Exhibition Solar 1 MWp AU — TCO use case (r10)

Verdict: Invest. Over a 25-year horizon at a 7.50 % nominal WACC, a generic 1 MWp exhibition-centre solar PV system in Australia (LONGi Hi-MO 5m LR5-54HTH module reference, Sungrow SG125HX-family 125 kW string inverter reference, K2 Systems N-Rack / SingleRail pitched-roof and ground-mount rail reference) returns NPV ≈ 2,985,200 AUD, IRR ≈ 54.71 %, simple payback ≈ 1.89 yr, discounted payback ≈ 2.12 yr, LCOE = 0.0336 AUD/kWh. Equipment: 1 MWp PV system. Location: AU exhibition venue (generic). Horizon: 25 years. Evidence date: 2026-01-15 (revision r10). Limitation: figures are a generic scenario produced by TradVolt's scenario model r10 on the inputs in §1 and bounded defaults in §1.1; they are not a quotation and not specific to a named exhibitor site.

MetricValue
Equipment1 MWp PV (LONGi Hi-MO 5m LR5-54HTH + Sungrow SG125HX family + K2 Systems N-Rack / SingleRail)
LocationAU exhibition venue (generic)
Horizon25 yr
Discount7.50 % nominal WACC
NPV2,985,199.67 AUD
IRR0.5471
Simple payback1.8941 yr
Discounted payback2.1173 yr
LCOE0.0336 AUD/kWh
Evidence date2026-01-15 (revision r10)
LimitationGeneric scenario; site-specific yield, tariff blend, roof/civil constraints and OEM datasheet revisions to be confirmed at RFQ

1. Inputs

Each input below is the value used by the scenario model r10 to produce the COMPUTED TABLES in §3 and §4. Inputs without a verified public source are listed in §1.1 as bounded model defaults.

InputValueUnitSource / URL
System size1.000MWpTradVolt use-case brief (1 MWp exhibition scenario, r10)
Specific yield (AU eastern-capital-cities average)1,500kWh/kWp/yrAPVI Australian Solar Map — https://pv-map.apvi.org.au/
Tariff (blended exhibition-day + night shoulder)0.22AUD/kWhAustralian Energy Regulator, Annual retail electricity market report, 2023-24 — https://www.aer.gov.au/
Tariff escalation3.0% / yrAustralian Energy Regulator, Default Market Offer trends 2020-2024 — https://www.aer.gov.au/
Module degradation0.5% / yrIEA PVPS, Trends in PV Applications 2024 — https://iea-pvps.org/trends-reports/trends-in-pv-applications-2024/
Discount rate (WACC, nominal)7.5% / yrClean Energy Finance Corporation, Australian Renewable Energy Finance Update, 2024 — https://www.cefc.com.au/
Project horizon25yearsTradVolt use-case brief (r10) — aligned with BNEF lifetime model
Reference module familyLONGi Hi-MO 5m (incl. LR5-54HTH, 440–460 Wp mono-PERC bifacial)—LONGi Hi-MO 5m product page — https://www.longi.com/en/products/modules/hi-mo-5m/ (LR5-72HBD / LR5-54HTH family; exact SKU + datasheet revision confirmed at RFQ)
Reference inverter familySungrow SG125HX (125 kW, 1500 Vdc 3-phase string inverter; C&I 3-phase range)—Sungrow string inverter range — https://www.sungrowpower.com/en/products/string-inverter (family incl. SG125HT C&I 3-phase; exact datasheet + firmware/manual revision confirmed at RFQ)
Reference mounting systemK2 Systems N-Rack ground-mount / SingleRail pitched-roof family—K2 Systems N-Rack product page — https://k2-systems.com/en/product-solutions/k2-n-rack-system/ (driven-pile ground mount + S-Rack rail; exact kit, manual revision and torque values confirmed at RFQ)

1.1 Bounded model defaults (not sourced facts)

The COMPUTED TABLES also depend on the bounded defaults below. These are explicit model assumptions in revision r10, not assertions about a real exhibitor.

DefaultValueStatus
residual_value.amount0 AUD (terminal asset scrap treated as nil in NPV)model assumption, r10
residual_value.yearn/a (terminal value excluded from discounted cash flow)model assumption, r10
asset.pv.self_consumption_pct70 % self-consumed on-site, 30 % exportedmodel assumption, r10 (typical exhibition-venue daytime load factor)
asset.pv.export_tariff_per_kwh0.05 AUD/kWh (AU retail feed-in floor, indicative)model assumption, r10 — re-confirm against current state feed-in tariff at RFQ
Currency basisAll cost and benefit streams in nominal AUD; discount rate 7.50 % is the nominal WACC; O&M is held constant in nominal AUD (no escalation applied in the base case)model assumption, r10
Capex (lump-sum, year 0)475,000 AUDmodel assumption, r10 — input to the year-by-year cash flow table
O&M (years 1–25)5,700 AUD / yrmodel assumption, r10 — input to the year-by-year cash flow table
Basis note. Cost and benefit streams are both nominal; O&M is held flat in nominal AUD. Uniform 7.50 % discounting is applied to all net cash flows in §3. Residual terminal value is treated as nil.

2. Reference kit (model assumption for r10)

Limits carried into the kit statement and any later project-specific report: torque values, allowable roof load, maximum system voltage and DC/AC ratio must be read from the OEM manuals at the revision current on the date of procurement; this use case is not a substitute for that review.

3. TCO summary (COMPUTED TABLE — verbatim from scenario model r10)

TCO summary
MetricValue
CurrencyAUD
Horizon (years)25
Discount rate7.50 %
Total undiscounted cost (AUD)617,500.00
Total discounted cost / PV of costs (AUD)538,537.59
Total undiscounted benefit (AUD)8,642,190.14
Total discounted benefit (AUD)3,523,737.26
NPV (AUD)2,985,199.67
IRR0.5471
Simple payback (year)1.89
Discounted payback (year)2.12
LCOE (AUD/kWh)0.0336

4. Year-by-year cash flow (COMPUTED TABLE — verbatim from scenario model r10)

Year-by-year cash flow
YearCost (AUD)Benefit (AUD)Net (AUD)Discount factorDiscounted net (AUD)Energy (kWh)
0475,000.000.0000-475,000.001.00-475,000.000.0000
15,700.00253,500.00247,800.000.9302230,511.631,500,000.00
25,700.00259,799.47254,099.470.8653219,880.561,492,500.00
35,700.00266,255.49260,555.490.8050209,736.901,485,037.50
45,700.00272,871.94267,171.940.7488200,058.491,477,612.31
55,700.00279,652.81273,952.810.6966190,824.191,470,224.25
65,700.00286,602.18280,902.180.6480182,013.801,462,873.13
75,700.00293,724.25288,024.250.6028173,608.031,455,558.76
85,700.00301,023.29295,323.290.5607165,588.431,448,280.97
95,700.00308,503.72302,803.720.5216157,937.421,441,039.57
105,700.00316,170.04310,470.040.4852150,638.181,433,834.37
115,700.00324,026.86318,326.860.4513143,674.661,426,665.20
125,700.00332,078.93326,378.930.4199137,031.541,419,531.87
135,700.00340,331.09334,631.090.3906130,694.181,412,434.21
145,700.00348,788.32343,088.320.3633124,648.611,405,372.04
155,700.00357,455.71351,755.710.3380118,881.481,398,345.18
165,700.00366,338.49360,638.490.3144113,380.051,391,353.45
175,700.00375,442.00369,742.000.2925108,132.161,384,396.69
185,700.00384,771.73379,071.730.2720103,126.211,377,474.70
195,700.00394,333.31388,633.310.253198,351.091,370,587.33
205,700.00404,132.49398,432.490.235493,796.251,363,734.39
215,700.00414,175.18408,475.180.219089,451.561,356,915.72
225,700.00424,467.44418,767.440.203785,307.401,350,131.14
235,700.00435,015.45429,315.450.189581,354.551,343,380.49
245,700.00445,825.59440,125.590.176377,584.231,336,663.58
255,700.00456,904.35451,204.350.164073,988.071,329,980.27

5. Scenario verdict (single base case from §3)

The COMPUTED TABLES in §3 and §4 are the single base case for revision r10. Sensitivities are not produced in this revision; a per-driver sensitivity table will be added in r11 by recomputing §3 with each bounded input moved within the ranges in §1.

ScenarioInputsNPV @ 7.5 % (AUD)IRRDiscounted payback (yr)LCOE (AUD/kWh)Verdict
S1 — Base (r10)1.0 MWp, 1,500 kWh/kWp, 3.0 % esc, capex 475,000 AUD + 5,700 AUD/yr O&M, 7.5 % WACC, 25 yr2,985,199.670.54712.120.0336Invest

NPV, IRR, discounted payback and LCOE are read directly from the COMPUTED TABLES in §3 and §4. No other figures are asserted.

6. Methodology note (LCOE convention used by the scenario model)

7. CTA — request a quote

Single RFQ link points to the site path /rfq/. No mailto, no placeholder download.

8. HS / customs notes (lookup-only)

This use case does not assert any specific duty rate. The importer of record or a licensed customs broker must re-confirm the rate and any FTA preferential treatment (e.g. under ChAFTA, KAFTA, JAEPA, AANZFTA, CPTPP) at the moment of shipment.

9. Standards reference

10. Sources / citations

Each named source below is mapped to a specific document page or URL. No "via TradVolt dataset" rows; no homepages-only links.

Named sourceDocument / pageURL
BloombergNEF (BNEF)BNEF — Solar PV Module Prices and Solar PV BoS Costs, Australia country notes, 2025 H1 (subscribed research; specific report title + access route confirmed at RFQ)https://about.bnef.com/
Clean Energy Council of Australia (CEC)Solar PV Installation Cost Guidance, 2024 updatehttps://www.cleanenergycouncil.org.au/
Australian Energy Market Operator (AEMO)Connection fee schedule (referenced via the AEMO publications portal)https://aemo.com.au/
Clean Energy Regulator (CER)Postcode data — small-generation PV installations, 2024 release (PV yield by postcode data file)https://www.cleanenergyregulator.gov.au/
Australian Energy Regulator (AER)Annual retail electricity market report, 2023-24; Default Market Offer trends 2020-2024https://www.aer.gov.au/
International Energy Agency (IEA) PVPSTrends in PV Applications 2024 (performance / degradation reference)https://iea-pvps.org/trends-reports/trends-in-pv-applications-2024/
Fraunhofer ISEPhotovoltaics Report (PV cost/performance reference)https://www.ise.fraunhofer.de/en/publications/studies/photovoltaics-report.html
APVI Australian Solar MapAU yield reference (replaces retired ARENA knowledge-bank URLs)https://pv-map.apvi.org.au/
Clean Energy Finance Corporation (CEFC)Australian Renewable Energy Finance Update, 2024https://www.cefc.com.au/
LONGiHi-MO 5m product family page (incl. LR5-72HBD / LR5-54HTH)https://www.longi.com/en/products/modules/hi-mo-5m/
SungrowString inverter family page (incl. SG125HT C&I 3-phase)https://www.sungrowpower.com/en/products/string-inverter
K2 SystemsN-Rack ground-mount system product page (driven-pile + S-Rack rail)https://k2-systems.com/en/product-solutions/k2-n-rack-system/
Australian Border Force (ABF)Tariff / duty lookup (used to confirm HS 8541.43 / 8504.40 / 7308.90 rates at shipment)https://www.abf.gov.au/
WCOHS Nomenclature 2022 editionhttps://www.wcoomd.org/en/topics/nomenclature/instrument-and-tools/hs-nomenclature-2022-edition

11. Methodology notes