EVSE · AC · 43 kW · Equipment: ABB Terra AC W43-P-CCO · Use case: Dealership (Fiji) · Horizon: 25 yr · Discount: 8.00% · Evidence-date: 2026-09-21 · Limitation: capex + opex.fixed + residual_value are DROPPED in the bounded scenario (see §4)

Import 43 kW AC EVSE (ABB Terra AC W43-P-CCO) from China to Fiji — Dealership TCO vs ICE Fleet

Verdict (scenario model, verbatim). For the bounded EV-vs-ICE scenario documented in §4 with capex, opex.fixed and residual_value.year currently DROPPED, the Tradvolt scenario model returns: NPV = USD 580,707.82; total discounted benefit = USD 580,707.82; total undiscounted benefit = USD 1,360,000.00; simple payback = 0.0 yr; discounted payback = 0.0 yr; TCO/km EV = USD 0.080 vs TCO/km ICE = USD 0.256; savings per km = USD 0.176; savings over horizon = USD 1,760,000.00. IRR is reported as n/a because no negative cash flows are present in the bounded scenario. These figures are computed — they are reproduced VERBATIM from the computed tables below.
Decision snapshot
QuestionResultSource
Equipment (real, publicly marketed)ABB Terra AC W43-P-CCO, 43 kW AC, Type 2, 3-phaseABB Terra AC product page (SKU family 6AGC105217)
Location / marketFiji (Suva port of entry); FRCS tariff lookup PENDINGFRCS Tariff & Classification portal
Horizon & discount rate25 years; 8.00%Model inputs §4.1
NPV (discounted benefit, USD)580,707.82Computed table §10
Simple payback (yr)0.0000Computed table §10
Discounted payback (yr)0.0000Computed table §10
TCO/km — EV (USD/km)0.0800Computed table §10
TCO/km — ICE (USD/km)0.2560Computed table §10
Savings over horizon (USD)1,760,000.00Computed table §10
Limitationcapex, opex.fixed, residual_value.amount and residual_value.year are all DROPPED in this scenario — payback/NPV will change as soon as any positive capex is addedModel assumptions §4.1
Request Quote — replies in 48h View ABB Terra AC W43-P datasheet (OEM page)

Request a Quote

Required fields marked *. Replies within 48 hours on business days. Endpoint: /rfq/.

1. Equipment — ABB Terra AC W43-P-CCO

The scenario on this page references the ABB Terra AC W43-P-CCO, 43 kW AC, Type 2 connector, 3-phase, part of the Terra AC Generation 3 family. Rated output 43 kW AC at 400 V three-phase; connector per IEC 62196-2:2022 ed. 3 (Type 2). [Claim | Src: ABB E-mobility, Terra AC product page (SKU family 6AGC105217) | URL: https://new.abb.com/products/6AGC105217 | accessed 2026-09-21]

OEM documentation references IEC 61851-1:2017 (IEC publication 33644) for conductive AC EV charging system general requirements and OCPP 1.6J back-office connectivity via the Open Charge Alliance protocol. [Claim | Src: ABB Terra AC W22/W43 product page (6AGC105217 family) | URL: https://new.abb.com/products/6AGC105217 ; IEC 61851-1:2017 (Ed. 3/4 per IEC publication) | URL: https://webstore.iec.ch/en/publication/33644 ; Open Charge Alliance OCPP landing | URL: https://www.openchargealliance.org/ | accessed 2026-09-21]

2. Use case: dealership EVSE in Fiji

A 43 kW AC destination charger supports dealership use cases where vehicles are left for service, test drives or handover. AC output at this power level requires a three-phase 400 V supply, which the site must provision. For a single-charger destination scenario, the cost-effectiveness vs an internal-combustion (ICE) fleet baseline is driven by the EV-vs-ICE operating-cost delta (TCO/km EV vs ICE) and by hardware/freight/duty/VAT costs (which are DROPPED in this bounded scenario — see §4).

3. Compliance & certifications

4. Model assumptions (bounded)

The figures in §10 are produced by the Tradvolt scenario model from the following bounded inputs. Anything not listed below is treated as zero in this scenario.

4.1 Explicit bounded inputs

InputValue in scenarioClass
CurrencyUSDModel assumption
Horizon (years)25Model assumption
Discount rate8.00%Model assumption
opex.fixedDROPPED (0)Model assumption
residual_value.amountDROPPED (0)Model assumption
residual_value.yearDROPPEDModel assumption
capex[0..8].amountAll DROPPED (0)Model assumption
asset.ev_fleet.vehiclesDROPPED in this scenario (not used; scenario is per-charger destination use)Model assumption
asset.ev_fleet.km_per_yearDROPPED in this scenarioModel assumption
asset.ev_fleet.kwh_per_kmDROPPED in this scenarioModel assumption
asset.ev_fleet.electricity_per_kwhDROPPED in this scenarioModel assumption
asset.ev_fleet.diesel_l_per_kmDROPPED in this scenarioModel assumption
asset.ev_fleet.diesel_per_lDROPPED in this scenarioModel assumption
asset.ev_fleet.maint_ev_per_kmDROPPED in this scenarioModel assumption
asset.ev_fleet.maint_ice_per_kmDROPPED in this scenarioModel assumption
asset.ev_fleet.ice_capex_per_vehicleDROPPED in this scenarioModel assumption
Benefit stream (USD/yr)54,400.00 in years 1–25 (0 in year 0); undiscounted total 1,360,000; discounted total 580,707.82 at 8.00% over 25 yearsComputed (see §10)

Implication. Because capex, opex.fixed and residual_value are dropped, the model sees only the benefit stream. That is why simple payback and discounted payback are reported as 0.0 yr and IRR is n/a in the computed table — not because the project is free, but because no negative cash flows have been bound into this scenario. Adding any positive capex or opex.fixed will move payback away from zero and NPV down. The TCO/km EV (0.080 USD/km) and TCO/km ICE (0.256 USD/km) figures shown in the computed table are arithmetic outputs of the bounded model run and should not be edited independently of the inputs above.

4.2 Equipment limits (ABB Terra AC W43-P — OEM datasheet, family 6AGC105217)

5. Duty / HS / VAT stack

HS national lineProgramAs-ofSoT
8504.40 — static converters (commonly used for EV chargers; verify national line)Fiji import duty + VAT/fiscal duty2026-09-21PENDING

6. Process — what happens after you RFQ

  1. Submit the RFQ form above with qty, Incoterm, target cert, destination, email and company (POST to /rfq/ on https://tradvolt.com/rfq/).
  2. Tradvolt confirms specification, MOQ and certification scope within 48 hours.
  3. Indicative EXW pricing and freight estimate shared; HS line and duty/VAT treatment confirmed against the FRCS portal.
  4. Proforma invoice issued on agreed Incoterm; production slot reserved on PO.
  5. Pre-shipment inspection, export documentation and ocean booking to Suva (or nominated port), with ISPM 15 wood-packaging compliance where applicable (IPPC ISPM 15 list page: https://www.ippc.int/en/core-activities/standards-setting/ispms/).
  6. Importer handles customs clearance in Fiji using FRCS-confirmed HS line and duty/VAT rates.

7. Spec / datasheet link

The ABB Terra AC W43-P-CCO datasheet (SKU family 6AGC105217, Terra AC Generation 3, 22/43 kW variants) is hosted on the ABB E-mobility product page. Confirm the exact OEM datasheet revision/edition with your Tradvolt contact at RFQ stage before order release.

View ABB Terra AC W43-P-CCO datasheet (OEM page) Submit RFQ

8. FAQ

What does the scenario model actually say about this scenario?

NPV = USD 580,707.82 over a 25-year horizon at 8.00% discount rate; total undiscounted benefit = USD 1,360,000; total discounted benefit = USD 580,707.82; TCO/km EV = USD 0.080 vs ICE = USD 0.256; savings per km = USD 0.176; savings over horizon = USD 1,760,000.00; simple payback and discounted payback = 0.0 yr (capex, opex.fixed and residual_value are dropped in this bounded scenario).

Is this a firm quote?

No. The figures are ILLUSTRATIVE for TCO planning and not a quotation. Submit the RFQ form for confirmed pricing and lead time.

Which compliance marks are required for Fiji?

Fiji does not have a dedicated national EVSE safety mark in the scope of this page. Conformance to IEC 61851-1:2017 via a CB test certificate (IECEE 03:2023 rules) and applicable local acceptance should be confirmed with the importer and the Fiji Department of Energy before order.

What HS code applies?

EV chargers are commonly classified under 8504.40 (static converters) in many tariff regimes. The exact Fiji national line, duty and VAT rates are PENDING — to be looked up in the FRCS tariff schedule before order.

Can the payback change?

Yes. Adding any positive capex line item or opex.fixed will change payback and NPV. The 0.0 yr payback shown here is a direct consequence of those items being dropped in the bounded scenario, not of the project being costless.

What is the lead time?

Lead time depends on order quantity and certification scope; confirmed at RFQ. AC EVSE production lead times are typically weeks to months.

Do you handle Fiji customs clearance?

By default we quote on EXW/FOB/CIF Suva. The buyer (or its broker) handles FRCS clearance using the confirmed HS line and duty/VAT rates. DDP Suva is available on request.

Which OEM datasheet revision/edition does this page rely on?

The OEM citation is the ABB Terra AC W43-P product page (SKU family 6AGC105217, Terra AC Generation 3). Specific datasheet revision/edition codes are confirmed at RFQ against the live OEM PDF before order release.


9. Sources cited on this page

10. Computed tables (VERBATIM, computed)

TCO summary
MetricValue
CurrencyUSD
Horizon (years)25
Discount rate8.00 %
Total undiscounted cost (USD)0.0000
Total discounted cost / PV of costs (USD)0.0000
Total undiscounted benefit (USD)1,360,000.00
Total discounted benefit (USD)580,707.82
NPV (USD)580,707.82
IRRn/a
Simple payback (year)0.0000
Discounted payback (year)0.0000
TCO per km — EV (USD/km)0.0800
TCO per km — ICE (USD/km)0.2560
Savings per km (USD/km)0.1760
Savings over horizon (USD)1,760,000.00
Year-by-year cash flow
YearCost (USD)Benefit (USD)Net (USD)Discount factorDiscounted net (USD)Energy (kWh)
00.00000.00000.00001.000.00000.0000
10.000054,400.0054,400.000.925950,370.370.0000
20.000054,400.0054,400.000.857346,639.230.0000
30.000054,400.0054,400.000.793843,184.470.0000
40.000054,400.0054,400.000.735039,985.620.0000
50.000054,400.0054,400.000.680637,023.730.0000
60.000054,400.0054,400.000.630234,281.230.0000
70.000054,400.0054,400.000.583531,741.880.0000
80.000054,400.0054,400.000.540329,390.630.0000
90.000054,400.0054,400.000.500227,213.540.0000
100.000054,400.0054,400.000.463225,197.730.0000
110.000054,400.0054,400.000.428923,331.230.0000
120.000054,400.0054,400.000.397121,602.990.0000
130.000054,400.0054,400.000.367720,002.770.0000
140.000054,400.0054,400.000.340518,521.080.0000
150.000054,400.0054,400.000.315217,149.150.0000
160.000054,400.0054,400.000.291915,878.840.0000
170.000054,400.0054,400.000.270314,702.630.0000
180.000054,400.0054,400.000.250213,613.550.0000
190.000054,400.0054,400.000.231712,605.140.0000
200.000054,400.0054,400.000.214511,671.420.0000
210.000054,400.0054,400.000.198710,806.870.0000
220.000054,400.0054,400.000.183910,006.360.0000
230.000054,400.0054,400.000.17039,265.150.0000
240.000054,400.0054,400.000.15778,578.840.0000
250.000054,400.0054,400.000.14607,943.370.0000

Computed tables produced by the Tradvolt scenario model from the bounded scenario in §4.1. Numbers above are computed and must not be edited independently of the model.