility (or their customs broker's) to fix the rate at the time of quotation.

Request Quote — replies in 48h

Submit your requirements. A Tradvolt export manager confirms specs, OEM options, lead-time and a firm CIF Istanbul / DAP site price within two business days. Form posts to /rfq/ on the tradvolt.com site.

Download spec & datasheet (PDF)

Spec & datasheet download

Get the OEM datasheet pack (cell spec, BMS topology, thermal design, cycle warranty, type-test summaries). The PDF below is a live, served file on the tradvolt.com domain and is updated whenever the OEM issues a new revision.

Download spec & datasheet (PDF)

If the link returns 404, the OEM has not yet uploaded a current revision; use the RFQ form above to request the latest revision by email.

7 — Frequently asked questions

What is the TCO verdict for a CATL EnerC+ 2 MWh LFP BESS imported into Turkey over 25 years?

The scenario TCO model returns NPV = −USD 519,770, simple payback = none within the 25-year horizon, discounted payback = none within the horizon, and LCOS = USD 0.2307 / kWh at an 8% discount rate. See the TCO summary table on this page.

Which exact product model is being quoted?

CATL EnerC+ (EnerC Plus) containerised LFP BESS, ~2 MWh per 20 ft ISO container, manufactured by Contemporary Amperex Technology Co., Limited. See the CATL EnerC product page for cell chemistry, cabinet ratings and cooling topology.

What HS code applies to a CATL EnerC+ LFP container imported into Turkey?

Lithium-ion accumulators classify under HS 8507.60 (WCO Harmonized System 2022, see the WCO HS 2022 nomenclature). The Turkish 12-digit national subheading, customs duty, any additional duties and the KDV rate must be confirmed at the T.C. Ticaret Bakanlığı tariff portal (gtb.tariff.tr) before quoting.

Is a 2 MWh container BESS one shipping unit or two?

A CATL EnerC+ is typically delivered as a single 20 ft ISO container with integrated BMS, HVAC, liquid cooling and fire suppression. The unit definition must be confirmed against the OEM datasheet returned with the RFQ response.

Which certifications should I request from the OEM before shipment?

Typical request set: IEC 62619 for industrial LFP cells, UN 38.3 for transport, UL 1973 for stationary performance, a UL 9540A cabinet-level fire test summary, and a CE / IECEE CB declaration where required. Always reconcile with your compliance team against Turkish grid code and datacenter operator requirements. No certificate numbers are pre-verified on this page.

How is landed cost for an LFP BESS into Turkey usually built up?

EXW or FOB China unit price + sea freight on a 20/40 ft FCL + marine insurance + Turkish import duty (HS 8507.60) + any additional duties + KDV VAT + port handling + customs broker fee + inland road transport to site + civil works and commissioning. Each line should be quoted per shipment.

Why are the CapEx / OpEx inputs labelled as model assumptions?

OEM pricing varies with cell supplier, BMS architecture, cycle warranty and order size; Turkish duty and KDV rates, and shipping costs, change with each quote. The cell/BoS/freight/OpEx envelopes on this page are bounded model assumptions so that the scenario TCO output above is reproducible. Only the numbers in the TCO summary table and the year-by-year cash flow table are computed.

Can Tradvolt ship to inland Turkish datacenters, not just ports?

Yes, Tradvolt can arrange DAP or DDP incoterms to inland sites subject to a road-access survey, oversize/overweight permits for the BESS container, and a route survey. Use the RFQ form on this page with destination_country set to TR and a city or site code.