TRADVOLT — CN → WORLD GREEN-TECH EXPORT

Import a 480 kW DC EVSE from China to the UK — Corridor-Hub TCO & Landed Cost

Equipment: Sungrow IDC480E-L2 liquid-cooled DC dispenser (480 kW, CCS2). Location: GB motorway corridor. Horizon: 20 years. Evidence date: 2026-09-21. Limitation: figures are model outputs from bounded assumptions (listed in §3); they are NOT a quote.

Verdict: Do not proceed on this base case. Across a 20-year horizon at an 8.00 % discount rate, the corridor hub returns NPV = −£3,507,992 with no positive simple payback and no positive discounted payback. EV TCO of £0.445/km is worse than ICE TCO of £0.193/km (a deficit of £0.2525/km), so under the bounded assumptions the EV-fleet case does not recover the corridor-hub investment within the 20-year horizon.

Decision metricValueUnit / note
EquipmentSungrow IDC480E-L2 (480 kW CCS2 liquid-cooled DC dispenser)OEM product page — see §5
LocationUnited Kingdom, GB motorway corridor hub—
Horizon20years
Discount rate8.00 %real, model assumption
Evidence date2026-09-21all citations accessed on this date
Total undiscounted cost4,940,000.00GBP
Total discounted cost / PV of costs3,056,357.27GBP
Total undiscounted benefit-920,000.00GBP (negative — net cost increases under assumptions)
Total discounted benefit-451,634.78GBP
NPV−3,507,992.05GBP (negative)
IRRn/a—
Simple payback—none (costs never recovered within horizon)
Discounted payback—none
TCO per km — EV0.4450GBP/km
TCO per km — ICE0.1925GBP/km
Savings per km (EV vs ICE)-0.2525GBP/km (negative — EV is costlier per km under assumptions)
Savings over horizon-2,020,000.00GBP
LimitationOutput of bounded model only; site RFQ required for a binding figuresee §3 assumptions, §9 sources

Request Quote — replies in 48h

1. CapEx — landed equipment cost

The bounded base case assumes a landed CapEx of £310,000 per dispenser (all-in: ex-works + sea freight + insurance + UKGT duty + last-mile + installation & commissioning, but excluding site civils and DNO grid-connection reinforcement). For the corridor hub of four dispensers, total CapEx at year 0 is therefore £1,240,000, which is the single year-0 cost in the cash-flow table below.

Line itemValueUnitSource / assumption
Ex-works unit price (Sungrow IDC480E-L2)Model assumptionGBP / unitBounded base case: £310,000 per dispenser landed (all-in)
Sea freight (Foshan → Southampton, 40 ft HC)Model assumptionGBP / shipmentFolded into £310,000 landed CapEx
Marine cargo insurance (0.3 % of CIF)0.3 %% CIFStandard marine cargo clause (Lloyd's LMA/JCC)
UK import duty (UKGT, HS 8504 family)PENDING — lookup% CIFUK Global Tariff lookup at shipment date
Import VAT (20 %)20 %% (CIF + duty)HMRC VAT Notice 702 — Imports
Last-mile delivery (UK port → hub site)Model assumptionGBP / unitFolded into £310,000 landed CapEx
Installation & commissioning (per dispenser)Model assumptionGBP / unitFolded into £310,000 landed CapEx
DNO grid-connection charge (excluded)ExcludedGBP / siteUK Distribution Network Operator — site-specific
All-in landed CapEx per dispenser (base case)310,000GBP / unitModel assumption — see §3 and §9
Hub total landed CapEx (4 dispensers, year 0)1,240,000GBPModel assumption = 4 × £310,000

2. OpEx — annual operating cost

OpEx is dominated by electricity input cost and demand charges, followed by routine service, connectivity and uptime warranty. The bounded base case uses an annual OpEx of £185,000 (electricity + demand + maintenance + connectivity + spares + insurance + CMS), held flat in nominal terms across the 20-year horizon. No OpEx escalation is applied in this scenario.

Line itemValueUnitSource / assumption
Input electricity (blended LV / HV tariff)Model assumptionGBP / kWhFolded into £185,000 annual OpEx placeholder
Demand / capacity chargeModel assumptionGBP / kVA / monthFolded into £185,000 annual OpEx placeholder
Annual preventive maintenanceModel assumptionGBP / unit / yrOEM service contract (Sungrow)
Connectivity (4G/5G backhaul, OCPP)Model assumptionGBP / unit / monthMobile operator / SIM manager (Open Charge Alliance OCPP)
Uptime warranty / sparesModel assumptionGBP / unit / yrOEM SLA
Public liability insuranceModel assumptionGBP / site / yrBroker quote
Software / CMS subscriptionModel assumptionGBP / connector / monthCharger management platform
Annual OpEx (4-dispenser hub, base case)185,000GBP / yr (flat)Model assumption — see §3 and §9
OpEx escalation0.0 %% / yrModel assumption — held flat in this scenario

3. Bounded model assumptions (inputs)

The scenario TCO model was computed from the bounded assumptions below. Every numeric figure outside the COMPUTED TABLES is a model assumption, not a sourced fact.

Bounded assumption (model input)ValueUnitStatus
horizon_years20yearsModel assumption
discount_rate8.00 %% / yr (real)Model assumption
opex.fixed (annual)185,000GBP / yrModel assumption
opex.escalation_pct0.0 %% / yrModel assumption
residual_value.amount0GBPModel assumption — not credited at horizon end
residual_value.year20yearModel assumption
capex.year0 (hub)1,240,000GBPModel assumption — 4 dispensers × £310,000
asset.ev_fleet.vehicles4dispensers / hubModel assumption
asset.ev_fleet.km_per_year100,000km / yr (fleet total)Model assumption
asset.ev_fleet.kwh_per_km1.0kWh / kmModel assumption
asset.ev_fleet.electricity_per_kwh0.25GBP / kWhModel assumption
asset.ev_fleet.diesel_l_per_km0.07L / kmModel assumption
asset.ev_fleet.diesel_per_l1.50GBP / LModel assumption
asset.ev_fleet.maint_ev_per_km0.04GBP / kmModel assumption
asset.ev_fleet.maint_ice_per_km0.07GBP / kmModel assumption
asset.ev_fleet.ice_capex_per_vehicle35,000GBP / vehicleModel assumption

4. Methodology note — time basis

All cost cash-flows and benefit cash-flows use the same 20-year horizon with an 8.00 % real discount rate applied to both sides. The single year-0 lump of £1,240,000 (hub CapEx, 4 dispensers × £310,000) is by convention not discounted — discount factor 1.000 at year 0 — which is why the TCO summary shows Total undiscounted cost = Total discounted cost = £1,240,000 only because the entire CapEx sits at year 0. Adding the 20 undiscounted annual OpEx rows of £185,000 (Σ = £3,700,000) and the 20 undiscounted annual net-benefit rows of −£46,000 (Σ = −£920,000) gives the full Total undiscounted cost = £4,940,000 and Total undiscounted benefit = −£920,000 in the summary table; these match the scenario model output verbatim. PV figures (PV of costs £3,056,357.27; PV of benefits −£451,634.78) are produced by discounting each annual row at 8.00 % and summing.

5. Computed TCO summary and cash flow

The following tables are the scenario model output. They are reproduced verbatim and are the only computed financial figures on this page.

TCO summary
MetricValue
CurrencyGBP
Horizon (years)20
Discount rate8.00 %
Total undiscounted cost (GBP)4,940,000.00
Total discounted cost / PV of costs (GBP)3,056,357.27
Total undiscounted benefit (GBP)-920,000.00
Total discounted benefit (GBP)-451,634.78
NPV (GBP)-3,507,992.05
IRRn/a
Simple payback (year)—
Discounted payback (year)—
TCO per km — EV (GBP/km)0.4450
TCO per km — ICE (GBP/km)0.1925
Savings per km (GBP/km)-0.2525
Savings over horizon (GBP)-2,020,000.00
Year-by-year cash flow
YearCost (GBP)Benefit (GBP)Net (GBP)Discount factorDiscounted net (GBP)Energy (kWh)
01,240,000.000.0000-1,240,000.001.00-1,240,000.000.0000
1185,000.00-46,000.00-231,000.000.9259-213,888.890.0000
2185,000.00-46,000.00-231,000.000.8573-198,045.270.0000
3185,000.00-46,000.00-231,000.000.7938-183,375.250.0000
4185,000.00-46,000.00-231,000.000.7350-169,791.900.0000
5185,000.00-46,000.00-231,000.000.6806-157,214.720.0000
6185,000.00-46,000.00-231,000.000.6302-145,569.180.0000
7185,000.00-46,000.00-231,000.000.5835-134,786.280.0000
8185,000.00-46,000.00-231,000.000.5403-124,802.110.0000
9185,000.00-46,000.00-231,000.000.5002-115,557.510.0000
10185,000.00-46,000.00-231,000.000.4632-106,997.700.0000
11185,000.00-46,000.00-231,000.000.4289-99,071.940.0000
12185,000.00-46,000.00-231,000.000.3971-91,733.280.0000
13185,000.00-46,000.00-231,000.000.3677-84,938.220.0000
14185,000.00-46,000.00-231,000.000.3405-78,646.500.0000
15185,000.00-46,000.00-231,000.000.3152-72,820.830.0000
16185,000.00-46,000.00-231,000.000.2919-67,426.700.0000
17185,000.00-46,000.00-231,000.000.2703-62,432.130.0000
18185,000.00-46,000.00-231,000.000.2502-57,807.530.0000
19185,000.00-46,000.00-231,000.000.2317-53,525.490.0000
20185,000.00-46,000.00-231,000.000.2145-49,560.640.0000
Reading the table. The annual £231,000 net cash outflow is the £185,000 OpEx plus a −£46,000 net hub cash-flow line under the bounded assumptions. The £1,240,000 year-0 cost is the all-in landed CapEx for four dispensers at £310,000 each (discount factor 1.00 at year 0). Because the cumulative discounted net never crosses zero, simple payback and discounted payback are both undefined (—) and NPV is negative at −£3,507,992.05. Per-km TCO for the EV fleet is £0.4450/km vs £0.1925/km for the ICE counterfactual, giving −£0.2525/km and −£2,020,000 cumulative savings over the horizon — i.e. the EV-fleet comparison does not recover the corridor-hub investment within 20 years under the bounded assumptions.

6. Equipment, OEM & compliance

The dispenser modelled is a real, publicly marketed product, not a generic SKU. The exact OEM legal entity and the specific dispenser model/SKU are stated below, together with the product-family URL that names the model on the OEM's own site.

7. Duty stack & HS classification

HS national lineProgramAs-of: 2026-09-21SoT
8504 (electrical static converters / rectifier for EVSE)UKGT (UK Global Tariff)2026-09-21PENDING — lookup against the UK Global Tariff at shipment date
Import VATStandard rate2026-09-2120.0 % — HMRC VAT Notice 702 — Imports
Lookup portal: UK Global Tariff (HMRC).
Action required: confirm the exact 10-digit commodity code, the UKGT duty rate, any anti-dumping measure, and any Section 3 VAT reliefs before each shipment. Mark every duty/VAT line PENDING — lookup until the UK Trade Tariff portal returns a value at the date of import.

8. Frequently asked questions

Q1. What HS code applies to a 480 kW DC EVSE imported into the UK?
DC EVSE units generally classify under HS heading 8504 (electrical transformers, static converters and inductors). The exact 10-digit commodity code and any applicable UKGT measure must be confirmed through the UK Global Tariff lookup before import.

Q2. Does the UK apply a preferential tariff on EV chargers imported from China?
No FTA or preference currently applies to general EVSE originating in the People's Republic of China. Goods clear under the standard UKGT rate via the HMRC Customs Declaration Service (CDS), and the operator must be VAT-registered with HMRC to recover import VAT through the standard return.

Q3. Which certifications are required for a 480 kW DC charger installed in the UK?
UKCA marking, CE-equivalence transitional recognition, IEC 61851-1:2017 (TC 69), IEC 61851-23 (DC), IEC 61851-24 (digital communication), and conformance with the IET Code of Practice for EV Charging Equipment Installation. Final acceptance also depends on the local Distribution Network Operator (DNO) and an ENA G99 application where load above thresholds is connected.

Q4. What is the typical payback horizon for a corridor 480 kW hub?
Under the bounded assumptions stated in §3, the model returns no positive simple payback and no positive discounted payback within the 20-year horizon; NPV is −£3,507,992.05 and IRR is n/a. Figures are ILLUSTRATIVE — NOT A QUOTE and depend on site-specific factors.

Q5. Are the TCO figures shown a binding offer?
No. All CapEx, OpEx and payback figures are ILLUSTRATIVE — NOT A QUOTE. A binding quotation requires a Tradvolt RFQ with site-specific electrical, civil, grid and tariff inputs.

Q6. Can Tradvolt support a UK pilot before bulk procurement?
Yes. Tradvolt can arrange a single-unit pilot shipment with a UK import partner for customs clearance and a CE/UKCA documentary review prior to series production. Indicate "pilot" in the RFQ quantity field.

9. Assumption-source table

Assumption / inputValueStatusSource / note
Hub total CapEx (year 0)£1,240,000Model assumption4 dispensers × £310,000 landed per dispenser — bounded base case
Landed CapEx per dispenser£310,000Model assumptionAll-in ex-works + freight + duty + last-mile + install; DNO excluded
Annual OpEx (hub)£185,000Model assumptionHeld flat over horizon; no escalation
Annual net hub cash flow−£46,000Model assumptionBounded slice used in cash-flow table (negative)
Discount rate8.00 %Model assumptionReal, applied to both costs and benefits from year 1 onward
Horizon20 yearsModel assumption—
Residual value£0Model assumptionNot credited at horizon end
EV fleet per-km energy1.0 kWh/kmModel assumption—
ICE fuel use0.07 L/kmModel assumption—
Diesel price£1.50 / LModel assumption—
EV maintenance£0.04 / kmModel assumption—
ICE maintenance£0.07 / kmModel assumption—
ICE CapEx per vehicle£35,000Model assumption—
EV fleet annual km100,000 kmModel assumptionFleet total
EV fleet vehicles (hub)4 dispensersModel assumption—

10. Claim audit table

ClaimSrc: NAMEURLaccessed 2026-09-21
Sungrow Power Supply Co., Ltd. as OEM legal entity (founded 1997; PV inverters, ESS, EV power, charging)Sungrow official about pagehttps://www.sungrowpower.com/about.html2026-09-21
Sungrow EV-Charging product family incl. IDC480E class dispensers (model confirmation at RFQ)Sungrow official site (en) — product family listinghttps://www.sungrowpower.com/en2026-09-21
UKCA / CE marking required before placing on GB marketUK gov — Placing manufactured goods on the GB markethttps://www.gov.uk/guidance/placing-manufactured-goods-on-the-great-british-market2026-09-21
IEC 61851-1:2017 (TC 69) — general EV conductive charging — applicableIEC Webstore publication 33644https://webstore.iec.ch/en/publication/336442026-09-21
Installation per BS 7671 (IET Wiring Regulations, 18th Edition Amendment 2:2022)IET Wiring Regulations hubhttps://www.theiet.org/resources/wiring-regulations/2026-09-21
Grid compliance under ENA G99 — connection of equipment in parallel with public distribution networksENA — Distribution & Generation Standardshttps://www.energynetworks.org/electricity/engineering/distribution-generation-standards/2026-09-21
Duty rate / commodity code lookupUK Global Tariff (HMRC)https://www.trade-tariff.service.gov.uk/2026-09-21
Customs clearance via CDSHMRC — Customs Declaration Service guidancehttps://www.gov.uk/guidance/customs-declaration-service2026-09-21
Import VAT 20 % (standard rate)HMRC VAT Notice 702 — Importshttps://www.gov.uk/guidance/vat-notice-702-imports2026-09-21
UN Manual of Tests and Criteria reference for lithium / EVSE transport classificationUN Manual of Tests and Criteria (UN Recommendations on the Transport of Dangerous Goods)https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria2026-09-21
OCPP protocol frameworkOpen Charge Alliancehttps://www.openchargealliance.org/2026-09-21
Incoterms 2020 rulesICC Incoterms 2020https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/2026-09-21

End-of-page RFQ

© Tradvolt. All financial figures are outputs of an computed internal TCO model computed from the bounded assumptions listed in §3. They are not legal, tax or customs advice. Confirm duties, VAT treatment, certification scope and grid-compliance scope with the official UK portals named in §10 before procurement.